Chapter at a glance
This chapter covers **Accounting for Labour**, explaining how businesses calculate, record, and control wages under different payment systems. It details the **time rate system** (payment based on hours worked) and **piece rate system** (payment based on output produced), along with concepts like **idle time, overtime, and labour cost control**. Practical problems illustrate wage calculations, differences between systems, and their advantages/disadvantages.
- Definition and classification of labour cost (direct vs. indirect)
- Time rate system: calculation, advantages, and disadvantages
- Piece rate system: calculation, merits, and demerits
- Idle time: types (normal vs. abnormal) and accounting treatment
- Overtime wages: calculation and rules for payment
- Labour cost control techniques (recruitment, training, timekeeping, etc.)
- Differences between time rate and piece rate systems
- Practical applications: wage computations under both systems
Exam focus: Focus on **solving numerical problems** (wage calculations under time/piece rate systems, overtime, and idle time) and **comparing the two wage systems** with their pros/cons, as these are frequently tested in both theory and practical questions.
Key formulas and definitions
- Time rate wages = Total Hours Worked × Wage Rate per Hour
- Piece rate wages = Number of Units Produced × Rate per Unit
- Rate per Unit = (Wage Rate per Hour × Standard Time per Unit) OR (Wage Rate per Hour ÷ Standard Output per Hour)
- Idle Time = Time Paid For − Time Actually Worked on Production
- Overtime Wages = Overtime Hours × Overtime Rate per Hour
On this page (5 sections)
Solutions and answers
Every theoretical question, practical problem and assignment from the source pages, solved in full with working notes, formulas and step-by-step computation. Covers the time rate system, the piece rate system and overtime. Values in Nepalese Rupees (Rs.).
Theoretical Questions
Very Short Answer 1–7 • Short Answer 1–7Question 1.1 — Define the labour cost.
- Labour cost is the total payment made to the workers for the physical and mental effort they put into converting raw material into finished goods.
- It includes wages, salaries, bonus, allowances, overtime payment and other benefits given to employees.
- It is divided into direct labour cost (traceable to a product) and indirect labour cost (not traceable, forming part of overheads).
Question 1.2 — Write any two examples of direct labour cost.
- Wages paid to a machine operator who actually works on the product.
- Wages paid to a carpenter making furniture, or to a tailor stitching a garment.
Other acceptable examples: wages of a weaver in a textile mill, wages of a mason on a construction job.
Question 1.3 — What is idle time?
- Idle time is the time for which a worker is paid but no production takes place.
- It is the difference between the time paid for and the time actually worked on production.
- It may be normal (unavoidable, e.g. tea break, machine set-up) or abnormal (avoidable, e.g. strike, power failure).
Question 1.4 — Explain piece rate system of wages payment.
- Under the piece rate system, wages are paid according to the quantity of output produced, not the time spent.
- A fixed rate is settled per unit, per piece or per job, and the worker is paid that rate for every unit completed.
- It rewards efficiency — a faster worker earns more — so it is also called payment by results.
Question 1.5 — Explain time rate system of wages payment.
- Under the time rate system, wages are paid according to the time the worker attends and works, irrespective of output produced.
- The rate may be fixed per hour, per day, per week or per month.
- It is also called the time wage system or payment by time, and it guarantees the worker a minimum earning.
Question 1.6 — Write any two differences between time and piece rate system.
- Basis of payment — under the time rate system wages depend on the time spent; under the piece rate system wages depend on the units produced.
- Effect of efficiency — under the time rate system an efficient and an inefficient worker earn the same amount; under the piece rate system the efficient worker earns more.
A third difference: quality of work is better protected under the time rate system, while quantity of output is higher under the piece rate system.
Question 1.7 — What do you mean by labour cost control?
- Labour cost control means keeping the labour cost per unit of output at the minimum without reducing the quality of work or the morale of workers.
- It is achieved through proper recruitment, training, time keeping, time booking, a sound wage system, and control of idle time and overtime.
- Its aim is not to reduce wage rates, but to raise efficiency so that more output is obtained from the same wage bill.
Question 2.1 — What do you understand by labour cost control?
- Labour cost control is the systematic effort of management to keep the labour cost per unit of output as low as possible, while maintaining the quality of output and the satisfaction of workers.
- It does not mean cutting wages — it means raising productivity so that the same wage bill yields more output.
The main techniques of labour cost control are:
- Proper recruitment and placement — the right worker in the right job.
- Training — a trained worker wastes less material and less time.
- Time keeping — recording arrival and departure to control attendance.
- Time booking — recording how much time was spent on which job, to reveal idle time.
- A suitable wage payment system — one that rewards efficiency.
- Control of idle time and overtime — investigating and eliminating avoidable causes.
- Control of labour turnover — reducing the cost of repeated recruitment and training.
Question 2.2 — Explain time rate system with its advantages and disadvantages.
Meaning: Under the time rate system, a worker is paid on the basis of the time spent at work — per hour, per day, per week or per month — regardless of the quantity of output produced.
Total Wages = Time Worked × Rate per Unit of TimeAdvantages:
- Simple to understand and easy to calculate, so disputes are rare.
- Assured minimum wage, which gives the worker security and satisfaction.
- Better quality of work, because the worker is not tempted to rush.
- Less wastage of material and less damage to tools and machinery.
- Accepted by trade unions, since all workers of a grade are treated equally.
- Suitable where output cannot be measured in units, or where the work is artistic, skilled or supervisory.
Disadvantages:
- No reward for efficiency — an efficient and an idle worker draw the same wage, which discourages the efficient one.
- Lower production, because there is no incentive to produce more.
- Close supervision needed, which increases the supervision cost.
- Idle time cannot be avoided, as the worker is paid for attendance rather than output.
- Labour cost per unit is uncertain, which makes cost estimation and quotation difficult.
Question 2.3 — Explain piece rate system with its merits and demerits.
Meaning: Under the piece rate system, a worker is paid on the basis of the quantity of output produced. A rate is fixed per unit or per job, and the worker earns that rate for every unit completed, irrespective of the time taken.
Total Wages = Units Produced × Rate per Unit Rate per Unit = Wage Rate per Hour × Standard Time per Unit (in hours)Merits:
- Rewards efficiency — the harder-working worker earns more, so effort is directly recognised.
- Increases production, because every extra unit brings extra earning.
- Labour cost per unit is fixed and known, which makes cost estimation, quotation and price fixing easy.
- Less supervision required, since the worker supervises themselves for their own gain.
- Idle time is not paid for, so idle time is automatically discouraged.
- Fixed overhead per unit falls, because output rises while fixed cost stays the same.
Demerits:
- Quality suffers, because the worker hurries to produce more units.
- No guaranteed minimum wage, so earnings become uncertain during illness, machine breakdown or shortage of material.
- Wastage of material and rough handling of machinery increase.
- Health of workers may suffer from overstrain in the effort to earn more.
- Opposed by trade unions, as it creates inequality of earnings among workers of the same grade.
- Not suitable where output cannot be measured in units, or where the work is artistic or supervisory.
Question 2.4 — What is idle time? Explain briefly the types of idle time.
