Sikshya Plus Get appGet the app free
Class 12 · Accounting

Accounting for Labour – Class 12 Accounting Notes and Solutions

Complete solutions and answers for “Accounting for Labour”, a chapter in Class 12 Accounting (NEB exam preparation). This page covers Theoretical Questions, Practical Problems — Time Rate System, Practical Problems — Piece Rate System and Assignments — Time Rate System.

  • Free, no login needed
  • 48 min read
  • Updated 4 August 2026

Chapter at a glance

This chapter covers **Accounting for Labour**, explaining how businesses calculate, record, and control wages under different payment systems. It details the **time rate system** (payment based on hours worked) and **piece rate system** (payment based on output produced), along with concepts like **idle time, overtime, and labour cost control**. Practical problems illustrate wage calculations, differences between systems, and their advantages/disadvantages.

  • Definition and classification of labour cost (direct vs. indirect)
  • Time rate system: calculation, advantages, and disadvantages
  • Piece rate system: calculation, merits, and demerits
  • Idle time: types (normal vs. abnormal) and accounting treatment
  • Overtime wages: calculation and rules for payment
  • Labour cost control techniques (recruitment, training, timekeeping, etc.)
  • Differences between time rate and piece rate systems
  • Practical applications: wage computations under both systems

Exam focus: Focus on **solving numerical problems** (wage calculations under time/piece rate systems, overtime, and idle time) and **comparing the two wage systems** with their pros/cons, as these are frequently tested in both theory and practical questions.

Key formulas and definitions

  • Time rate wages = Total Hours Worked × Wage Rate per Hour
  • Piece rate wages = Number of Units Produced × Rate per Unit
  • Rate per Unit = (Wage Rate per Hour × Standard Time per Unit) OR (Wage Rate per Hour ÷ Standard Output per Hour)
  • Idle Time = Time Paid For − Time Actually Worked on Production
  • Overtime Wages = Overtime Hours × Overtime Rate per Hour
On this page (5 sections)
  1. Theoretical Questions
  2. Practical Problems — Time Rate System
  3. Practical Problems — Piece Rate System
  4. Assignments — Time Rate System
  5. Assignments — Piece Rate System & Project Work

Solutions and answers

Every theoretical question, practical problem and assignment from the source pages, solved in full with working notes, formulas and step-by-step computation. Covers the time rate system, the piece rate system and overtime. Values in Nepalese Rupees (Rs.).

7 Very Short Answers 7 Short Answers 18 Practical Problems 18 Assignments 1 Project Work

Theoretical Questions

Very Short Answer 1–7  •  Short Answer 1–7
VSA
Very Short Answer Questions 1–7
One or two sentence answers
Question 1.1 — Define the labour cost.
  • Labour cost is the total payment made to the workers for the physical and mental effort they put into converting raw material into finished goods.
  • It includes wages, salaries, bonus, allowances, overtime payment and other benefits given to employees.
  • It is divided into direct labour cost (traceable to a product) and indirect labour cost (not traceable, forming part of overheads).
Question 1.2 — Write any two examples of direct labour cost.
  • Wages paid to a machine operator who actually works on the product.
  • Wages paid to a carpenter making furniture, or to a tailor stitching a garment.

Other acceptable examples: wages of a weaver in a textile mill, wages of a mason on a construction job.

Question 1.3 — What is idle time?
  • Idle time is the time for which a worker is paid but no production takes place.
  • It is the difference between the time paid for and the time actually worked on production.
  • It may be normal (unavoidable, e.g. tea break, machine set-up) or abnormal (avoidable, e.g. strike, power failure).
Idle Time = Time Paid For − Time Actually Worked
Question 1.4 — Explain piece rate system of wages payment.
  • Under the piece rate system, wages are paid according to the quantity of output produced, not the time spent.
  • A fixed rate is settled per unit, per piece or per job, and the worker is paid that rate for every unit completed.
  • It rewards efficiency — a faster worker earns more — so it is also called payment by results.
Total Wages = Number of Units Produced × Rate per Unit
Question 1.5 — Explain time rate system of wages payment.
  • Under the time rate system, wages are paid according to the time the worker attends and works, irrespective of output produced.
  • The rate may be fixed per hour, per day, per week or per month.
  • It is also called the time wage system or payment by time, and it guarantees the worker a minimum earning.
Total Wages = Time Worked × Rate per Unit of Time
Question 1.6 — Write any two differences between time and piece rate system.
  • Basis of payment — under the time rate system wages depend on the time spent; under the piece rate system wages depend on the units produced.
  • Effect of efficiency — under the time rate system an efficient and an inefficient worker earn the same amount; under the piece rate system the efficient worker earns more.

A third difference: quality of work is better protected under the time rate system, while quantity of output is higher under the piece rate system.

Question 1.7 — What do you mean by labour cost control?
  • Labour cost control means keeping the labour cost per unit of output at the minimum without reducing the quality of work or the morale of workers.
  • It is achieved through proper recruitment, training, time keeping, time booking, a sound wage system, and control of idle time and overtime.
  • Its aim is not to reduce wage rates, but to raise efficiency so that more output is obtained from the same wage bill.
SA
Short Answer Questions 1–7
Structured explanatory answers
Question 2.1 — What do you understand by labour cost control?
  • Labour cost control is the systematic effort of management to keep the labour cost per unit of output as low as possible, while maintaining the quality of output and the satisfaction of workers.
  • It does not mean cutting wages — it means raising productivity so that the same wage bill yields more output.

The main techniques of labour cost control are:

  • Proper recruitment and placement — the right worker in the right job.
  • Training — a trained worker wastes less material and less time.
  • Time keeping — recording arrival and departure to control attendance.
  • Time booking — recording how much time was spent on which job, to reveal idle time.
  • A suitable wage payment system — one that rewards efficiency.
  • Control of idle time and overtime — investigating and eliminating avoidable causes.
  • Control of labour turnover — reducing the cost of repeated recruitment and training.
Question 2.2 — Explain time rate system with its advantages and disadvantages.

Meaning: Under the time rate system, a worker is paid on the basis of the time spent at work — per hour, per day, per week or per month — regardless of the quantity of output produced.

Total Wages = Time Worked × Rate per Unit of Time

Advantages:

  • Simple to understand and easy to calculate, so disputes are rare.
  • Assured minimum wage, which gives the worker security and satisfaction.
  • Better quality of work, because the worker is not tempted to rush.
  • Less wastage of material and less damage to tools and machinery.
  • Accepted by trade unions, since all workers of a grade are treated equally.
  • Suitable where output cannot be measured in units, or where the work is artistic, skilled or supervisory.

Disadvantages:

  • No reward for efficiency — an efficient and an idle worker draw the same wage, which discourages the efficient one.
  • Lower production, because there is no incentive to produce more.
  • Close supervision needed, which increases the supervision cost.
  • Idle time cannot be avoided, as the worker is paid for attendance rather than output.
  • Labour cost per unit is uncertain, which makes cost estimation and quotation difficult.
Question 2.3 — Explain piece rate system with its merits and demerits.

Meaning: Under the piece rate system, a worker is paid on the basis of the quantity of output produced. A rate is fixed per unit or per job, and the worker earns that rate for every unit completed, irrespective of the time taken.

Total Wages = Units Produced × Rate per Unit Rate per Unit = Wage Rate per Hour × Standard Time per Unit (in hours)

Merits:

  • Rewards efficiency — the harder-working worker earns more, so effort is directly recognised.
  • Increases production, because every extra unit brings extra earning.
  • Labour cost per unit is fixed and known, which makes cost estimation, quotation and price fixing easy.
  • Less supervision required, since the worker supervises themselves for their own gain.
  • Idle time is not paid for, so idle time is automatically discouraged.
  • Fixed overhead per unit falls, because output rises while fixed cost stays the same.

