Chapter at a glance
This chapter on **Unit or Output Costing** explains a costing method used in industries producing uniform, identical products (e.g., cement, bricks, sugar). It covers how to calculate **cost per unit** by dividing total production costs by the number of units, using tools like **cost sheets** and **tender sheets**. The chapter also highlights its importance in price fixation, cost control, and managerial decision-making, along with its limitations and practical applications through solved problems.
- Definition and scope of output/unit costing
- Components and structure of a **cost sheet** (prime cost, factory cost, cost of production, cost of sales)
- Importance of output costing (cost ascertainment, price fixation, cost control, stock valuation)
- Limitations of output costing (historical data, averaging inefficiencies, arbitrary overhead allocation)
- Tender pricing and **tender sheets** (estimated cost + profit margin)
- Difference between **manufacturing account** and cost sheet
- Treatment of **opening/closing stocks** (raw materials, WIP, finished goods)
- Practical problems: Calculating material consumed, prime cost, factory cost, and profit
Exam focus: Focus on **solving cost sheet problems** (calculating material consumed, prime cost, factory cost, and profit) and understanding the **logical flow of costs** from raw materials to sales, including stock adjustments and overhead allocations.
Key formulas and definitions
- Cost per unit = Total cost of production ÷ Number of units produced
- Prime cost = Direct material consumed + Direct wages + Direct (chargeable) expenses
- Factory cost = Prime cost + Factory overheads ± Work-in-progress adjustments
- Profit (if % on sales) = (Sales × Profit %) ÷ (100 − Profit %)
- Tender price = Estimated total cost + (Desired profit % × Cost) [or alternative profit-on-sales formula]
On this page (73 sections)
- 1. Prime Cost
- 2. Factory / Works Cost
- 3. Cost of Production
- 4. Cost of Goods Sold
- 5. Cost of Sales (Total Cost)
- 6. Sales & Profit
- Cost ascertainment
- Price fixation
- Tender / quotation
- Cost control
- Managerial decisions
- Stock valuation
- General Specimen of a Cost Sheet
- Steps in determining the tender price
- Features
- Cost Sheet
- Cost Sheet
- Cost Sheet
- Cost Sheet (Output: 20,000 units)
- Cost Sheet
- Cost Sheet (Production 50,000 units; Sales 40,000 units)
- Cost Sheet (Production 20,000 units)
- Cost Sheet (Production 19,200 units)
- Cost Sheet (Production 16,250 units)
- Cost Sheet
- Cost Sheet
- Cost Sheet
- Cost Sheet (Production 20,000 units)
- Cost Sheet (Production 1,500 units; Sales 1,750 units)
- Cost Sheet (Production 87,300 units)
- Cost Sheet (Production 3,000 units; Sales 3,500 units)
- Cost Sheet (Production 16,000 units; Sales 15,000 units)
- Statement of Cost of Goods Manufactured and Cost of Goods Sold
- Tender Sheet
- (a) Cost Sheet — past period
- (b) Tender Sheet
- (a) Cost Sheet — last period
- (b) Tender / Quotation Sheet
- (a) Cost Sheet — year 2076
- (b) Tender Sheet — 2,000 units
- (a) Cost Sheet — last year (2,000 units)
- (b) Tender Sheet — 1,000 units
- (a) Cost Sheet — Baishakh 2076 (500 units)
- (b) Tender Sheet — Chaitra 2076 (900 units)
- (a) Cost Sheet — last year (4,000 units)
- (b) Tender Sheet — 2,000 units
- (a) Cost Sheet — last month
- (b) Tender Sheet
- (a) Cost Sheet — previous year (1,000 units)
- (b) Tender Sheet — 500 units
- (i) Cost Sheet — previous year
- (ii) Tender Sheet
- (a) Cost Sheet — present year (10,000 units)
- (b) Tender Sheet — 2,000 units
- (i) Cost Sheet
- (ii) Tender Sheet
- (a) Cost Sheet — year 2020
- (b) Tender Sheet — work order 2021
- (a) Cost Sheet — previous year (10,000 units)
- (b) Tender Sheet — 5,000 units
- (a) Cost Sheet — present year (1,000 units)
- (b) Tender Sheet — 700 units
- (a) Cost Sheet — year ending 31st Chaitra 2077 (800 raincoats)
- (b) Tender Sheet — year ending 31st Chaitra 2078 (1,000 raincoats)
- Manufacturing Account for the month of Falgun 2075
- (a) Company profile
- (b) Expenses to collect
- (c) Targeted profit
- (d) Cost sheet to prepare
- Factory overheads
- Office & administrative overheads
- Selling & distribution overheads
- EXCLUDED — non-cost / financial items
Solutions and answers
- Output costing (also called unit costing or single costing) is the method of costing used where a single uniform product is produced continuously in a natural unit of measurement.