Meaning: Idle time is the period for which a worker is paid but no productive work is obtained. It is the gap between the time paid for and the time actually spent on production.
Idle Time = Time Paid For − Time Actually Worked on ProductionTypes of idle time:
- Normal idle time — idle time that is unavoidable in the normal course of work. It cannot be eliminated, only minimised.
- Time taken in moving from the gate to the workplace.
- Tea break, rest and personal needs.
- Time for setting up the machine and receiving instructions.
- Waiting for the next job in the normal flow of work.
- Abnormal idle time — idle time that is avoidable and arises from causes that should not normally occur.
- Machine breakdown, power failure.
- Strike, lock-out, go-slow.
- Shortage of raw material due to poor planning.
- Fire, flood, accident or other abnormal event.
Question 2.5 — Explain briefly the reasons for normal idle time and abnormal idle time.
Reasons for normal idle time:
- Movement within the factory — time taken to travel from the factory gate to the department and between departments.
- Rest and personal needs — tea break, lunch break and unavoidable personal time allowed to every worker.
- Machine set-up and tool changing — time spent preparing the machine before actual work begins.
- Receiving instructions — time spent obtaining the job card, drawing or instructions from the supervisor.
- Normal waiting — short unavoidable waiting between the completion of one job and the issue of the next.
- Fatigue — the natural fall in the speed of work, allowed for in the standard time.
Reasons for abnormal idle time:
- Machine breakdown caused by poor maintenance.
- Power failure or failure of the water and steam supply.
- Shortage of raw material arising from defective purchasing or store keeping.
- Strike, lock-out or go-slow by the workers.
- Defective planning and scheduling of production, leaving workers without work.
- Accident, fire or flood and other natural calamities.
- Fall in demand leading to a deliberate cut in production while wages are still paid.
Question 2.6 — What are the differences between time rate system and piece rate system?
- Basis of payment — the time rate system pays for the time attended and worked; the piece rate system pays for the units actually produced.
- Formula — time rate: Time worked × Rate per hour; piece rate: Units produced × Rate per unit.
- Incentive to work — the time rate system offers no incentive to produce more; the piece rate system offers a direct incentive.
- Earnings of an efficient worker — under the time rate system they are the same as an inefficient worker's; under the piece rate system they are higher.
- Security of wages — the time rate system guarantees a minimum wage; the piece rate system gives no guarantee.
- Quality of output — better under the time rate system; likely to deteriorate under the piece rate system.
- Labour cost per unit — uncertain under the time rate system; fixed and known under the piece rate system.
- Supervision required — close and costly under the time rate system; less under the piece rate system.
- Payment for idle time — idle time is paid for under the time rate system; it is not paid for under the piece rate system.
- Suitability — the time rate system suits skilled, artistic and supervisory work and work whose output cannot be measured; the piece rate system suits repetitive, standardised work with measurable output.
Question 2.7 — Write any three disadvantages of piece wage system.
- Quality of output falls — because earning depends only on quantity, workers hurry and produce defective units, increasing rejection and inspection cost.
- No guaranteed minimum wage — if a machine breaks down, material runs short or the worker falls ill, earnings drop sharply, which creates insecurity and dissatisfaction.
- Wastage of material and damage to machinery — in the rush to produce more, workers handle material and equipment carelessly, raising the material and maintenance cost.
Other acceptable points: overstrain damaging the health of workers, and opposition from trade unions because earnings become unequal among workers of the same grade.
Practical Problems — Time Rate System
Question 1 to Question 10Key Formulas — Time Rate System
Total Wages = Total Hours Worked × Wage Rate per Hour Total Hours Worked = Working Hours per Day × Number of Working Days Wage Rate per Hour = Total Wages Earned ÷ Total Hours Worked Hours Worked = Output (units) × Standard Time per Unit (in hours) Overtime Hours = Total Hours Worked − Normal Hours Allowed Overtime Wages = Overtime Hours × Overtime Rate per HourGolden rule: under the time rate system the wage always follows the clock, never the output. Where output is given, first convert it into hours using the standard time, then apply the hourly rate.
Given: Total wages paid Rs. 650 • Number of working days in a week 5 days • Daily working hours 8 hours
Working Notes
WN 1 — Total hours worked during the week
Total Hours = Daily Working Hours × Number of Working Days = 8 hours × 5 days = 40 hoursWN 2 — Wage rate per hour
Wage Rate per Hour = Total Wages Paid ÷ Total Hours Worked = Rs. 650 ÷ 40 hours = Rs. 16.25 per hourStatement of Wage Rate per Hour
| Particulars | Amount / Hours |
|---|---|
| Total wages paid for the week | Rs. 650 |
| Daily working hours | 8 hrs |
| Number of working days in the week | 5 days |
| Total hours worked (8 × 5) | 40 hrs |
| Wage rate per hour (650 ÷ 40) | Rs. 16.25 |
Answer
- Wage rate per hour = Rs. 16.25
Given: Working hours per day = 8 hours • Hourly wage rate = Rs. 30 per hour • Working days per month = 25 days
Working Notes
WN 1 — Total hours worked in the month
Total Hours = 8 hours per day × 25 days = 200 hoursWN 2 — Total wages
Total Wages = Total Hours × Rate per Hour = 200 hours × Rs. 30 = Rs. 6,000Statement of Total Wages for the Month
| Particulars | Amount / Hours |
|---|---|
| Working hours per day | 8 hrs |
| Working days per month | 25 days |
| Total hours worked in the month (8 × 25) | 200 hrs |
| Hourly wage rate | Rs. 30 |
| Total wages for the month (200 × 30) | Rs. 6,000 |
Answer
- Total wages for the month = Rs. 6,000
Given: Output produced in the week = 60 units • Time taken for one unit = 3 hours • Wage rate = Rs. 200 per hour
ⓘ Important Rule
Output is given, but the question asks for wages under the time rate system. So the output must first be converted into hours using the time per unit — the units themselves are never multiplied by the hourly rate.