Demerits:

  • Quality suffers, because the worker hurries to produce more units.
  • No guaranteed minimum wage, so earnings become uncertain during illness, machine breakdown or shortage of material.
  • Wastage of material and rough handling of machinery increase.
  • Health of workers may suffer from overstrain in the effort to earn more.
  • Opposed by trade unions, as it creates inequality of earnings among workers of the same grade.
  • Not suitable where output cannot be measured in units, or where the work is artistic or supervisory.
Question 2.4 — What is idle time? Explain briefly the types of idle time.

Meaning: Idle time is the period for which a worker is paid but no productive work is obtained. It is the gap between the time paid for and the time actually spent on production.

Idle Time = Time Paid For − Time Actually Worked on Production

Types of idle time:

  • Normal idle time — idle time that is unavoidable in the normal course of work. It cannot be eliminated, only minimised.
    • Time taken in moving from the gate to the workplace.
    • Tea break, rest and personal needs.
    • Time for setting up the machine and receiving instructions.
    • Waiting for the next job in the normal flow of work.
    Treatment: the cost of normal idle time is treated as a part of the cost of production — either added to the wage rate or charged to factory overhead.
  • Abnormal idle time — idle time that is avoidable and arises from causes that should not normally occur.
    • Machine breakdown, power failure.
    • Strike, lock-out, go-slow.
    • Shortage of raw material due to poor planning.
    • Fire, flood, accident or other abnormal event.
    Treatment: the cost of abnormal idle time is excluded from the cost of production and charged to the Profit and Loss Account as an abnormal loss.
Question 2.5 — Explain briefly the reasons for normal idle time and abnormal idle time.

Reasons for normal idle time:

  • Movement within the factory — time taken to travel from the factory gate to the department and between departments.
  • Rest and personal needs — tea break, lunch break and unavoidable personal time allowed to every worker.
  • Machine set-up and tool changing — time spent preparing the machine before actual work begins.
  • Receiving instructions — time spent obtaining the job card, drawing or instructions from the supervisor.
  • Normal waiting — short unavoidable waiting between the completion of one job and the issue of the next.
  • Fatigue — the natural fall in the speed of work, allowed for in the standard time.

Reasons for abnormal idle time:

  • Machine breakdown caused by poor maintenance.
  • Power failure or failure of the water and steam supply.
  • Shortage of raw material arising from defective purchasing or store keeping.
  • Strike, lock-out or go-slow by the workers.
  • Defective planning and scheduling of production, leaving workers without work.
  • Accident, fire or flood and other natural calamities.
  • Fall in demand leading to a deliberate cut in production while wages are still paid.
Question 2.6 — What are the differences between time rate system and piece rate system?
  • Basis of payment — the time rate system pays for the time attended and worked; the piece rate system pays for the units actually produced.
  • Formula — time rate: Time worked × Rate per hour; piece rate: Units produced × Rate per unit.
  • Incentive to work — the time rate system offers no incentive to produce more; the piece rate system offers a direct incentive.
  • Earnings of an efficient worker — under the time rate system they are the same as an inefficient worker's; under the piece rate system they are higher.
  • Security of wages — the time rate system guarantees a minimum wage; the piece rate system gives no guarantee.
  • Quality of output — better under the time rate system; likely to deteriorate under the piece rate system.
  • Labour cost per unit — uncertain under the time rate system; fixed and known under the piece rate system.
  • Supervision required — close and costly under the time rate system; less under the piece rate system.
  • Payment for idle time — idle time is paid for under the time rate system; it is not paid for under the piece rate system.
  • Suitability — the time rate system suits skilled, artistic and supervisory work and work whose output cannot be measured; the piece rate system suits repetitive, standardised work with measurable output.
Question 2.7 — Write any three disadvantages of piece wage system.
  • Quality of output falls — because earning depends only on quantity, workers hurry and produce defective units, increasing rejection and inspection cost.
  • No guaranteed minimum wage — if a machine breaks down, material runs short or the worker falls ill, earnings drop sharply, which creates insecurity and dissatisfaction.
  • Wastage of material and damage to machinery — in the rush to produce more, workers handle material and equipment carelessly, raising the material and maintenance cost.

Other acceptable points: overstrain damaging the health of workers, and opposition from trade unions because earnings become unequal among workers of the same grade.

Practical Problems — Time Rate System

Question 1 to Question 10
Key Formulas — Time Rate System
Total Wages = Total Hours Worked × Wage Rate per Hour Total Hours Worked = Working Hours per Day × Number of Working Days Wage Rate per Hour = Total Wages Earned ÷ Total Hours Worked Hours Worked = Output (units) × Standard Time per Unit (in hours) Overtime Hours = Total Hours Worked − Normal Hours Allowed Overtime Wages = Overtime Hours × Overtime Rate per Hour

Golden rule: under the time rate system the wage always follows the clock, never the output. Where output is given, first convert it into hours using the standard time, then apply the hourly rate.

Problem 1
Wage rate per hour of a manufacturing company
Required: Wage rate per hour

Given: Total wages paid Rs. 650  •  Number of working days in a week 5 days  •  Daily working hours 8 hours

Working Notes

WN 1 — Total hours worked during the week

Total Hours = Daily Working Hours × Number of Working Days = 8 hours × 5 days = 40 hours

WN 2 — Wage rate per hour

Wage Rate per Hour = Total Wages Paid ÷ Total Hours Worked = Rs. 650 ÷ 40 hours = Rs. 16.25 per hour

Statement of Wage Rate per Hour

Computation of hourly wage rate
ParticularsAmount / Hours
Total wages paid for the weekRs. 650
Daily working hours8 hrs
Number of working days in the week5 days
Total hours worked (8 × 5)40 hrs
Wage rate per hour (650 ÷ 40)Rs. 16.25
Answer
  • Wage rate per hour = Rs. 16.25
Problem 2
Total wages for the month using the time rate system
Required: Total wages for the month by using time rate system

Given: Working hours per day = 8 hours  •  Hourly wage rate = Rs. 30 per hour  •  Working days per month = 25 days

Working Notes

WN 1 — Total hours worked in the month

Total Hours = 8 hours per day × 25 days = 200 hours

WN 2 — Total wages

Total Wages = Total Hours × Rate per Hour = 200 hours × Rs. 30 = Rs. 6,000

Statement of Total Wages for the Month

Wages computed under the time rate system
ParticularsAmount / Hours
Working hours per day8 hrs
Working days per month25 days
Total hours worked in the month (8 × 25)200 hrs
Hourly wage rateRs. 30
Total wages for the month (200 × 30)Rs. 6,000
Answer
  • Total wages for the month = Rs. 6,000
Problem 3
Wages earned by Mr. Shamir K.C. during the week
Required: Wages earned by the worker during the week

Given: Output produced in the week = 60 units  •  Time taken for one unit = 3 hours  •  Wage rate = Rs. 200 per hour

ⓘ Important Rule

Output is given, but the question asks for wages under the time rate system. So the output must first be converted into hours using the time per unit — the units themselves are never multiplied by the hourly rate.