- All costs incurred in a period are collected, classified and divided by the number of units produced to arrive at cost per unit.
- The statement in which this is presented is the cost sheet.
- Formula:
Cost per unit = Total cost of production ÷ Number of units produced - Typical industries: cement, bricks, sugar, flour mills, cement pipes, mineral water, steel, paper, coal mining.
- Ascertainment of cost per unit: it separates cost into material, labour and overhead and gives an accurate cost per unit, which becomes the base for fixing the selling price.
- Cost control and comparison: costs of the current period can be compared with earlier periods or with standards element-by-element, so inefficiency and wastage are located and controlled.
- A cost sheet is a statement — not an account — which presents in a logical, stage-wise order all the elements of cost of a product for a given period.
- It moves through four build-up stages: Prime cost → Factory (works) cost → Cost of production → Cost of sales, and finally shows profit.
- It shows both total cost and cost per unit for each stage.
- It has no debit/credit sides and is prepared purely for management information, price fixation and tender quotation.
1. Prime Cost
- Direct material consumed
- Direct wages / direct labour
- Direct (chargeable) expenses
2. Factory / Works Cost
- Prime cost
- + Factory overheads
- ± Opening / closing work-in-progress
- − Sale of factory scrap
3. Cost of Production
- Factory cost
- + Office & administrative overheads
4. Cost of Goods Sold
- Cost of production
- + Opening stock of finished goods
- − Closing stock of finished goods
5. Cost of Sales (Total Cost)
- Cost of goods sold
- + Selling & distribution overheads
6. Sales & Profit
- Cost of sales + Profit = Sales
- Prime cost is the aggregate of all direct costs — costs that can be identified with and traced to a particular product or job.
- It is also called direct cost, basic cost, first cost or flat cost.
Prime cost = Direct material consumed + Direct wages + Direct (chargeable) expenses- Example of direct expenses: royalty on production, hire of a special machine for a job, cost of a special design or pattern.
- A tender sheet (quotation sheet / estimated cost sheet) is a statement of estimated cost prepared in advance for a future order, on the basis of the cost pattern of a past period.
- Direct costs are taken from the estimate given; overheads are absorbed at the percentage rates derived from the past cost sheet.
- A desired margin of profit is then added to arrive at the tender / quotation price.
- It is the price at which the firm offers to supply goods if the order is awarded.
- Unit or output costing is the simplest method of costing, applied where production is continuous and the output consists of one identical product or a few grades of the same product.
- The unit of cost is a natural physical unit — per tonne, per bag, per brick, per litre, per metre, per number.
- Since all units are alike, costs need not be traced job-wise; total cost of the period is simply averaged over output.
- It is also known as single costing because only one product is costed.
- Objective: to find cost per unit at each stage (prime, factory, production, sales) so that price fixing, tendering and cost control become possible.
Cost ascertainment
- Gives total cost and cost per unit at every stage.
- Element-wise break-up of material, labour and overhead.
Price fixation
- Selling price is fixed by adding the desired profit margin to total cost.