Working Notes
WN 1 — Total time worked
Total Hours = Output × Time per Unit = 60 units × 3 hours = 180 hoursWN 2 — Wages earned
Wages = Total Hours × Rate per Hour = 180 hours × Rs. 200 = Rs. 36,000Statement of Wages Earned
| Particulars | Amount / Hours |
|---|---|
| Units produced during the week | 60 units |
| Time required for one unit | 3 hrs |
| Total hours worked (60 × 3) | 180 hrs |
| Wage rate per hour | Rs. 200 |
| Total wages earned (180 × 200) | Rs. 36,000 |
Answer
- Wages earned during the week = Rs. 36,000
Given: Wage rate per hour = Rs. 28.5 • Number of working days = 6 days • Total wages earned = Rs. 855
Working Notes
WN 1 — Total hours worked (work the basic formula backwards)
Total Wages = Total Hours × Rate per Hour ∴ Total Hours = Total Wages ÷ Rate per Hour = Rs. 855 ÷ Rs. 28.5 = 30 hoursWN 2 — Daily working hours
Daily Working Hours = Total Hours ÷ Number of Working Days = 30 hours ÷ 6 days = 5 hours per dayStatement of Daily Working Hours
| Particulars | Amount / Hours |
|---|---|
| Total wages earned | Rs. 855 |
| Wage rate per hour | Rs. 28.50 |
| Total hours worked (855 ÷ 28.50) | 30 hrs |
| Number of working days | 6 days |
| Daily working hours (30 ÷ 6) | 5 hrs |
Answer
- Daily working hours = 5 hours
Given: Wage rate per hour Rs. 10 • Time required per unit 45 minutes • Output of Dipesh 30 units • Output of Amrit 40 units
Working Notes
WN 1 — Convert the standard time into hours
Time per Unit = 45 minutes ÷ 60 = 0.75 hourWN 2 — Hours worked by each worker
Dipesh : 30 units × 0.75 hr = 22.5 hours Amrit : 40 units × 0.75 hr = 30.0 hoursWN 3 — Wages of each worker at Rs. 10 per hour
Dipesh : 22.5 hours × Rs. 10 = Rs. 225 Amrit : 30.0 hours × Rs. 10 = Rs. 300Statement of Wages Payable
| Particulars | Dipesh | Amrit |
|---|---|---|
| Output (units) | 30 | 40 |
| Time allowed per unit (hours) | 0.75 | 0.75 |
| Total hours worked | 22.50 | 30.00 |
| Wage rate per hour (Rs.) | 10 | 10 |
| Total wages payable (Rs.) | 225 | 300 |
Answer
- Dipesh = Rs. 225
- Amrit = Rs. 300
Given: Standard time 30 seconds per unit • Wage rate Rs. 200 per hour • Output 600 units
Working Notes
WN 1 — Total time worked (a)
Total Time = Output × Standard Time per Unit = 600 units × 30 seconds = 18,000 seconds 18,000 seconds ÷ 60 = 300 minutes 300 minutes ÷ 60 = 5 hoursWN 2 — Earning during the week (b)
Earning = Total Hours × Rate per Hour = 5 hours × Rs. 200 = Rs. 1,000Statement of Time Worked and Earning
| Particulars | Amount / Time |
|---|---|
| Output (units) | 600 |
| Standard time per unit | 30 sec |
| Total time in seconds (600 × 30) | 18,000 sec |
| (a) Total time worked (18,000 ÷ 3,600) | 5 hrs |
| Wage rate per hour | Rs. 200 |
| (b) Earning during the week (5 × 200) | Rs. 1,000 |
Answer
- (a) Total time worked = 5 hours
- (b) Earning of the worker = Rs. 1,000
Given: Wage rate Rs. 500 per day of 8 working hours per day • Hours worked during the week — X 40 hours, Y 42 hours, Z 45 hours
Working Notes
WN 1 — Convert the daily rate into an hourly rate
Rate per Hour = Rate per Day ÷ Working Hours per Day = Rs. 500 ÷ 8 hours = Rs. 62.50 per hourWN 2 — Wages of each worker
X : 40 hours × Rs. 62.50 = Rs. 2,500.00 Y : 42 hours × Rs. 62.50 = Rs. 2,625.00 Z : 45 hours × Rs. 62.50 = Rs. 2,812.50Statement of Total Wages
| Particulars | X | Y | Z |
|---|---|---|---|
| Hours worked during the week | 40 | 42 | 45 |
| Wage rate per hour (Rs. 500 ÷ 8) | 62.50 | 62.50 | 62.50 |
| Total wages (Rs.) | 2,500.00 | 2,625.00 | 2,812.50 |
Answer
- X = Rs. 2,500
- Y = Rs. 2,625
- Z = Rs. 2,812.50
- Total wages of all three workers = Rs. 7,937.50
Given: Normal wage rate per hour Rs. 15 • Overtime wage rate two times of normal rate • Daily working hours 8 hrs • Total working days in a month 25 days • Total worked hours 250 hours
Key Rules for Overtime
- Normal hours are the hours the worker is expected to work — daily hours × working days.
- Overtime hours are the excess of the hours actually worked over those normal hours.
- The normal hours are paid at the normal rate and only the overtime hours get the higher rate. The overtime hours must never be paid twice.
Working Notes
WN 1 — Normal hours for the month
Normal Hours = Daily Working Hours × Working Days = 8 hours × 25 days = 200 hoursWN 2 — Overtime hours (a)
Overtime Hours = Total Hours Worked − Normal Hours = 250 hours − 200 hours = 50 hoursWN 3 — Overtime rate per hour
Overtime Rate = 2 × Normal Rate = 2 × Rs. 15 = Rs. 30 per hourWN 4 — Total wages for the month (b)
Normal wages = 200 hours × Rs. 15 = Rs. 3,000 Overtime wages = 50 hours × Rs. 30 = Rs. 1,500 ---------- Total wages Rs. 4,500Statement of Total Wages for the Month
| Particulars | Hours | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|
| Normal time wages (8 hrs × 25 days) | 200 | 15 | 3,000 |
| Overtime wages (250 − 200) | 50 | 30 | 1,500 |
| Total wages in a month | 250 | — | 4,500 |
Answer
- (a) Overtime hours = 50 hours
- (b) Total wages in a month = Rs. 4,500
Given: Normal working hours 7 hrs per day • Normal rate Rs. 10 per hour • Overtime rate 150% of normal rate. Hours worked — Sunday 10, Monday 7, Tuesday 9, Wednesday 12, Thursday 8, Friday 6.
Key Rule — Overtime must be found DAY BY DAY
Here the normal limit is 7 hours per day, so overtime has to be worked out separately for each day. It is wrong to add up all 52 hours and compare them with a weekly total, because a short day (Friday, 6 hours) does not cancel out the overtime of a long day (Wednesday, 12 hours).
Overtime Rate = 150% of Rs. 10 = Rs. 15 per hourWorking Notes
WN 1 — Day-wise split of normal hours and overtime hours
Day Worked Normal (max 7) Overtime Sunday 10 7 3 Monday 7 7 0 Tuesday 9 7 2 Wednesday 12 7 5 Thursday 8 7 1 Friday 6 6 0 ------ ------ ------ Total 52 41 11WN 2 — Earnings
Normal wages = 41 hours × Rs. 10 = Rs. 410 Overtime wages = 11 hours × Rs. 15 = Rs. 165 --------- Total earnings Rs. 575Statement of Day-wise Hours
| Days | Hours Worked | Normal Hours | Overtime Hours |
|---|---|---|---|
| Sunday | 10 | 7 | 3 |
| Monday | 7 | 7 | — |
| Tuesday | 9 | 7 | 2 |
| Wednesday | 12 | 7 | 5 |
| Thursday | 8 | 7 | 1 |
| Friday | 6 | 6 | — |
| Total | 52 | 41 | 11 |
Statement of Earnings
| Particulars | Hours | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|
| Normal time wages | 41 | 10 | 410 |
| Overtime wages (150% of Rs. 10) | 11 | 15 | 165 |
| Total earnings of the worker | 52 | — | 575 |
Answer
- Total earnings of the worker = Rs. 575
Given: Standard working hours per week 42 hours • Hours actually worked 55 hours • Rs. 10 per hour for normal time • Rs. 15 per hour for overtime
Working Notes
WN 1 — Overtime hours
Overtime Hours = Hours Worked − Standard Hours = 55 hours − 42 hours = 13 hoursWN 2 — Total wages
Normal wages = 42 hours × Rs. 10 = Rs. 420 Overtime wages = 13 hours × Rs. 15 = Rs. 195 --------- Total wages Rs. 615Statement of Weekly Wages
| Particulars | Hours | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|
| Normal time wages (standard hours) | 42 | 10 | 420 |
| Overtime wages (55 − 42) | 13 | 15 | 195 |
| Total wages earned per week | 55 | — | 615 |
Answer
- Total wages earned per week = Rs. 615
Practical Problems — Piece Rate System
Question 11 to Question 18Key Formulas — Piece Rate System
Total Wages = Units Produced × Rate per Unit Rate per Unit = Wage Rate per Hour × Standard Time per Unit (in hours) or = Wage Rate per Hour ÷ Standard Output per Hour Standard Output per Hour = 60 ÷ Standard Minutes per Unit = 3,600 ÷ Standard Seconds per Unit Total Output = Total Hours Worked × Output per HourGolden rule: under the piece rate system the wage always follows the output, never the clock. When only an hourly rate is given, the first step is always to derive the rate per unit.