Working Notes

WN 1 — Total time worked

Total Hours = Output × Time per Unit = 60 units × 3 hours = 180 hours

WN 2 — Wages earned

Wages = Total Hours × Rate per Hour = 180 hours × Rs. 200 = Rs. 36,000

Statement of Wages Earned

Wages of Mr. Shamir K.C. for the week
ParticularsAmount / Hours
Units produced during the week60 units
Time required for one unit3 hrs
Total hours worked (60 × 3)180 hrs
Wage rate per hourRs. 200
Total wages earned (180 × 200)Rs. 36,000
Answer
  • Wages earned during the week = Rs. 36,000
Problem 4
Daily working hours from total wages earned
Required: Daily working hours

Given: Wage rate per hour = Rs. 28.5  •  Number of working days = 6 days  •  Total wages earned = Rs. 855

Working Notes

WN 1 — Total hours worked (work the basic formula backwards)

Total Wages = Total Hours × Rate per Hour ∴ Total Hours = Total Wages ÷ Rate per Hour = Rs. 855 ÷ Rs. 28.5 = 30 hours

WN 2 — Daily working hours

Daily Working Hours = Total Hours ÷ Number of Working Days = 30 hours ÷ 6 days = 5 hours per day

Statement of Daily Working Hours

Computation of daily working hours
ParticularsAmount / Hours
Total wages earnedRs. 855
Wage rate per hourRs. 28.50
Total hours worked (855 ÷ 28.50)30 hrs
Number of working days6 days
Daily working hours (30 ÷ 6)5 hrs
Answer
  • Daily working hours = 5 hours
Problem 5
Wages payable to Dipesh and Amrit under the time wage system
Required: Total wages payable to Dipesh and Amrit by using time wage system

Given: Wage rate per hour Rs. 10  •  Time required per unit 45 minutes  •  Output of Dipesh 30 units  •  Output of Amrit 40 units

Working Notes

WN 1 — Convert the standard time into hours

Time per Unit = 45 minutes ÷ 60 = 0.75 hour

WN 2 — Hours worked by each worker

Dipesh : 30 units × 0.75 hr = 22.5 hours Amrit : 40 units × 0.75 hr = 30.0 hours

WN 3 — Wages of each worker at Rs. 10 per hour

Dipesh : 22.5 hours × Rs. 10 = Rs. 225 Amrit : 30.0 hours × Rs. 10 = Rs. 300

Statement of Wages Payable

Wages under the time wage system
ParticularsDipeshAmrit
Output (units)3040
Time allowed per unit (hours)0.750.75
Total hours worked22.5030.00
Wage rate per hour (Rs.)1010
Total wages payable (Rs.)225300
Answer
  • Dipesh = Rs. 225
  • Amrit = Rs. 300
Problem 6
Total time worked and earning of a worker
Required: (a) Total time worked by the worker  (b) Earning of worker during the week

Given: Standard time 30 seconds per unit  •  Wage rate Rs. 200 per hour  •  Output 600 units

Working Notes

WN 1 — Total time worked (a)

Total Time = Output × Standard Time per Unit = 600 units × 30 seconds = 18,000 seconds 18,000 seconds ÷ 60 = 300 minutes 300 minutes ÷ 60 = 5 hours

WN 2 — Earning during the week (b)

Earning = Total Hours × Rate per Hour = 5 hours × Rs. 200 = Rs. 1,000

Statement of Time Worked and Earning

Computation of time and wages
ParticularsAmount / Time
Output (units)600
Standard time per unit30 sec
Total time in seconds (600 × 30)18,000 sec
(a) Total time worked (18,000 ÷ 3,600)5 hrs
Wage rate per hourRs. 200
(b) Earning during the week (5 × 200)Rs. 1,000
Answer
  • (a) Total time worked = 5 hours
  • (b) Earning of the worker = Rs. 1,000
Problem 7
Total wages of workers X, Y and Z for the week
Required: Total wages to the workers during the week

Given: Wage rate Rs. 500 per day of 8 working hours per day  •  Hours worked during the week — X 40 hours, Y 42 hours, Z 45 hours

Working Notes

WN 1 — Convert the daily rate into an hourly rate

Rate per Hour = Rate per Day ÷ Working Hours per Day = Rs. 500 ÷ 8 hours = Rs. 62.50 per hour

WN 2 — Wages of each worker

X : 40 hours × Rs. 62.50 = Rs. 2,500.00 Y : 42 hours × Rs. 62.50 = Rs. 2,625.00 Z : 45 hours × Rs. 62.50 = Rs. 2,812.50

Statement of Total Wages

Wages of X, Y and Z for the week
ParticularsXYZ
Hours worked during the week404245
Wage rate per hour (Rs. 500 ÷ 8)62.5062.5062.50
Total wages (Rs.)2,500.002,625.002,812.50
Answer
  • X = Rs. 2,500
  • Y = Rs. 2,625
  • Z = Rs. 2,812.50
  • Total wages of all three workers = Rs. 7,937.50
Problem 8
Overtime hours and total monthly wages
Required: (a) Overtime hour  (b) Total wages in a month

Given: Normal wage rate per hour Rs. 15  •  Overtime wage rate two times of normal rate  •  Daily working hours 8 hrs  •  Total working days in a month 25 days  •  Total worked hours 250 hours

Key Rules for Overtime
  • Normal hours are the hours the worker is expected to work — daily hours × working days.
  • Overtime hours are the excess of the hours actually worked over those normal hours.
  • The normal hours are paid at the normal rate and only the overtime hours get the higher rate. The overtime hours must never be paid twice.
Working Notes

WN 1 — Normal hours for the month

Normal Hours = Daily Working Hours × Working Days = 8 hours × 25 days = 200 hours

WN 2 — Overtime hours (a)

Overtime Hours = Total Hours Worked − Normal Hours = 250 hours − 200 hours = 50 hours

WN 3 — Overtime rate per hour

Overtime Rate = 2 × Normal Rate = 2 × Rs. 15 = Rs. 30 per hour

WN 4 — Total wages for the month (b)

Normal wages = 200 hours × Rs. 15 = Rs. 3,000 Overtime wages = 50 hours × Rs. 30 = Rs. 1,500 ---------- Total wages Rs. 4,500

Statement of Total Wages for the Month

Normal wages and overtime wages
ParticularsHoursRate (Rs.)Amount (Rs.)
Normal time wages (8 hrs × 25 days)200153,000
Overtime wages (250 − 200)50301,500
Total wages in a month250—4,500
Answer
  • (a) Overtime hours = 50 hours
  • (b) Total wages in a month = Rs. 4,500
Problem 9
Earnings of a worker from day-wise hours worked
Required: Earnings of the worker for the week

Given: Normal working hours 7 hrs per day  •  Normal rate Rs. 10 per hour  •  Overtime rate 150% of normal rate. Hours worked — Sunday 10, Monday 7, Tuesday 9, Wednesday 12, Thursday 8, Friday 6.

Key Rule — Overtime must be found DAY BY DAY

Here the normal limit is 7 hours per day, so overtime has to be worked out separately for each day. It is wrong to add up all 52 hours and compare them with a weekly total, because a short day (Friday, 6 hours) does not cancel out the overtime of a long day (Wednesday, 12 hours).