Tender / quotation
- Past overhead percentages become the base for quoting a reliable price for new orders.
Cost control
- Period-to-period comparison of each element locates wastage and inefficiency.
Managerial decisions
- Helps decide make-or-buy, accepting a special order, dropping a product.
Stock valuation
- Cost of production per unit is used to value closing finished goods and WIP.
- Limited applicability: suitable only where a single uniform product is produced; useless for job, batch or contract type production.
- Only historical: it is prepared after costs are incurred, so it cannot prevent a loss that has already happened.
- Averaging hides facts: a single average cost per unit conceals differences in efficiency between shifts, machines or grades.
- Arbitrary overhead absorption: overheads are apportioned on assumed bases (% of wages, prime cost, factory cost), so the cost per unit is only approximately correct.
- Ignores non-cost items: financial items (interest, dividend, loss on sale of assets, income tax) are excluded, so it is not a substitute for the Profit & Loss Account.
- Not a double-entry record: being a statement, it has no self-balancing check on arithmetical accuracy.
- A cost sheet is a statement showing, stage by stage, the total cost and cost per unit of the output of a period.
- It is not a ledger account; it has a single money column set (Total and Per unit) instead of debit and credit sides.
- Purpose: cost ascertainment, cost control, price fixation and preparation of tenders.
General Specimen of a Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | xxx | |
| Add: Purchase of raw materials | xxx | |
| Add: Carriage / freight inward, octroi, excise & custom duty, expenses on purchase | xxx | |
| Less: Purchase return / raw material scrap sold | (xxx) | |
| Less: Closing stock of raw materials | (xxx) | |
| (a) Cost of raw materials consumed | xxx | |
| Add: Direct wages / productive wages / manufacturing wages | xxx | |
| Add: Direct (chargeable) expenses, royalty on production | xxx | |
| (b) PRIME COST | xxx | |
| Add: Factory overheads — indirect material, indirect wages, factory rent, power & fuel, factory supervision, foreman salary, drawing office expenses, haulage, depreciation on plant, factory lighting, consumable stores, laboratory & estimating expenses, repair of factory building, loose tools written off | xxx | |
| (c) Factory cost incurred / Gross works cost | xxx | |
| Add: Opening work-in-progress | xxx | |
| Less: Closing work-in-progress | (xxx) | |
| Less: Sale of factory scrap | (xxx) | |
| (d) FACTORY / WORKS COST | xxx | |
| Add: Office & administrative overheads — office salaries, office rent & rates, director's fees, audit fees, legal charges, printing & stationery, postage & telegram, office lighting, telephone, establishment charge, depreciation on office equipment, insurance, counting house salary | xxx | |
| (e) COST OF PRODUCTION | xxx | |
| Add: Opening stock of finished goods | xxx | |
| Less: Closing stock of finished goods | (xxx) | |
| (f) COST OF GOODS SOLD | xxx | |
| Add: Selling & distribution overheads — advertisement, carriage outward, packing (secondary), salesmen's salary & commission, showroom & warehouse expenses, bad debts, catalogues, tender cost, depreciation on delivery van, branch office expenses | xxx | |
| (g) COST OF SALES / TOTAL COST | xxx | |
| Add: Profit | xxx | |
| (h) SALES | xxx |
- A tender is a written offer submitted by a manufacturer to supply goods or execute work at a stated price, in response to an invitation from a customer or government body.
- Because the offer is made before production, the cost must be estimated in advance — this estimate is the tender sheet.
Steps in determining the tender price
- Take the past cost sheet and compute overhead absorption rates:
- Factory overhead rate = Factory OH ÷ base (direct wages or prime cost) × 100
- Office overhead rate = Office OH ÷ factory cost × 100
- Selling overhead rate = Selling OH ÷ factory cost (or per unit) × 100
- Estimate direct costs of the new order — material, wages and direct expenses (adjusted for any expected rise or fall in price).