Given: Output of product B during the week = 1,000 units • Wages to be paid Rs. 8 per unit
Working Notes
WN 1 — Total wages
Total Wages = Units Produced × Rate per Unit = 1,000 units × Rs. 8 = Rs. 8,000Statement of Total Wages
| Particulars | Amount / Units |
|---|---|
| Units of product B produced in the week | 1,000 |
| Wage rate per unit | Rs. 8 |
| Total wages for the week (1,000 × 8) | Rs. 8,000 |
Answer
- Total wages during the week = Rs. 8,000
Given: Wage rate per hour Rs. 12 • Standard time 30 minutes per unit • Production — Bikash 40 units, Sandesh 20 units
Working Notes
WN 1 — Standard time in hours
Standard Time per Unit = 30 minutes ÷ 60 = 0.5 hourWN 2 — Wage rate per unit (a)
Rate per Unit = Rate per Hour × Standard Time per Unit = Rs. 12 × 0.5 hour = Rs. 6 per unitWN 3 — Earnings of each worker (b)
Bikash : 40 units × Rs. 6 = Rs. 240 Sandesh : 20 units × Rs. 6 = Rs. 120Statement of Earnings
| Particulars | Bikash | Sandesh |
|---|---|---|
| Units produced | 40 | 20 |
| Wage rate per unit (Rs.) | 6 | 6 |
| Earnings (Rs.) | 240 | 120 |
Answer
- (a) Wage rate per unit = Rs. 6
- (b) Bikash = Rs. 240 • Sandesh = Rs. 120
Given: Weekly working hours 30 hours • Weeks worked during the year 50 weeks • Hourly output 10 units • Wage rate per unit Rs. 20
Working Notes
WN 1 — Total hours worked during the year
Total Hours = Weekly Hours × Number of Weeks = 30 hours × 50 weeks = 1,500 hoursWN 2 — Total output for the year
Total Output = Total Hours × Output per Hour = 1,500 hours × 10 units = 15,000 unitsWN 3 — Wages payable
Total Wages = Total Output × Rate per Unit = 15,000 units × Rs. 20 = Rs. 3,00,000Statement of Wages Payable for the Year
| Particulars | Amount / Units |
|---|---|
| Weekly working hours | 30 hrs |
| Number of weeks worked | 50 |
| Total hours worked (30 × 50) | 1,500 hrs |
| Output per hour | 10 units |
| Total output (1,500 × 10) | 15,000 units |
| Wage rate per unit | Rs. 20 |
| Wages payable for the year (15,000 × 20) | Rs. 3,00,000 |
Answer
- Wages payable to the worker = Rs. 3,00,000
Given: Output produced by a worker 600 units • Time allowed for 5 units of output 1 hour • Wage rate per hour Rs. 120
Working Notes
WN 1 — Standard output per hour
1 hour is allowed for 5 units ∴ Standard Output per Hour = 5 unitsWN 2 — Wage rate per unit
Rate per Unit = Rate per Hour ÷ Output per Hour = Rs. 120 ÷ 5 units = Rs. 24 per unitWN 3 — Wage amount
Total Wages = 600 units × Rs. 24 = Rs. 14,400Statement of Wage Amount
| Particulars | Amount / Units |
|---|---|
| Output produced | 600 units |
| Standard output per hour | 5 units |
| Wage rate per hour | Rs. 120 |
| Wage rate per unit (120 ÷ 5) | Rs. 24 |
| Wage amount of the worker (600 × 24) | Rs. 14,400 |
Answer
- Wage amount of the worker = Rs. 14,400
Given: Standard time allowed 30 seconds per unit • Normal wage rate in the factory Rs. 15 per hour • Output of Mrs. Bijaya 10,000 units • Output of Mr. Shamir 12,000 units
Working Notes
WN 1 — Standard output per hour (a)
1 hour = 60 × 60 = 3,600 seconds Standard Output per Hour = 3,600 seconds ÷ 30 seconds per unit = 120 units per hourWN 2 — Piece wage rate (b)
Piece Rate = Rate per Hour ÷ Standard Output per Hour = Rs. 15 ÷ 120 units = Re. 0.125 per unitWN 3 — Wages earned by each worker (c)
Mrs. Bijaya : 10,000 units × Re. 0.125 = Rs. 1,250 Mr. Shamir : 12,000 units × Re. 0.125 = Rs. 1,500Statement of Wages Earned
| Particulars | Mrs. Bijaya | Mr. Shamir |
|---|---|---|
| Output (units) | 10,000 | 12,000 |
| Piece wage rate (Rs.) | 0.125 | 0.125 |
| Wages earned (Rs.) | 1,250 | 1,500 |
Answer
- (a) Standard output per hour = 120 units
- (b) Piece wage rate = Re. 0.125 per unit
- (c) Mrs. Bijaya = Rs. 1,250 • Mr. Shamir = Rs. 1,500
Given: Wage rate Rs. 40 per hour • Standard production 2 units per hour • Output for the week — A 40 units, B 45 units
Working Notes
WN 1 — Hours worked by each worker (for the time rate system)
Hours Worked = Output ÷ Standard Production per Hour A : 40 units ÷ 2 units per hour = 20.0 hours B : 45 units ÷ 2 units per hour = 22.5 hoursWN 2 — Wages under the time rate system
A : 20.0 hours × Rs. 40 = Rs. 800 B : 22.5 hours × Rs. 40 = Rs. 900WN 3 — Piece rate per unit
Piece Rate = Rate per Hour ÷ Standard Production per Hour = Rs. 40 ÷ 2 units = Rs. 20 per unitWN 4 — Wages under the piece rate system
A : 40 units × Rs. 20 = Rs. 800 B : 45 units × Rs. 20 = Rs. 900Comparative Statement of Wages
| Particulars | A | B |
|---|---|---|
| Output for the week (units) | 40 | 45 |
| Standard production per hour (units) | 2 | 2 |
| Hours worked (output ÷ 2) | 20.0 | 22.5 |
| Wages under time rate system (hours × Rs. 40) | 800 | 900 |
| Piece rate per unit (Rs. 40 ÷ 2) | Rs. 20 | Rs. 20 |
| Wages under piece rate system (units × Rs. 20) | 800 | 900 |
ⓘ Note — Why both systems give the same figure
Both workers are producing at exactly the standard rate of 2 units per hour. Whenever a worker's actual efficiency equals the standard, the time rate and the piece rate give an identical wage. A worker producing faster than the standard would earn more under the piece rate; a slower worker would earn less.