Overtime Rate = 150% of Rs. 10 = Rs. 15 per hour
Working Notes

WN 1 — Day-wise split of normal hours and overtime hours

Day Worked Normal (max 7) Overtime Sunday 10 7 3 Monday 7 7 0 Tuesday 9 7 2 Wednesday 12 7 5 Thursday 8 7 1 Friday 6 6 0 ------ ------ ------ Total 52 41 11

WN 2 — Earnings

Normal wages = 41 hours × Rs. 10 = Rs. 410 Overtime wages = 11 hours × Rs. 15 = Rs. 165 --------- Total earnings Rs. 575

Statement of Day-wise Hours

Analysis of hours worked into normal time and overtime
DaysHours WorkedNormal HoursOvertime Hours
Sunday1073
Monday77—
Tuesday972
Wednesday1275
Thursday871
Friday66—
Total524111

Statement of Earnings

Earnings of the worker for the week
ParticularsHoursRate (Rs.)Amount (Rs.)
Normal time wages4110410
Overtime wages (150% of Rs. 10)1115165
Total earnings of the worker52—575
Answer
  • Total earnings of the worker = Rs. 575
Problem 10
Weekly wages with a separate overtime rate
Required: Total wages earned by the worker per week using time rate system

Given: Standard working hours per week 42 hours  •  Hours actually worked 55 hours  •  Rs. 10 per hour for normal time  •  Rs. 15 per hour for overtime

Working Notes

WN 1 — Overtime hours

Overtime Hours = Hours Worked − Standard Hours = 55 hours − 42 hours = 13 hours

WN 2 — Total wages

Normal wages = 42 hours × Rs. 10 = Rs. 420 Overtime wages = 13 hours × Rs. 15 = Rs. 195 --------- Total wages Rs. 615

Statement of Weekly Wages

Wages earned per week under the time rate system
ParticularsHoursRate (Rs.)Amount (Rs.)
Normal time wages (standard hours)4210420
Overtime wages (55 − 42)1315195
Total wages earned per week55—615
Answer
  • Total wages earned per week = Rs. 615

Practical Problems — Piece Rate System

Question 11 to Question 18
Key Formulas — Piece Rate System
Total Wages = Units Produced × Rate per Unit Rate per Unit = Wage Rate per Hour × Standard Time per Unit (in hours) or = Wage Rate per Hour ÷ Standard Output per Hour Standard Output per Hour = 60 ÷ Standard Minutes per Unit = 3,600 ÷ Standard Seconds per Unit Total Output = Total Hours Worked × Output per Hour

Golden rule: under the piece rate system the wage always follows the output, never the clock. When only an hourly rate is given, the first step is always to derive the rate per unit.

Problem 11
Total wages of Mr. Shyam for the week
Required: Total wages during the week

Given: Output of product B during the week = 1,000 units  •  Wages to be paid Rs. 8 per unit

Working Notes

WN 1 — Total wages

Total Wages = Units Produced × Rate per Unit = 1,000 units × Rs. 8 = Rs. 8,000

Statement of Total Wages

Wages of Mr. Shyam under the piece rate system
ParticularsAmount / Units
Units of product B produced in the week1,000
Wage rate per unitRs. 8
Total wages for the week (1,000 × 8)Rs. 8,000
Answer
  • Total wages during the week = Rs. 8,000
Problem 12
Wage rate per unit and earnings of Bikash and Sandesh
Required: (a) Wages rate per unit  (b) Earning of Sandesh and Bikash by using piece rate system

Given: Wage rate per hour Rs. 12  •  Standard time 30 minutes per unit  •  Production — Bikash 40 units, Sandesh 20 units

Working Notes

WN 1 — Standard time in hours

Standard Time per Unit = 30 minutes ÷ 60 = 0.5 hour

WN 2 — Wage rate per unit (a)

Rate per Unit = Rate per Hour × Standard Time per Unit = Rs. 12 × 0.5 hour = Rs. 6 per unit

WN 3 — Earnings of each worker (b)

Bikash : 40 units × Rs. 6 = Rs. 240 Sandesh : 20 units × Rs. 6 = Rs. 120

Statement of Earnings

Earnings under the piece rate system
ParticularsBikashSandesh
Units produced4020
Wage rate per unit (Rs.)66
Earnings (Rs.)240120
Answer
  • (a) Wage rate per unit = Rs. 6
  • (b) Bikash = Rs. 240  •  Sandesh = Rs. 120
Problem 13
Annual wages payable using the piece rate system
Required: Wages payable to a worker by using piece rate system

Given: Weekly working hours 30 hours  •  Weeks worked during the year 50 weeks  •  Hourly output 10 units  •  Wage rate per unit Rs. 20

Working Notes

WN 1 — Total hours worked during the year

Total Hours = Weekly Hours × Number of Weeks = 30 hours × 50 weeks = 1,500 hours

WN 2 — Total output for the year

Total Output = Total Hours × Output per Hour = 1,500 hours × 10 units = 15,000 units

WN 3 — Wages payable

Total Wages = Total Output × Rate per Unit = 15,000 units × Rs. 20 = Rs. 3,00,000

Statement of Wages Payable for the Year

Annual wages under the piece rate system
ParticularsAmount / Units
Weekly working hours30 hrs
Number of weeks worked50
Total hours worked (30 × 50)1,500 hrs
Output per hour10 units
Total output (1,500 × 10)15,000 units
Wage rate per unitRs. 20
Wages payable for the year (15,000 × 20)Rs. 3,00,000
Answer
  • Wages payable to the worker = Rs. 3,00,000
Problem 14
Wage amount of the worker
Required: Wage amount of the worker

Given: Output produced by a worker 600 units  •  Time allowed for 5 units of output 1 hour  •  Wage rate per hour Rs. 120

Working Notes

WN 1 — Standard output per hour

1 hour is allowed for 5 units ∴ Standard Output per Hour = 5 units

WN 2 — Wage rate per unit

Rate per Unit = Rate per Hour ÷ Output per Hour = Rs. 120 ÷ 5 units = Rs. 24 per unit

WN 3 — Wage amount

Total Wages = 600 units × Rs. 24 = Rs. 14,400

Statement of Wage Amount

Wages of the worker under the piece rate system
ParticularsAmount / Units
Output produced600 units
Standard output per hour5 units
Wage rate per hourRs. 120
Wage rate per unit (120 ÷ 5)Rs. 24
Wage amount of the worker (600 × 24)Rs. 14,400
Answer
  • Wage amount of the worker = Rs. 14,400
Problem 15
Standard output, piece wage rate and wages of Mrs. Bijaya and Mr. Shamir
Required: (a) Standard output per hour  (b) Piece wage rate  (c) Wages earned by each worker

Given: Standard time allowed 30 seconds per unit  •  Normal wage rate in the factory Rs. 15 per hour  •  Output of Mrs. Bijaya 10,000 units  •  Output of Mr. Shamir 12,000 units

Working Notes

WN 1 — Standard output per hour (a)

1 hour = 60 × 60 = 3,600 seconds Standard Output per Hour = 3,600 seconds ÷ 30 seconds per unit = 120 units per hour

WN 2 — Piece wage rate (b)

Piece Rate = Rate per Hour ÷ Standard Output per Hour = Rs. 15 ÷ 120 units = Re. 0.125 per unit

WN 3 — Wages earned by each worker (c)

Mrs. Bijaya : 10,000 units × Re. 0.125 = Rs. 1,250 Mr. Shamir : 12,000 units × Re. 0.125 = Rs. 1,500

Statement of Wages Earned

Wages under the piece rate system
ParticularsMrs. BijayaMr. Shamir
Output (units)10,00012,000
Piece wage rate (Rs.)0.1250.125
Wages earned (Rs.)1,2501,500
Answer
  • (a) Standard output per hour = 120 units
  • (b) Piece wage rate = Re. 0.125 per unit
  • (c) Mrs. Bijaya = Rs. 1,250  •  Mr. Shamir = Rs. 1,500
Problem 16
Total wages for A and B under both time rate and piece rate systems
Required: Total wages for A & B under time and piece rate system

Given: Wage rate Rs. 40 per hour  •  Standard production 2 units per hour  •  Output for the week — A 40 units, B 45 units

Working Notes

WN 1 — Hours worked by each worker (for the time rate system)

Hours Worked = Output ÷ Standard Production per Hour A : 40 units ÷ 2 units per hour = 20.0 hours B : 45 units ÷ 2 units per hour = 22.5 hours

WN 2 — Wages under the time rate system

A : 20.0 hours × Rs. 40 = Rs. 800 B : 22.5 hours × Rs. 40 = Rs. 900

WN 3 — Piece rate per unit

Piece Rate = Rate per Hour ÷ Standard Production per Hour = Rs. 40 ÷ 2 units = Rs. 20 per unit

WN 4 — Wages under the piece rate system

A : 40 units × Rs. 20 = Rs. 800 B : 45 units × Rs. 20 = Rs. 900

Comparative Statement of Wages

Wages under the time rate and the piece rate system
ParticularsAB
Output for the week (units)4045
Standard production per hour (units)22
Hours worked (output ÷ 2)20.022.5
Wages under time rate system (hours × Rs. 40)800900
Piece rate per unit (Rs. 40 ÷ 2)Rs. 20Rs. 20
Wages under piece rate system (units × Rs. 20)800900
ⓘ Note — Why both systems give the same figure

Both workers are producing at exactly the standard rate of 2 units per hour. Whenever a worker's actual efficiency equals the standard, the time rate and the piece rate give an identical wage. A worker producing faster than the standard would earn more under the piece rate; a slower worker would earn less.