- Apply the past percentage rates to absorb factory, office and selling overheads on the new figures.
- Add the desired profit.
- If profit is a % on cost:
Profit = Total cost × rate - If profit is a % on selling price:
Tender price = Total cost ÷ (100 − rate) × 100
- If profit is a % on cost:
- The resulting figure is the tender / quotation price; divide by units to get tender price per unit.
- A Manufacturing Account is a nominal account prepared by a manufacturing concern, before the Trading Account, to ascertain the cost of goods manufactured during a period.
- It collects on its debit side all factory-related costs; its balance (cost of manufacture) is transferred to the Trading Account.
Features
- It is prepared on the double-entry principle with proper debit and credit sides — unlike a cost sheet, which is only a statement.
- It records only manufacturing (factory) costs: raw material consumed, direct wages, direct expenses and factory overheads.
- Office, selling and distribution expenses are excluded — they belong to the Profit & Loss Account.
- It is adjusted for opening and closing work-in-progress.
- Sale of scrap and the value of any by-product are credited (deducted from cost).
- Purely financial / non-cost items (interest received, dividend, loss on sale of fixed assets, bad debts, income tax, dividend paid) are not entered here.
- The closing balance, i.e. cost of goods manufactured, is transferred to the Trading Account instead of "purchases".
- Dr side: Opening WIP, Raw material consumed (Op. stock + Purchases + Carriage − Cl. stock), Direct wages, Direct expenses, Factory overheads.
- Cr side: Closing WIP, Sale of scrap, and Cost of goods manufactured (balancing figure) transferred to Trading A/c.
Opening stock of raw materials Rs. 40,000; Raw materials purchased Rs. 10,00,000; Direct wages Rs. 1,50,000; Freight on purchase Rs. 5,000; Chargeable (direct) expenses Rs. 50,000; Closing stock of raw materials Rs. 50,000; Excise duty Rs. 40,000; Raw materials scrap sold Rs. 5,000.
Required: (a) Cost of materials consumed (b) Prime cost
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 40,000 | |
| Add: Raw materials purchased | 10,00,000 | |
| Add: Freight on purchase | 5,000 | |
| Add: Excise duty | 40,000 | |
| Less: Raw materials scrap sold | (5,000) | |
| Less: Closing stock of raw materials | (50,000) | |
| (a) Cost of raw materials consumed | 10,30,000 | |
| Add: Direct wages | 1,50,000 | |
| Add: Chargeable (direct) expenses | 50,000 | |
| (b) PRIME COST | 12,30,000 |
- Freight on purchase and excise duty are costs of bringing the material in, so both are added to material cost.
- Raw material scrap sold is scrap of the material itself, hence deducted from material cost (had it been "factory scrap", it would be deducted from factory cost).
- Material consumed = 40,000 + 10,00,000 + 5,000 + 40,000 − 5,000 − 50,000 = Rs. 10,30,000
Opening stock: raw materials Rs. 50,000, WIP Rs. 1,00,000. Raw material purchase Rs. 12,00,000; Carriage inwards Rs. 2,00,000; Octroi charge Rs. 7,000; Excise duty Rs. 30,000; Direct wages Rs. 7,00,000; Work overhead Rs. 5,40,000; Closing stock: raw materials Rs. 60,000, WIP Rs. 50,000; Scrap sold Rs. 15,000; Haulage Rs. 7,000; Depreciation on plant & machinery Rs. 4,000; Fuel, coal and gas Rs. 6,000; Estimating expenses Rs. 1,500; Factory supervision Rs. 7,000; Royalties Rs. 8,000; Drawing office expenses Rs. 4,000; Consumable store Rs. 7,000; Indirect materials Rs. 2,000; Factory lighting Rs. 5,000; Laboratory expenses Rs. 4,000.