Answer
- A = Rs. 800 under both the time rate and the piece rate system.
- B = Rs. 900 under both the time rate and the piece rate system.
Given: Monthly working days 25 days • Working hours per day 7 hours • Hourly output 5 units • Wage rate per unit Rs. 50
Working Notes
WN 1 — Total working days in the year
Total Days = 25 days per month × 12 months = 300 daysWN 2 — Total hours worked in the year
Total Hours = 300 days × 7 hours per day = 2,100 hoursWN 3 — Total output for the year
Total Output = 2,100 hours × 5 units per hour = 10,500 unitsWN 4 — Total wages
Total Wages = 10,500 units × Rs. 50 = Rs. 5,25,000Statement of Total Wages for the Year
| Particulars | Amount / Units |
|---|---|
| Monthly working days | 25 days |
| Yearly working days (25 × 12) | 300 days |
| Working hours per day | 7 hrs |
| Total hours in the year (300 × 7) | 2,100 hrs |
| Hourly output | 5 units |
| Total output (2,100 × 5) | 10,500 units |
| Wage rate per unit | Rs. 50 |
| Total wages for the year (10,500 × 50) | Rs. 5,25,000 |
Answer
- Total wages amount for the year = Rs. 5,25,000
Given: Standard time allowed for one unit of output 15 minutes • Hourly wage rate Rs. 40 per hour • Output of the worker 28 units in a day
Working Notes
WN 1 — Standard time in hours
Standard Time per Unit = 15 minutes ÷ 60 = 0.25 hourWN 2 — Wage rate per unit
Rate per Unit = Rate per Hour × Standard Time per Unit = Rs. 40 × 0.25 hour = Rs. 10 per unit (Check: standard output per hour = 60 ÷ 15 = 4 units; Rs. 40 ÷ 4 units = Rs. 10 per unit — same answer.)WN 3 — Total earning
Total Earning = 28 units × Rs. 10 = Rs. 280Statement of Total Earning
| Particulars | Amount / Units |
|---|---|
| Standard time allowed per unit | 15 min (0.25 hr) |
| Hourly wage rate | Rs. 40 |
| Wage rate per unit (40 × 0.25) | Rs. 10 |
| Output in a day | 28 units |
| Total earning of the worker (28 × 10) | Rs. 280 |
Answer
- Total earning of the worker = Rs. 280
Assignments — Time Rate System
Question 1 to Question 9Given: Daily working hours 7 hours • Number of working days in a month 16 days • Total wages earned Rs. 6,272
Working Notes
WN 1 — Total hours worked
Total Hours = 7 hours per day × 16 days = 112 hoursWN 2 — Wage rate per hour
Rate per Hour = Total Wages ÷ Total Hours = Rs. 6,272 ÷ 112 hours = Rs. 56 per hourStatement of Wage Rate per Hour
| Particulars | Amount / Hours |
|---|---|
| Total wages earned | Rs. 6,272 |
| Daily working hours | 7 hrs |
| Working days in the month | 16 days |
| Total hours worked (7 × 16) | 112 hrs |
| Wage rate per hour (6,272 ÷ 112) | Rs. 56 |
Answer
- Wage rate per hour = Rs. 56
Given: Working hours per day = 6 hours • Hourly wage rate = Rs. 20 per hour • Working days per month = 27 days
Working Notes
WN 1 — Total hours worked in the month
Total Hours = 6 hours × 27 days = 162 hoursWN 2 — Total wages
Total Wages = 162 hours × Rs. 20 = Rs. 3,240Statement of Total Wages for the Month
| Particulars | Amount / Hours |
|---|---|
| Working hours per day | 6 hrs |
| Working days per month | 27 days |
| Total hours worked (6 × 27) | 162 hrs |
| Hourly wage rate | Rs. 20 |
| Total wages for the month (162 × 20) | Rs. 3,240 |
Answer
- Total wages for the month = Rs. 3,240
Given: Output during the week = 70 units • Time taken for one unit = 4 hours • Wage rate = Rs. 250 per hour
Working Notes
WN 1 — Total time worked
Total Hours = 70 units × 4 hours = 280 hoursWN 2 — Wages earned
Wages = 280 hours × Rs. 250 = Rs. 70,000Statement of Wages Earned
| Particulars | Amount / Hours |
|---|---|
| Units produced during the week | 70 units |
| Time required per unit | 4 hrs |
| Total hours worked (70 × 4) | 280 hrs |
| Wage rate per hour | Rs. 250 |
| Wages earned during the week (280 × 250) | Rs. 70,000 |
Answer
- Wages earned during the week = Rs. 70,000
Given: Wage rate per hour Rs. 25 • Number of working days 10 days • Total wages earned Rs. 1,750
Working Notes
WN 1 — Total hours worked
Total Hours = Total Wages ÷ Rate per Hour = Rs. 1,750 ÷ Rs. 25 = 70 hoursWN 2 — Daily working hours
Daily Hours = 70 hours ÷ 10 days = 7 hours per dayStatement of Daily Working Hours
| Particulars | Amount / Hours |
|---|---|
| Total wages earned | Rs. 1,750 |
| Wage rate per hour | Rs. 25 |
| Total hours worked (1,750 ÷ 25) | 70 hrs |
| Number of working days | 10 days |
| Daily working hours (70 ÷ 10) | 7 hrs |
Answer
- Daily working hours = 7 hours
Given: Wage rate per hour Rs. 2 • Time required per unit 30 minutes • Output of X 70 units • Output of Y 80 units
Working Notes
WN 1 — Standard time in hours
Time per Unit = 30 minutes ÷ 60 = 0.5 hourWN 2 — Hours worked by each worker
X : 70 units × 0.5 hr = 35 hours Y : 80 units × 0.5 hr = 40 hoursWN 3 — Wages at Rs. 2 per hour
X : 35 hours × Rs. 2 = Rs. 70 Y : 40 hours × Rs. 2 = Rs. 80Statement of Wages Payable
| Particulars | X | Y |
|---|---|---|
| Output (units) | 70 | 80 |
| Time allowed per unit (hours) | 0.5 | 0.5 |
| Total hours worked | 35 | 40 |
| Wage rate per hour (Rs.) | 2 | 2 |
| Total wages payable (Rs.) | 70 | 80 |
Answer
- X = Rs. 70
- Y = Rs. 80
Given: Standard time 20 minutes per unit • Wage rate Rs. 150 per hour • Output 150 units
Working Notes
WN 1 — Total time worked (a)
Total Time = 150 units × 20 minutes = 3,000 minutes 3,000 minutes ÷ 60 = 50 hoursWN 2 — Earning during the week (b)
Earning = 50 hours × Rs. 150 = Rs. 7,500Statement of Time Worked and Earning
| Particulars | Amount / Time |
|---|---|
| Output (units) | 150 |
| Standard time per unit | 20 min |
| Total time in minutes (150 × 20) | 3,000 min |
| (a) Total time worked (3,000 ÷ 60) | 50 hrs |