Answer
  • A = Rs. 800 under both the time rate and the piece rate system.
  • B = Rs. 900 under both the time rate and the piece rate system.
Problem 17
Total wages amount of the worker for the year
Required: Total wages amount of the worker for the year

Given: Monthly working days 25 days  •  Working hours per day 7 hours  •  Hourly output 5 units  •  Wage rate per unit Rs. 50

Working Notes

WN 1 — Total working days in the year

Total Days = 25 days per month × 12 months = 300 days

WN 2 — Total hours worked in the year

Total Hours = 300 days × 7 hours per day = 2,100 hours

WN 3 — Total output for the year

Total Output = 2,100 hours × 5 units per hour = 10,500 units

WN 4 — Total wages

Total Wages = 10,500 units × Rs. 50 = Rs. 5,25,000

Statement of Total Wages for the Year

Annual wages under the piece rate system
ParticularsAmount / Units
Monthly working days25 days
Yearly working days (25 × 12)300 days
Working hours per day7 hrs
Total hours in the year (300 × 7)2,100 hrs
Hourly output5 units
Total output (2,100 × 5)10,500 units
Wage rate per unitRs. 50
Total wages for the year (10,500 × 50)Rs. 5,25,000
Answer
  • Total wages amount for the year = Rs. 5,25,000
Problem 18
Total earning of the worker for the day
Required: Total earning of the worker

Given: Standard time allowed for one unit of output 15 minutes  •  Hourly wage rate Rs. 40 per hour  •  Output of the worker 28 units in a day

Working Notes

WN 1 — Standard time in hours

Standard Time per Unit = 15 minutes ÷ 60 = 0.25 hour

WN 2 — Wage rate per unit

Rate per Unit = Rate per Hour × Standard Time per Unit = Rs. 40 × 0.25 hour = Rs. 10 per unit (Check: standard output per hour = 60 ÷ 15 = 4 units; Rs. 40 ÷ 4 units = Rs. 10 per unit — same answer.)

WN 3 — Total earning

Total Earning = 28 units × Rs. 10 = Rs. 280

Statement of Total Earning

Earning of the worker under the piece rate system
ParticularsAmount / Units
Standard time allowed per unit15 min (0.25 hr)
Hourly wage rateRs. 40
Wage rate per unit (40 × 0.25)Rs. 10
Output in a day28 units
Total earning of the worker (28 × 10)Rs. 280
Answer
  • Total earning of the worker = Rs. 280

Assignments — Time Rate System

Question 1 to Question 9
Assign. 1
Wage rate per hour
Required: Wages rate per hour

Given: Daily working hours 7 hours  •  Number of working days in a month 16 days  •  Total wages earned Rs. 6,272

Working Notes

WN 1 — Total hours worked

Total Hours = 7 hours per day × 16 days = 112 hours

WN 2 — Wage rate per hour

Rate per Hour = Total Wages ÷ Total Hours = Rs. 6,272 ÷ 112 hours = Rs. 56 per hour

Statement of Wage Rate per Hour

Computation of hourly wage rate
ParticularsAmount / Hours
Total wages earnedRs. 6,272
Daily working hours7 hrs
Working days in the month16 days
Total hours worked (7 × 16)112 hrs
Wage rate per hour (6,272 ÷ 112)Rs. 56
Answer
  • Wage rate per hour = Rs. 56
Assign. 2
Total wages for the month using the time rate system
Required: Total wages for the month by using time rate systems

Given: Working hours per day = 6 hours  •  Hourly wage rate = Rs. 20 per hour  •  Working days per month = 27 days

Working Notes

WN 1 — Total hours worked in the month

Total Hours = 6 hours × 27 days = 162 hours

WN 2 — Total wages

Total Wages = 162 hours × Rs. 20 = Rs. 3,240

Statement of Total Wages for the Month

Wages under the time rate system
ParticularsAmount / Hours
Working hours per day6 hrs
Working days per month27 days
Total hours worked (6 × 27)162 hrs
Hourly wage rateRs. 20
Total wages for the month (162 × 20)Rs. 3,240
Answer
  • Total wages for the month = Rs. 3,240
Assign. 3
Wages earned by Mr. Sandesh during the week
Required: Wages earned by the worker during the week

Given: Output during the week = 70 units  •  Time taken for one unit = 4 hours  •  Wage rate = Rs. 250 per hour

Working Notes

WN 1 — Total time worked

Total Hours = 70 units × 4 hours = 280 hours

WN 2 — Wages earned

Wages = 280 hours × Rs. 250 = Rs. 70,000

Statement of Wages Earned

Wages of Mr. Sandesh for the week
ParticularsAmount / Hours
Units produced during the week70 units
Time required per unit4 hrs
Total hours worked (70 × 4)280 hrs
Wage rate per hourRs. 250
Wages earned during the week (280 × 250)Rs. 70,000
Answer
  • Wages earned during the week = Rs. 70,000
Assign. 4
Daily working hours
Required: Daily working hours

Given: Wage rate per hour Rs. 25  •  Number of working days 10 days  •  Total wages earned Rs. 1,750

Working Notes

WN 1 — Total hours worked

Total Hours = Total Wages ÷ Rate per Hour = Rs. 1,750 ÷ Rs. 25 = 70 hours

WN 2 — Daily working hours

Daily Hours = 70 hours ÷ 10 days = 7 hours per day

Statement of Daily Working Hours

Computation of daily working hours
ParticularsAmount / Hours
Total wages earnedRs. 1,750
Wage rate per hourRs. 25
Total hours worked (1,750 ÷ 25)70 hrs
Number of working days10 days
Daily working hours (70 ÷ 10)7 hrs
Answer
  • Daily working hours = 7 hours
Assign. 5
Wages payable to X and Y under the time wage system
Required: Total wages payable X and Y by using time wage system

Given: Wage rate per hour Rs. 2  •  Time required per unit 30 minutes  •  Output of X 70 units  •  Output of Y 80 units

Working Notes

WN 1 — Standard time in hours

Time per Unit = 30 minutes ÷ 60 = 0.5 hour

WN 2 — Hours worked by each worker

X : 70 units × 0.5 hr = 35 hours Y : 80 units × 0.5 hr = 40 hours

WN 3 — Wages at Rs. 2 per hour

X : 35 hours × Rs. 2 = Rs. 70 Y : 40 hours × Rs. 2 = Rs. 80

Statement of Wages Payable

Wages under the time wage system
ParticularsXY
Output (units)7080
Time allowed per unit (hours)0.50.5
Total hours worked3540
Wage rate per hour (Rs.)22
Total wages payable (Rs.)7080
Answer
  • X = Rs. 70
  • Y = Rs. 80
Assign. 6
Total time worked and earning of a worker
Required: (a) Total time worked by the worker  (b) Earning of worker during the week