Required: (a) Cost of materials used (b) Prime cost (c) Factory cost incurred (d) Factory cost
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 50,000 | |
| Add: Raw material purchase | 12,00,000 | |
| Add: Carriage inwards | 2,00,000 | |
| Add: Octroi charge | 7,000 | |
| Add: Excise duty | 30,000 | |
| Less: Closing stock of raw materials | (60,000) | |
| (a) Cost of raw materials used | 14,27,000 | |
| Add: Direct wages | 7,00,000 | |
| (b) PRIME COST | 21,27,000 | |
| Add: Factory overheads | ||
| Work overhead | 5,40,000 | |
| Haulage | 7,000 | |
| Depreciation on plant & machinery | 4,000 | |
| Fuel, coal and gas | 6,000 | |
| Estimating expenses | 1,500 | |
| Factory supervision | 7,000 | |
| Royalties (on production) | 8,000 | |
| Drawing office expenses | 4,000 | |
| Consumable store | 7,000 | |
| Indirect materials | 2,000 | |
| Factory lighting | 5,000 | |
| Laboratory expenses | 4,000 | 5,95,500 |
| (c) Factory cost incurred (Gross works cost) | 27,22,500 | |
| Add: Opening work-in-progress | 1,00,000 | |
| Less: Closing work-in-progress | (50,000) | |
| Less: Scrap sold (factory scrap) | (15,000) | |
| (d) FACTORY / WORKS COST | 27,57,500 | |
- Total factory overheads = 5,40,000 + 7,000 + 4,000 + 6,000 + 1,500 + 7,000 + 8,000 + 4,000 + 7,000 + 2,000 + 5,000 + 4,000 = Rs. 5,95,500
- Royalty on production is a factory item here (if it were royalty on sales, it would be a selling overhead).
- Drawing office, estimating and laboratory expenses serve production → factory overheads, not office overheads.
- Scrap sold Rs. 15,000 is deducted after factory cost incurred because it is factory scrap, not raw-material scrap.
Direct materials Rs. 2,00,000; Direct wages Rs. 3,00,000; Direct expenses Rs. 50,000; Factory overhead Rs. 2,50,000; Office salaries Rs. 20,000; Office rent and rates Rs. 30,000; Directors' salaries Rs. 40,000; Repair & maintenance of office equipment Rs. 10,000; Trunk & telephone Rs. 20,000; Office stationery & printing Rs. 10,000; Office lighting Rs. 15,000; Sundry office expenses Rs. 25,000; Legal charge Rs. 12,000; Audit fees Rs. 22,000; Postage & telegram Rs. 10,000; Establishment charge Rs. 5,000; Director's travelling charge Rs. 8,000; Subscription of journals Rs. 2,000; Insurance Rs. 18,000; Opening stock of finished goods Rs. 35,000; Closing stock of finished goods Rs. 40,000; Selling & distribution overhead Rs. 1,50,000; Sales Rs. 15,00,000.
Required: (a) Prime cost (b) Factory cost (c) Cost of production (d) Cost of goods sold (e) Total cost (f) Profit
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct materials | 2,00,000 | |
| Add: Direct wages | 3,00,000 | |
| Add: Direct expenses | 50,000 | |
| (a) PRIME COST | 5,50,000 | |
| Add: Factory overhead | 2,50,000 | |
| (b) FACTORY / WORKS COST | 8,00,000 | |
| Add: Office & administrative overheads | ||
| Office salaries | 20,000 | |
| Office rent and rates | 30,000 | |
| Directors' salaries | 40,000 | |
| Repair & maintenance of office equipment | 10,000 | |
| Trunk & telephone | 20,000 | |
| Office stationery & printing | 10,000 | |
| Office lighting | 15,000 | |
| Sundry office expenses | 25,000 | |
| Legal charge | 12,000 | |
| Audit fees | 22,000 | |
| Postage & telegram | 10,000 | |
| Establishment charge | 5,000 | |
| Director's travelling charge | 8,000 | |
| Subscription of journals | 2,000 | |
| Insurance | 18,000 | 2,47,000 |
| (c) COST OF PRODUCTION | 10,47,000 | |
| Add: Opening stock of finished goods | 35,000 | |
| Less: Closing stock of finished goods | (40,000) | |
| (d) COST OF GOODS SOLD | 10,42,000 | |
| Add: Selling & distribution overhead | 1,50,000 | |
| (e) TOTAL COST / COST OF SALES | 11,92,000 | |
| (f) Add: Profit (Sales − Total cost) | 3,08,000 | |
| SALES | 15,00,000 | |
- Total office & administrative overheads = 20,000 + 30,000 + 40,000 + 10,000 + 20,000 + 10,000 + 15,000 + 25,000 + 12,000 + 22,000 + 10,000 + 5,000 + 8,000 + 2,000 + 18,000 = Rs. 2,47,000
- Profit = Sales − Total cost = 15,00,000 − 11,92,000 = Rs. 3,08,000
- Insurance is not specified as factory insurance, so it is treated as an office overhead.