| Wage rate per hour | Rs. 150 |
| (b) Earning during the week (50 × 150) | Rs. 7,500 |
Answer
- (a) Total time worked = 50 hours
- (b) Earning of the worker = Rs. 7,500
Given: Wage rate Rs. 400 per day of 8 working hours per day • Hours worked — P 30 hours, Q 35 hours, R 40 hours
Working Notes
WN 1 — Hourly wage rate
Rate per Hour = Rs. 400 ÷ 8 hours = Rs. 50 per hourWN 2 — Wages of each worker
P : 30 hours × Rs. 50 = Rs. 1,500 Q : 35 hours × Rs. 50 = Rs. 1,750 R : 40 hours × Rs. 50 = Rs. 2,000Statement of Total Wages
| Particulars | P | Q | R |
|---|---|---|---|
| Hours worked during the week | 30 | 35 | 40 |
| Wage rate per hour (Rs. 400 ÷ 8) | 50 | 50 | 50 |
| Total wages (Rs.) | 1,500 | 1,750 | 2,000 |
Answer
- P = Rs. 1,500 • Q = Rs. 1,750 • R = Rs. 2,000
- Total wages of all three workers = Rs. 5,250
Given: Normal wage rate per hour Rs. 50 • Overtime wage rate is 120% of normal rate • Daily working hours 7 hrs • Total working days in a month 25 days • Total working hours 200 hours
Working Notes
WN 1 — Normal hours for the month
Normal Hours = 7 hours × 25 days = 175 hoursWN 2 — Overtime hours (a)
Overtime Hours = 200 hours − 175 hours = 25 hoursWN 3 — Overtime rate per hour
Overtime Rate = 120% of Rs. 50 = Rs. 50 × 120/100 = Rs. 60 per hourWN 4 — Total wages for the month (b)
Normal wages = 175 hours × Rs. 50 = Rs. 8,750 Overtime wages = 25 hours × Rs. 60 = Rs. 1,500 ----------- Total wages Rs. 10,250Statement of Total Wages for the Month
| Particulars | Hours | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|
| Normal time wages (7 hrs × 25 days) | 175 | 50 | 8,750 |
| Overtime wages (200 − 175) | 25 | 60 | 1,500 |
| Total wages in a month | 200 | — | 10,250 |
Answer
- (a) Overtime hours = 25 hours
- (b) Total wages in a month = Rs. 10,250
Given: Normal working hours 8 hrs per day • Normal rate Rs. 12 per hour • Overtime rate 150% of normal rate. Hours worked — Sunday 11, Monday 8, Tuesday 9, Wednesday 12, Thursday 10, Friday 5.
Key Rule
The normal limit is 8 hours per day, so overtime must be extracted day by day. Friday's short day of 5 hours does not absorb the overtime of the longer days.
Overtime Rate = 150% of Rs. 12 = Rs. 18 per hourWorking Notes
WN 1 — Day-wise split of normal hours and overtime hours
Day Worked Normal (max 8) Overtime Sunday 11 8 3 Monday 8 8 0 Tuesday 9 8 1 Wednesday 12 8 4 Thursday 10 8 2 Friday 5 5 0 ------ ------ ------ Total 55 45 10WN 2 — Earnings
Normal wages = 45 hours × Rs. 12 = Rs. 540 Overtime wages = 10 hours × Rs. 18 = Rs. 180 --------- Total earnings Rs. 720Statement of Day-wise Hours
| Days | Hours Worked | Normal Hours | Overtime Hours |
|---|---|---|---|
| Sunday | 11 | 8 | 3 |
| Monday | 8 | 8 | — |
| Tuesday | 9 | 8 | 1 |
| Wednesday | 12 | 8 | 4 |
| Thursday | 10 | 8 | 2 |
| Friday | 5 | 5 | — |
| Total | 55 | 45 | 10 |
Statement of Earnings
| Particulars | Hours | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|
| Normal time wages | 45 | 12 | 540 |
| Overtime wages (150% of Rs. 12) | 10 | 18 | 180 |
| Total earnings of the worker | 55 | — | 720 |
Answer
- Total earnings of the worker = Rs. 720
Assignments — Piece Rate System & Project Work
Question 10 to Question 18 • Project WorkGiven: Output of product B during the week = 1,500 units • Wages to be paid Rs. 6 per unit
Working Notes
Total Wages = Units Produced × Rate per Unit = 1,500 units × Rs. 6 = Rs. 9,000Statement of Total Wages
| Particulars | Amount / Units |
|---|---|
| Units of product B produced | 1,500 |
| Wage rate per unit | Rs. 6 |
| Total wages for the week (1,500 × 6) | Rs. 9,000 |
Answer
- Total wages during the week = Rs. 9,000
Given: Wage rate per hour Rs. 15 • Standard time 20 minutes per unit • Production — Basu 30 units, Ram 40 units
Working Notes
WN 1 — Standard time in hours
Standard Time per Unit = 20 minutes ÷ 60 = 1/3 hourWN 2 — Wage rate per unit (a)
Rate per Unit = Rs. 15 × 1/3 hour = Rs. 5 per unit (Check: standard output per hour = 60 ÷ 20 = 3 units; Rs. 15 ÷ 3 units = Rs. 5 per unit.)WN 3 — Earnings (b)
Basu : 30 units × Rs. 5 = Rs. 150 Ram : 40 units × Rs. 5 = Rs. 200Statement of Earnings
| Particulars | Basu | Ram |
|---|---|---|
| Units produced | 30 | 40 |
| Wage rate per unit (Rs.) | 5 | 5 |
| Earnings (Rs.) | 150 | 200 |
Answer
- (a) Wage rate per unit = Rs. 5
- (b) Basu = Rs. 150 • Ram = Rs. 200
Given: Weekly working hours 25 hours • Weeks worked during the year 42 weeks • Hourly output 6 units • Wage rate per unit Rs. 15
Working Notes
WN 1 — Total hours worked during the year
Total Hours = 25 hours × 42 weeks = 1,050 hoursWN 2 — Total output for the year
Total Output = 1,050 hours × 6 units = 6,300 unitsWN 3 — Wages payable
Total Wages = 6,300 units × Rs. 15 = Rs. 94,500Statement of Wages Payable for the Year
| Particulars | Amount / Units |
|---|---|
| Weekly working hours | 25 hrs |
| Number of weeks worked | 42 |
| Total hours worked (25 × 42) | 1,050 hrs |
| Output per hour | 6 units |
| Total output (1,050 × 6) | 6,300 units |
| Wage rate per unit | Rs. 15 |
| Wages payable for the year (6,300 × 15) | Rs. 94,500 |
Answer
- Wages payable for the year = Rs. 94,500
Given: Output produced by a worker 500 units • Time allowed for 2 units of output ½ hour • Wage rate per hour Rs. 120
Working Notes
WN 1 — Standard output per hour
2 units are allowed ½ hour ∴ In 1 hour, output = 2 units × 2 = 4 units per hourWN 2 — Wage rate per unit
Rate per Unit = Rs. 120 ÷ 4 units = Rs. 30 per unitWN 3 — Wage amount
Total Wages = 500 units × Rs. 30 = Rs. 15,000Statement of Wage Amount
| Particulars | Amount / Units |
|---|---|