Given: Standard time 20 minutes per unit  •  Wage rate Rs. 150 per hour  •  Output 150 units

Working Notes

WN 1 — Total time worked (a)

Total Time = 150 units × 20 minutes = 3,000 minutes 3,000 minutes ÷ 60 = 50 hours

WN 2 — Earning during the week (b)

Earning = 50 hours × Rs. 150 = Rs. 7,500

Statement of Time Worked and Earning

Computation of time and wages
ParticularsAmount / Time
Output (units)150
Standard time per unit20 min
Total time in minutes (150 × 20)3,000 min
(a) Total time worked (3,000 ÷ 60)50 hrs
Wage rate per hourRs. 150
(b) Earning during the week (50 × 150)Rs. 7,500
Answer
  • (a) Total time worked = 50 hours
  • (b) Earning of the worker = Rs. 7,500
Assign. 7
Total wages of workers P, Q and R for the week
Required: Total wages to the workers during the week

Given: Wage rate Rs. 400 per day of 8 working hours per day  •  Hours worked — P 30 hours, Q 35 hours, R 40 hours

Working Notes

WN 1 — Hourly wage rate

Rate per Hour = Rs. 400 ÷ 8 hours = Rs. 50 per hour

WN 2 — Wages of each worker

P : 30 hours × Rs. 50 = Rs. 1,500 Q : 35 hours × Rs. 50 = Rs. 1,750 R : 40 hours × Rs. 50 = Rs. 2,000

Statement of Total Wages

Wages of P, Q and R for the week
ParticularsPQR
Hours worked during the week303540
Wage rate per hour (Rs. 400 ÷ 8)505050
Total wages (Rs.)1,5001,7502,000
Answer
  • P = Rs. 1,500  •  Q = Rs. 1,750  •  R = Rs. 2,000
  • Total wages of all three workers = Rs. 5,250
Assign. 8
Overtime hours and total monthly wages
Required: (a) Overtime hour  (b) Total wages in a month

Given: Normal wage rate per hour Rs. 50  •  Overtime wage rate is 120% of normal rate  •  Daily working hours 7 hrs  •  Total working days in a month 25 days  •  Total working hours 200 hours

Working Notes

WN 1 — Normal hours for the month

Normal Hours = 7 hours × 25 days = 175 hours

WN 2 — Overtime hours (a)

Overtime Hours = 200 hours − 175 hours = 25 hours

WN 3 — Overtime rate per hour

Overtime Rate = 120% of Rs. 50 = Rs. 50 × 120/100 = Rs. 60 per hour

WN 4 — Total wages for the month (b)

Normal wages = 175 hours × Rs. 50 = Rs. 8,750 Overtime wages = 25 hours × Rs. 60 = Rs. 1,500 ----------- Total wages Rs. 10,250

Statement of Total Wages for the Month

Normal wages and overtime wages
ParticularsHoursRate (Rs.)Amount (Rs.)
Normal time wages (7 hrs × 25 days)175508,750
Overtime wages (200 − 175)25601,500
Total wages in a month200—10,250
Answer
  • (a) Overtime hours = 25 hours
  • (b) Total wages in a month = Rs. 10,250
Assign. 9
Earnings of a worker from day-wise hours worked
Required: Earnings of the worker for the week

Given: Normal working hours 8 hrs per day  •  Normal rate Rs. 12 per hour  •  Overtime rate 150% of normal rate. Hours worked — Sunday 11, Monday 8, Tuesday 9, Wednesday 12, Thursday 10, Friday 5.

Key Rule

The normal limit is 8 hours per day, so overtime must be extracted day by day. Friday's short day of 5 hours does not absorb the overtime of the longer days.

Overtime Rate = 150% of Rs. 12 = Rs. 18 per hour
Working Notes

WN 1 — Day-wise split of normal hours and overtime hours

Day Worked Normal (max 8) Overtime Sunday 11 8 3 Monday 8 8 0 Tuesday 9 8 1 Wednesday 12 8 4 Thursday 10 8 2 Friday 5 5 0 ------ ------ ------ Total 55 45 10

WN 2 — Earnings

Normal wages = 45 hours × Rs. 12 = Rs. 540 Overtime wages = 10 hours × Rs. 18 = Rs. 180 --------- Total earnings Rs. 720

Statement of Day-wise Hours

Analysis of hours worked into normal time and overtime
DaysHours WorkedNormal HoursOvertime Hours
Sunday1183
Monday88—
Tuesday981
Wednesday1284
Thursday1082
Friday55—
Total554510

Statement of Earnings

Earnings of the worker for the week
ParticularsHoursRate (Rs.)Amount (Rs.)
Normal time wages4512540
Overtime wages (150% of Rs. 12)1018180
Total earnings of the worker55—720
Answer
  • Total earnings of the worker = Rs. 720

Assignments — Piece Rate System & Project Work

Question 10 to Question 18  •  Project Work
Assign. 10
Total wages of Mr. Ram during the week
Required: Total wages during the week

Given: Output of product B during the week = 1,500 units  •  Wages to be paid Rs. 6 per unit

Working Notes
Total Wages = Units Produced × Rate per Unit = 1,500 units × Rs. 6 = Rs. 9,000

Statement of Total Wages

Wages of Mr. Ram under the piece rate system
ParticularsAmount / Units
Units of product B produced1,500
Wage rate per unitRs. 6
Total wages for the week (1,500 × 6)Rs. 9,000
Answer
  • Total wages during the week = Rs. 9,000
Assign. 11
Wage rate per unit and earnings of Basu and Ram
Required: (a) Wages rate per unit  (b) Earning of Basu and Ram by using piece rate system

Given: Wage rate per hour Rs. 15  •  Standard time 20 minutes per unit  •  Production — Basu 30 units, Ram 40 units

Working Notes

WN 1 — Standard time in hours

Standard Time per Unit = 20 minutes ÷ 60 = 1/3 hour

WN 2 — Wage rate per unit (a)

Rate per Unit = Rs. 15 × 1/3 hour = Rs. 5 per unit (Check: standard output per hour = 60 ÷ 20 = 3 units; Rs. 15 ÷ 3 units = Rs. 5 per unit.)

WN 3 — Earnings (b)

Basu : 30 units × Rs. 5 = Rs. 150 Ram : 40 units × Rs. 5 = Rs. 200

Statement of Earnings

Earnings under the piece rate system
ParticularsBasuRam
Units produced3040
Wage rate per unit (Rs.)55
Earnings (Rs.)150200
Answer
  • (a) Wage rate per unit = Rs. 5
  • (b) Basu = Rs. 150  •  Ram = Rs. 200
Assign. 12
Annual wages payable using the piece rate system
Required: Wages payable to a worker for a year by using piece rate system

Given: Weekly working hours 25 hours  •  Weeks worked during the year 42 weeks  •  Hourly output 6 units  •  Wage rate per unit Rs. 15

Working Notes

WN 1 — Total hours worked during the year

Total Hours = 25 hours × 42 weeks = 1,050 hours

WN 2 — Total output for the year

Total Output = 1,050 hours × 6 units = 6,300 units

WN 3 — Wages payable

Total Wages = 6,300 units × Rs. 15 = Rs. 94,500

Statement of Wages Payable for the Year

Annual wages under the piece rate system
ParticularsAmount / Units
Weekly working hours25 hrs
Number of weeks worked42
Total hours worked (25 × 42)1,050 hrs
Output per hour6 units
Total output (1,050 × 6)6,300 units
Wage rate per unitRs. 15
Wages payable for the year (6,300 × 15)Rs. 94,500
Answer
  • Wages payable for the year = Rs. 94,500
Assign. 13
Wage amount of the worker
Required: Wage amount of the worker