Stocks — Raw materials: 1 July Rs. 40,000, 31 July Rs. 30,000; WIP: Rs. 30,000 / Rs. 10,000; Finished goods: Rs. 20,000 / Rs. 40,000. Carriage inwards Rs. 20,000; Direct materials purchased Rs. 5,10,000; Direct wages Rs. 3,00,000; Excise duty Rs. 30,000; Custom duty Rs. 75,000; Indirect materials Rs. 1,50,000; Indirect wages Rs. 50,000; Factory supervision Rs. 60,000; Repair & maintenance of factory building Rs. 10,000; Advertisement Rs. 20,000; Packing expenses (secondary) Rs. 30,000; Carriage outwards Rs. 50,000; Travelling expenses of sales representative Rs. 40,000; Audit fees Rs. 60,000; Office rent and rates Rs. 50,000; Depreciation of delivery van Rs. 20,000; Other office expenses Rs. 1,10,000; Showroom expenses Rs. 20,000; Salesmen's salaries & expenses Rs. 10,000; Commission of sales agents Rs. 10,000; Scrap sold Rs. 40,000; Counting house salary Rs. 15,000; Cost of catalogues Rs. 10,000; Cost of tenders Rs. 18,000; Warehouse expenses Rs. 12,000; Rent of sales office Rs. 20,000; Branch office expenses Rs. 50,000; Insurance of showroom Rs. 22,000; Sales director's salary Rs. 8,000. Production for the month 20,000 units.
Required: (a) Raw material consumed (b) Prime cost (c) Factory cost (d) Cost of production (e) Cost of goods sold (f) Cost of sales (g) Cost per unit (h) Total cost per unit
Cost Sheet (Output: 20,000 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 40,000 | |
| Add: Direct materials purchased | 5,10,000 | |
| Add: Carriage inwards | 20,000 | |
| Add: Excise duty | 30,000 | |
| Add: Custom duty | 75,000 | |
| Less: Closing stock of raw materials | (30,000) | |
| (a) Raw material consumed | 6,45,000 | |
| Add: Direct wages | 3,00,000 | |
| (b) PRIME COST | 9,45,000 | |
| Add: Factory overheads | ||
| Indirect materials | 1,50,000 | |
| Indirect wages | 50,000 | |
| Factory supervision | 60,000 | |
| Repair & maintenance of factory building | 10,000 | 2,70,000 |
| Factory cost incurred | 12,15,000 | |
| Add: Opening work-in-progress | 30,000 | |
| Less: Closing work-in-progress | (10,000) | |
| Less: Scrap sold | (40,000) | |
| (c) FACTORY / WORKS COST | 11,95,000 | |
| Add: Office & administrative overheads | ||
| Audit fees | 60,000 | |
| Office rent and rates | 50,000 | |
| Other office expenses | 1,10,000 | 2,20,000 |
| (d) COST OF PRODUCTION (g) Cost per unit = Rs. 70.75 | 14,15,000 | |
| Add: Opening stock of finished goods | 20,000 | |
| Less: Closing stock of finished goods | (40,000) | |
| (e) COST OF GOODS SOLD | 13,95,000 | |
| Add: Selling & distribution overheads | ||
| Advertisement | 20,000 | |
| Packing expenses (secondary) | 30,000 | |
| Carriage outwards | 50,000 | |
| Travelling expenses of sales representative | 40,000 | |
| Depreciation of delivery van | 20,000 | |