| Output produced | 500 units |
| Time allowed for 2 units | ½ hr |
| Standard output per hour (2 × 2) | 4 units |
| Wage rate per hour | Rs. 120 |
| Wage rate per unit (120 ÷ 4) | Rs. 30 |
| Wage amount of the worker (500 × 30) | Rs. 15,000 |
Answer
- Wage amount of the worker = Rs. 15,000
Given: Standard time allowed 15 seconds per unit • Normal wage rate Rs. 25 per hour • Output of Mr. Yamlal 5,000 units • Output of Mr. Pomlal 7,000 units
Working Notes
WN 1 — Standard output per hour (a)
1 hour = 3,600 seconds Standard Output per Hour = 3,600 ÷ 15 seconds = 240 units per hourWN 2 — Piece wage rate (b)
Piece Rate = Rs. 25 ÷ 240 units = Re. 0.104 per unit (rounded)WN 3 — Wages earned (c)
Mr. Yamlal : 5,000 units × Re. 0.104 = Rs. 520 Mr. Pomlal : 7,000 units × Re. 0.104 = Rs. 728Statement of Wages Earned
| Particulars | Mr. Yamlal | Mr. Pomlal |
|---|---|---|
| Output (units) | 5,000 | 7,000 |
| Piece wage rate (Rs.) | 0.104 | 0.104 |
| Wages earned (Rs.) | 520 | 728 |
ⓘ Note on rounding
The exact piece rate is Rs. 25 ÷ 240 = Re. 0.10416..., which the textbook rounds to Re. 0.104. The wages have been computed with the rounded rate so that they agree with the printed answer (Rs. 520 and Rs. 728). Using the unrounded rate would give Rs. 520.83 and Rs. 729.17.
Answer
- (a) Standard output per hour = 240 units
- (b) Piece wage rate = Re. 0.104 per unit
- (c) Mr. Yamlal = Rs. 520 • Mr. Pomlal = Rs. 728
Given: Weekly working hours 48 hours • Number of weeks worked in a year 30 weeks • Wage rate per unit Rs. 10 • Production per hour 20 units
Working Notes
WN 1 — Total hours worked during the year
Total Hours = 48 hours × 30 weeks = 1,440 hoursWN 2 — Total output for the year
Total Output = 1,440 hours × 20 units = 28,800 unitsWN 3 — Earning of the worker
Earning = 28,800 units × Rs. 10 = Rs. 2,88,000Statement of Earning for the Year
| Particulars | Amount / Units |
|---|---|
| Weekly working hours | 48 hrs |
| Number of weeks worked | 30 |
| Total hours worked (48 × 30) | 1,440 hrs |
| Production per hour | 20 units |
| Total output (1,440 × 20) | 28,800 units |
| Wage rate per unit | Rs. 10 |
| Earning of the worker (28,800 × 10) | Rs. 2,88,000 |
Answer
- Earning of the worker = Rs. 2,88,000
Given: Normal rate per hour Rs. 60 • Standard time per unit 20 min • Mr. Riddhan produced 400 units
Working Notes
WN 1 — Piece rate per unit
Standard Time per Unit = 20 minutes ÷ 60 = 1/3 hour Piece Rate = Rs. 60 × 1/3 hour = Rs. 20 per unitWN 2 — Earnings
Earnings = 400 units × Rs. 20 = Rs. 8,000Statement of Earnings of Mr. Riddhan
| Particulars | Amount / Units |
|---|---|
| Standard time per unit | 20 min (1/3 hr) |
| Normal rate per hour | Rs. 60 |
| Piece rate per unit (60 × 1/3) | Rs. 20 |
| Units produced | 400 |
| Earnings of Mr. Riddhan (400 × 20) | Rs. 8,000 |
Answer
- Earnings of Mr. Riddhan = Rs. 8,000
Given: Wage rate per hour = Rs. 50 • Standard output = 6 minutes to produce one unit of output • Actual output in a day — A 100 units, B 150 units, C 200 units, D 300 units
Working Notes
WN 1 — Standard output per hour and piece rate
Standard Output per Hour = 60 minutes ÷ 6 minutes = 10 units Piece Rate per Unit = Rs. 50 ÷ 10 units = Rs. 5 per unitWN 2 — Hours worked by each worker (output × 6 minutes)
A : 100 units × 6 min = 600 min = 10 hours B : 150 units × 6 min = 900 min = 15 hours C : 200 units × 6 min = 1,200 min = 20 hours D : 300 units × 6 min = 1,800 min = 30 hoursWN 3 — Wages under the time rate system (hours × Rs. 50)
A : 10 hours × Rs. 50 = Rs. 500 B : 15 hours × Rs. 50 = Rs. 750 C : 20 hours × Rs. 50 = Rs. 1,000 D : 30 hours × Rs. 50 = Rs. 1,500WN 4 — Wages under the piece rate system (units × Rs. 5)
A : 100 units × Rs. 5 = Rs. 500 B : 150 units × Rs. 5 = Rs. 750 C : 200 units × Rs. 5 = Rs. 1,000 D : 300 units × Rs. 5 = Rs. 1,500Comparative Statement of Wages Payable
| Particulars | A | B | C | D |
|---|---|---|---|---|
| Actual output (units) | 100 | 150 | 200 | 300 |
| Hours worked (units × 6 min) | 10 | 15 | 20 | 30 |
| Wages under time rate system (Rs.) | 500 | 750 | 1,000 | 1,500 |
| Wages under piece rate system (Rs.) | 500 | 750 | 1,000 | 1,500 |
ⓘ Note
All four workers are producing at exactly the standard rate of 10 units per hour, so the two systems yield an identical wage for each worker. The printed answer key in the source page is cut off at the right edge after "Rs. 15..", which is Rs. 1,500 for worker D as computed above.
Answer
- A = Rs. 500 • B = Rs. 750 • C = Rs. 1,000 • D = Rs. 1,500 under both systems.
Given: Output during March 2,000 units • Wage rate Rs. 20 per hour • Estimated time to produce one unit 30 minutes
Working Notes
WN 1 — Standard time in hours and piece rate
Standard Time per Unit = 30 minutes ÷ 60 = 0.5 hour Piece Rate per Unit = Rs. 20 × 0.5 hour = Rs. 10 per unitWN 2 — Wages under the piece rate system
Total Wages = 2,000 units × Rs. 10 = Rs. 20,000WN 3 — Wages under the time rate system
Hours Worked = 2,000 units × 0.5 hour = 1,000 hours Total Wages = 1,000 hours × Rs. 20 = Rs. 20,000Comparative Statement of Total Wages
| Particulars | Piece Rate System | Time Rate System |
|---|---|---|
| Output (units) | 2,000 | 2,000 |
| Basis of payment | Rs. 10 per unit | Rs. 20 per hour |
| Quantity used for payment | 2,000 units | 1,000 hrs |
| Total wages (Rs.) | 20,000 | 20,000 |
ⓘ Note
The worker took exactly the estimated (standard) time for the output produced, so both systems give the same wage of Rs. 20,000. The printed answer key in the source page is cut off at the right edge after "Rs. 20", which is Rs. 20,000 as computed above.