Given: Output produced by a worker 500 units  •  Time allowed for 2 units of output ½ hour  •  Wage rate per hour Rs. 120

Working Notes

WN 1 — Standard output per hour

2 units are allowed ½ hour ∴ In 1 hour, output = 2 units × 2 = 4 units per hour

WN 2 — Wage rate per unit

Rate per Unit = Rs. 120 ÷ 4 units = Rs. 30 per unit

WN 3 — Wage amount

Total Wages = 500 units × Rs. 30 = Rs. 15,000

Statement of Wage Amount

Wages of the worker under the piece rate system
ParticularsAmount / Units
Output produced500 units
Time allowed for 2 units½ hr
Standard output per hour (2 × 2)4 units
Wage rate per hourRs. 120
Wage rate per unit (120 ÷ 4)Rs. 30
Wage amount of the worker (500 × 30)Rs. 15,000
Answer
  • Wage amount of the worker = Rs. 15,000
Assign. 14
Standard output, piece wage rate and wages of Mr. Yamlal and Mr. Pomlal
Required: (a) Standard output per hour  (b) Piece wage rate  (c) Wages earned by each worker

Given: Standard time allowed 15 seconds per unit  •  Normal wage rate Rs. 25 per hour  •  Output of Mr. Yamlal 5,000 units  •  Output of Mr. Pomlal 7,000 units

Working Notes

WN 1 — Standard output per hour (a)

1 hour = 3,600 seconds Standard Output per Hour = 3,600 ÷ 15 seconds = 240 units per hour

WN 2 — Piece wage rate (b)

Piece Rate = Rs. 25 ÷ 240 units = Re. 0.104 per unit (rounded)

WN 3 — Wages earned (c)

Mr. Yamlal : 5,000 units × Re. 0.104 = Rs. 520 Mr. Pomlal : 7,000 units × Re. 0.104 = Rs. 728

Statement of Wages Earned

Wages under the piece rate system
ParticularsMr. YamlalMr. Pomlal
Output (units)5,0007,000
Piece wage rate (Rs.)0.1040.104
Wages earned (Rs.)520728
ⓘ Note on rounding

The exact piece rate is Rs. 25 ÷ 240 = Re. 0.10416..., which the textbook rounds to Re. 0.104. The wages have been computed with the rounded rate so that they agree with the printed answer (Rs. 520 and Rs. 728). Using the unrounded rate would give Rs. 520.83 and Rs. 729.17.

Answer
  • (a) Standard output per hour = 240 units
  • (b) Piece wage rate = Re. 0.104 per unit
  • (c) Mr. Yamlal = Rs. 520  •  Mr. Pomlal = Rs. 728
Assign. 15
Earning of a worker for the year
Required: Earning of a worker by using piece wage rate system

Given: Weekly working hours 48 hours  •  Number of weeks worked in a year 30 weeks  •  Wage rate per unit Rs. 10  •  Production per hour 20 units

Working Notes

WN 1 — Total hours worked during the year

Total Hours = 48 hours × 30 weeks = 1,440 hours

WN 2 — Total output for the year

Total Output = 1,440 hours × 20 units = 28,800 units

WN 3 — Earning of the worker

Earning = 28,800 units × Rs. 10 = Rs. 2,88,000

Statement of Earning for the Year

Earning under the piece wage rate system
ParticularsAmount / Units
Weekly working hours48 hrs
Number of weeks worked30
Total hours worked (48 × 30)1,440 hrs
Production per hour20 units
Total output (1,440 × 20)28,800 units
Wage rate per unitRs. 10
Earning of the worker (28,800 × 10)Rs. 2,88,000
Answer
  • Earning of the worker = Rs. 2,88,000
Assign. 16
Earnings of Riddhan under the piece rate wages payment system
Required: Earnings of Riddhan under piece rate wages payment system

Given: Normal rate per hour Rs. 60  •  Standard time per unit 20 min  •  Mr. Riddhan produced 400 units

Working Notes

WN 1 — Piece rate per unit

Standard Time per Unit = 20 minutes ÷ 60 = 1/3 hour Piece Rate = Rs. 60 × 1/3 hour = Rs. 20 per unit

WN 2 — Earnings

Earnings = 400 units × Rs. 20 = Rs. 8,000

Statement of Earnings of Mr. Riddhan

Earnings under the piece rate system
ParticularsAmount / Units
Standard time per unit20 min (1/3 hr)
Normal rate per hourRs. 60
Piece rate per unit (60 × 1/3)Rs. 20
Units produced400
Earnings of Mr. Riddhan (400 × 20)Rs. 8,000
Answer
  • Earnings of Mr. Riddhan = Rs. 8,000
Assign. 17
Wages payable to A, B, C and D under time rate and piece rate systems
Required: Wages payable to worker under time rate and piece rate of wages payment system

Given: Wage rate per hour = Rs. 50  •  Standard output = 6 minutes to produce one unit of output  •  Actual output in a day — A 100 units, B 150 units, C 200 units, D 300 units

Working Notes

WN 1 — Standard output per hour and piece rate

Standard Output per Hour = 60 minutes ÷ 6 minutes = 10 units Piece Rate per Unit = Rs. 50 ÷ 10 units = Rs. 5 per unit

WN 2 — Hours worked by each worker (output × 6 minutes)

A : 100 units × 6 min = 600 min = 10 hours B : 150 units × 6 min = 900 min = 15 hours C : 200 units × 6 min = 1,200 min = 20 hours D : 300 units × 6 min = 1,800 min = 30 hours

WN 3 — Wages under the time rate system (hours × Rs. 50)

A : 10 hours × Rs. 50 = Rs. 500 B : 15 hours × Rs. 50 = Rs. 750 C : 20 hours × Rs. 50 = Rs. 1,000 D : 30 hours × Rs. 50 = Rs. 1,500

WN 4 — Wages under the piece rate system (units × Rs. 5)

A : 100 units × Rs. 5 = Rs. 500 B : 150 units × Rs. 5 = Rs. 750 C : 200 units × Rs. 5 = Rs. 1,000 D : 300 units × Rs. 5 = Rs. 1,500

Comparative Statement of Wages Payable

Wages under the time rate and the piece rate system
ParticularsABCD
Actual output (units)100150200300
Hours worked (units × 6 min)10152030
Wages under time rate system (Rs.)5007501,0001,500
Wages under piece rate system (Rs.)5007501,0001,500
ⓘ Note

All four workers are producing at exactly the standard rate of 10 units per hour, so the two systems yield an identical wage for each worker. The printed answer key in the source page is cut off at the right edge after "Rs. 15..", which is Rs. 1,500 for worker D as computed above.

Answer
  • A = Rs. 500  •  B = Rs. 750  •  C = Rs. 1,000  •  D = Rs. 1,500 under both systems.
Assign. 18
Total wages under the piece rate and the time rate system
Required: Total wages under piece and time rate system

Given: Output during March 2,000 units  •  Wage rate Rs. 20 per hour  •  Estimated time to produce one unit 30 minutes

Working Notes

WN 1 — Standard time in hours and piece rate

Standard Time per Unit = 30 minutes ÷ 60 = 0.5 hour Piece Rate per Unit = Rs. 20 × 0.5 hour = Rs. 10 per unit

WN 2 — Wages under the piece rate system

Total Wages = 2,000 units × Rs. 10 = Rs. 20,000

WN 3 — Wages under the time rate system

Hours Worked = 2,000 units × 0.5 hour = 1,000 hours Total Wages = 1,000 hours × Rs. 20 = Rs. 20,000

Comparative Statement of Total Wages

Wages for the month of March under both systems
ParticularsPiece Rate SystemTime Rate System
Output (units)2,0002,000
Basis of paymentRs. 10 per unitRs. 20 per hour
Quantity used for payment2,000 units1,000 hrs
Total wages (Rs.)20,00020,000
ⓘ Note

The worker took exactly the estimated (standard) time for the output produced, so both systems give the same wage of Rs. 20,000. The printed answer key in the source page is cut off at the right edge after "Rs. 20", which is Rs. 20,000 as computed above.