Answer
- Total wages under the piece rate system = Rs. 20,000
- Total wages under the time rate system = Rs. 20,000
Required in the report: (a) Name and address of the manufacturing company visited • (b) All labour cost, direct and indirect, related to the manufacturing process • (c) Number of total labours of the company • (d) Total wages paid by the company • (e) Method of wages payment used by the company
Important — This is field work
This project requires real data collected from an actual company in your own locality. No specimen figures have been invented here, because inventing them would defeat the purpose of the project and would be treated as false reporting. What follows is the method, the report structure and blank templates that you fill with the figures you collect.
Step-by-Step Method
- Select a company — choose a small or medium manufacturing unit near you: a furniture workshop, a brick factory, a garment or tailoring unit, a noodles or biscuit factory, a dairy, a steel or hume-pipe plant.
- Take permission first — write a short application through your school stating the purpose, and fix an appointment with the manager or the accountant.
- Prepare your questionnaire beforehand — list the five required items (a) to (e) as questions so that nothing is missed during the visit.
- Interview the right person — the accountant or the personnel officer holds the wage sheet, attendance register and payroll, which are your sources for items (b), (c) and (d).
- Classify what you collect — separate every labour payment into direct labour and indirect labour as you record it, rather than afterwards.
- Verify the totals — make sure the number of workers agrees with the attendance register and the total wages agree with the payroll for the same period. State the period clearly (one month or one year).
- Write and submit the report — use the format below, attach a photograph or the visit permission letter as evidence, and end with your own conclusion.
ⓘ How to classify the labour cost for item (b)
Direct labour cost — wages of workers who work directly on the product and whose time can be traced to it:
- Machine operators, weavers, tailors, carpenters, masons.
- Assembly-line and moulding workers.
- Any worker whose wage can be charged straight to a job or product.
Indirect labour cost — wages of workers who support production but do not work on the product itself. This forms part of overheads:
- Factory — supervisor, foreman, storekeeper, maintenance and repair staff, cleaner, security guard.
- Office and administration — accountant, clerk, office assistant, peon.
- Selling and distribution — salesman's salary, driver, delivery and loading staff.
Report Format — Part A: Particulars of the Company
| Particulars | Details |
|---|---|
| Name of the company | |
| Full address (ward, municipality, district) | |
| Nature of the product manufactured | |
| Year of establishment | |
| Name and designation of the person interviewed | |
| Date of the visit | |
| Period to which the wage data relates |
Report Format — Part B: Number of Workers and Total Wages
| Category of Worker | No. of Workers | Rate of Wages | Total Wages (Rs.) |
|---|---|---|---|
| A. Direct Labour | |||
| Machine operators / production workers | |||
| Assembly / finishing workers | |||
| Other direct workers | |||
| Total direct labour cost | — | ||
| B. Indirect Labour | |||
| Supervisor / foreman | |||
| Storekeeper / maintenance staff | |||
| Office staff (accountant, clerk, peon) | |||
| Security guard / cleaner / driver | |||
| Total indirect labour cost | — | ||
| (c) & (d) Total number of labours and total wages paid | — | ||
Report Format — Part C: Method of Wages Payment
| Point of Enquiry | Findings |
|---|---|
| System used (time rate / piece rate / both) | |
| If time rate — rate per hour, per day or per month | |
| If piece rate — rate per unit or per job | |
| Interval of payment (daily / weekly / monthly) | |
| Mode of payment (cash / bank / digital wallet) | |
| Overtime rate allowed | |
| Bonus, allowances and other facilities given | |
| Records maintained (attendance register, wage sheet, job card) | |
| Reason given by the company for choosing that system |
Useful Formulas for the Analysis Section
Total Labour Cost = Direct Labour Cost + Indirect Labour Cost Average Wage per Worker = Total Wages Paid ÷ Total Number of Workers Labour Cost per Unit = Total Labour Cost ÷ Total Units Produced Direct Labour Percentage = (Direct Labour Cost ÷ Total Labour Cost) × 100What to Write in the Conclusion
- Whether the company's labour cost is mainly direct or indirect, and what that indicates about how labour-intensive the work is.
- Whether the wage system chosen suits the nature of the work — the piece rate for repetitive measurable output, the time rate for skilled or supervisory work.
- Whether the company faces idle time or overtime, and what causes it.
- Whether the records maintained are adequate for controlling labour cost.
- Your own two or three suggestions for improving labour cost control in that company.
Frequently asked questions
What is Accounting for Labour about?
This chapter covers **Accounting for Labour**, explaining how businesses calculate, record, and control wages under different payment systems. It details the **time rate system** (payment based on hours worked) and **piece rate system** (payment based on output produced), along with concepts like **idle time, overtime, and labour cost control**. Practical problems illustrate wage calculations, differences between systems, and their advantages/disadvantages.
Which topics are covered in Accounting for Labour?
Class 12 Accounting “Accounting for Labour” covers: Definition and classification of labour cost (direct vs. indirect); Time rate system: calculation, advantages, and disadvantages; Piece rate system: calculation, merits, and demerits; Idle time: types (normal vs. abnormal) and accounting treatment; Overtime wages: calculation and rules for payment; Labour cost control techniques (recruitment, training, timekeeping, etc.); Differences between time rate and piece rate systems; Practical applications: wage computations under both systems.
What should I focus on in Accounting for Labour for the exam?
Focus on **solving numerical problems** (wage calculations under time/piece rate systems, overtime, and idle time) and **comparing the two wage systems** with their pros/cons, as these are frequently tested in both theory and practical questions.
What are the key formulas or definitions in Accounting for Labour?
Time rate wages = Total Hours Worked × Wage Rate per Hour; Piece rate wages = Number of Units Produced × Rate per Unit; Rate per Unit = (Wage Rate per Hour × Standard Time per Unit) OR (Wage Rate per Hour ÷ Standard Output per Hour); Idle Time = Time Paid For − Time Actually Worked on Production; Overtime Wages = Overtime Hours × Overtime Rate per Hour.
Where can I read the Class 12 Accounting “Accounting for Labour” solutions?
Right on this page. They are free and you do not need to sign up. For chapter quizzes and the AI tutor, install the Sikshya Plus app.
Study tips
Do not just read it. Practice it.
You have read the solutions for Accounting for Labour. Now test yourself, ask the AI tutor and keep your streak going.




- AI quizzes for this chapterTest yourself with instant feedback and explanations after every answer.
- AI tutor, free, 24/7Stuck on a question? Ask in your own words and get a step-by-step explanation.
- 14 AI tools in one appSummarizer, grammar checker, flashcards, essay help, math solver and more.
- Past questions and notesPast papers and your own notes organized chapter by chapter.