Answer
  • Total wages under the piece rate system = Rs. 20,000
  • Total wages under the time rate system = Rs. 20,000
Project
Project Work — Labour Cost Report of a Manufacturing Company
Visit any nearby manufacturing company of your locality, collect the information and prepare a project report

Required in the report: (a) Name and address of the manufacturing company visited  •  (b) All labour cost, direct and indirect, related to the manufacturing process  •  (c) Number of total labours of the company  •  (d) Total wages paid by the company  •  (e) Method of wages payment used by the company

Important — This is field work

This project requires real data collected from an actual company in your own locality. No specimen figures have been invented here, because inventing them would defeat the purpose of the project and would be treated as false reporting. What follows is the method, the report structure and blank templates that you fill with the figures you collect.

Step-by-Step Method
  1. Select a company — choose a small or medium manufacturing unit near you: a furniture workshop, a brick factory, a garment or tailoring unit, a noodles or biscuit factory, a dairy, a steel or hume-pipe plant.
  2. Take permission first — write a short application through your school stating the purpose, and fix an appointment with the manager or the accountant.
  3. Prepare your questionnaire beforehand — list the five required items (a) to (e) as questions so that nothing is missed during the visit.
  4. Interview the right person — the accountant or the personnel officer holds the wage sheet, attendance register and payroll, which are your sources for items (b), (c) and (d).
  5. Classify what you collect — separate every labour payment into direct labour and indirect labour as you record it, rather than afterwards.
  6. Verify the totals — make sure the number of workers agrees with the attendance register and the total wages agree with the payroll for the same period. State the period clearly (one month or one year).
  7. Write and submit the report — use the format below, attach a photograph or the visit permission letter as evidence, and end with your own conclusion.
ⓘ How to classify the labour cost for item (b)

Direct labour cost — wages of workers who work directly on the product and whose time can be traced to it:

  • Machine operators, weavers, tailors, carpenters, masons.
  • Assembly-line and moulding workers.
  • Any worker whose wage can be charged straight to a job or product.

Indirect labour cost — wages of workers who support production but do not work on the product itself. This forms part of overheads:

  • Factory — supervisor, foreman, storekeeper, maintenance and repair staff, cleaner, security guard.
  • Office and administration — accountant, clerk, office assistant, peon.
  • Selling and distribution — salesman's salary, driver, delivery and loading staff.

Report Format — Part A: Particulars of the Company

To be filled from the information collected during the visit
ParticularsDetails
Name of the company 
Full address (ward, municipality, district) 
Nature of the product manufactured 
Year of establishment 
Name and designation of the person interviewed 
Date of the visit 
Period to which the wage data relates 

Report Format — Part B: Number of Workers and Total Wages

Statement of labour cost, direct and indirect
Category of WorkerNo. of WorkersRate of WagesTotal Wages (Rs.)
A. Direct Labour
  Machine operators / production workers   
  Assembly / finishing workers   
  Other direct workers   
Total direct labour cost — 
B. Indirect Labour
  Supervisor / foreman   
  Storekeeper / maintenance staff   
  Office staff (accountant, clerk, peon)   
  Security guard / cleaner / driver   
Total indirect labour cost — 
(c) & (d) Total number of labours and total wages paid — 

Report Format — Part C: Method of Wages Payment

Method of wages payment used by the company
Point of EnquiryFindings
System used (time rate / piece rate / both) 
If time rate — rate per hour, per day or per month 
If piece rate — rate per unit or per job 
Interval of payment (daily / weekly / monthly) 
Mode of payment (cash / bank / digital wallet) 
Overtime rate allowed 
Bonus, allowances and other facilities given 
Records maintained (attendance register, wage sheet, job card) 
Reason given by the company for choosing that system 
Useful Formulas for the Analysis Section
Total Labour Cost = Direct Labour Cost + Indirect Labour Cost Average Wage per Worker = Total Wages Paid ÷ Total Number of Workers Labour Cost per Unit = Total Labour Cost ÷ Total Units Produced Direct Labour Percentage = (Direct Labour Cost ÷ Total Labour Cost) × 100
What to Write in the Conclusion
  • Whether the company's labour cost is mainly direct or indirect, and what that indicates about how labour-intensive the work is.
  • Whether the wage system chosen suits the nature of the work — the piece rate for repetitive measurable output, the time rate for skilled or supervisory work.
  • Whether the company faces idle time or overtime, and what causes it.
  • Whether the records maintained are adequate for controlling labour cost.
  • Your own two or three suggestions for improving labour cost control in that company.

Frequently asked questions

What is Accounting for Labour about?

This chapter covers **Accounting for Labour**, explaining how businesses calculate, record, and control wages under different payment systems. It details the **time rate system** (payment based on hours worked) and **piece rate system** (payment based on output produced), along with concepts like **idle time, overtime, and labour cost control**. Practical problems illustrate wage calculations, differences between systems, and their advantages/disadvantages.

Which topics are covered in Accounting for Labour?

Class 12 Accounting “Accounting for Labour” covers: Definition and classification of labour cost (direct vs. indirect); Time rate system: calculation, advantages, and disadvantages; Piece rate system: calculation, merits, and demerits; Idle time: types (normal vs. abnormal) and accounting treatment; Overtime wages: calculation and rules for payment; Labour cost control techniques (recruitment, training, timekeeping, etc.); Differences between time rate and piece rate systems; Practical applications: wage computations under both systems.

What should I focus on in Accounting for Labour for the exam?

Focus on **solving numerical problems** (wage calculations under time/piece rate systems, overtime, and idle time) and **comparing the two wage systems** with their pros/cons, as these are frequently tested in both theory and practical questions.

What are the key formulas or definitions in Accounting for Labour?

Time rate wages = Total Hours Worked × Wage Rate per Hour; Piece rate wages = Number of Units Produced × Rate per Unit; Rate per Unit = (Wage Rate per Hour × Standard Time per Unit) OR (Wage Rate per Hour ÷ Standard Output per Hour); Idle Time = Time Paid For − Time Actually Worked on Production; Overtime Wages = Overtime Hours × Overtime Rate per Hour.

Where can I read the Class 12 Accounting “Accounting for Labour” solutions?

Right on this page. They are free and you do not need to sign up. For chapter quizzes and the AI tutor, install the Sikshya Plus app.

Study tips

Free for Class 9 to 12

Do not just read it. Practice it.

You have read the solutions for Accounting for Labour. Now test yourself, ask the AI tutor and keep your streak going.

Sikshya Plus chapter quiz screen with class, subject and difficulty options
Sikshya AI personal tutor chat inside the app
Sikshya Plus AI tools screen: question assistant, summarizer, translator, grammar checker
Chapter list with Past Q, materials, posts and books tabs
  • AI quizzes for this chapterTest yourself with instant feedback and explanations after every answer.
  • AI tutor, free, 24/7Stuck on a question? Ask in your own words and get a step-by-step explanation.
  • 14 AI tools in one appSummarizer, grammar checker, flashcards, essay help, math solver and more.
  • Past questions and notesPast papers and your own notes organized chapter by chapter.
Download free on Google Play Scan with your phone to install