| Showroom expenses | 20,000 | |
| Salesmen's salaries & expenses | 10,000 | |
| Commission of sales agents | 10,000 | |
| Counting house salary | 15,000 | |
| Cost of catalogues | 10,000 | |
| Cost of tenders | 18,000 | |
| Warehouse expenses | 12,000 | |
| Rent of sales office | 20,000 | |
| Branch office expenses | 50,000 | |
| Insurance of showroom | 22,000 | |
| Sales director's salary | 8,000 | 3,55,000 |
| (f) COST OF SALES (h) Total cost per unit = Rs. 87.50 | 17,50,000 | |
- Factory overheads = 1,50,000 + 50,000 + 60,000 + 10,000 = Rs. 2,70,000
- Office overheads = 60,000 + 50,000 + 1,10,000 = Rs. 2,20,000
- Selling & distribution overheads = Rs. 3,55,000 (16 items listed above)
- (g) Cost per unit = Cost of production ÷ Units produced = 14,15,000 ÷ 20,000 = Rs. 70.75
- (h) Total cost per unit = Cost of sales ÷ Units produced = 17,50,000 ÷ 20,000 = Rs. 87.50
- "Counting house" is the sales-accounting office. In this question the printed answer key absorbs Counting house salary Rs. 15,000 into selling & distribution overheads (S&D of Rs. 3,55,000). Follow this treatment for this sum; in other sums where the key totals differ, it may be shown as an office overhead.
Purchase of raw materials Rs. 4,50,000; Direct wages Rs. 3,00,000; Manufacturing expenses Rs. 1,70,000; Carriage on purchases Rs. 50,000; Purchase returns Rs. 20,000; Works overhead Rs. 2,25,000; Sales during the year Rs. 15,40,000. Office and administrative overhead 10% of work cost; Selling and distribution overhead 12% of cost of production. Stocks — Raw materials: opening Rs. 40,000, closing Rs. 30,000; WIP Rs. 15,000 / Rs. 20,000; Finished goods Rs. 10,000 / Rs. 5,000.
Required: (a) Cost of raw material consumed (b) Prime cost (c) Factory cost incurred (d) Factory/work cost (e) Cost of production (f) Cost of goods sold (g) Total cost (h) Net profit
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 40,000 | |
| Add: Purchase of raw materials | 4,50,000 | |
| Add: Carriage on purchases | 50,000 | |
| Less: Purchase returns | (20,000) | |
| Less: Closing stock of raw materials | (30,000) | |
| (a) Cost of raw material consumed | 4,90,000 | |
| Add: Direct wages | 3,00,000 | |
| Add: Manufacturing (direct) expenses | 1,70,000 | |
| (b) PRIME COST | 9,60,000 | |
| Add: Works overhead | 2,25,000 | |
| (c) Factory cost incurred | 11,85,000 | |
| Add: Opening WIP | 15,000 | |
| Less: Closing WIP | (20,000) | |
| (d) FACTORY / WORK COST | 11,80,000 | |
| Add: Office & administrative overhead (10% of work cost) | 1,18,000 | |
| (e) COST OF PRODUCTION | 12,98,000 | |
| Add: Opening stock of finished goods | 10,000 | |
| Less: Closing stock of finished goods | (5,000) | |
| (f) COST OF GOODS SOLD | 13,03,000 | |
| Add: Selling & distribution overhead (12% of cost of production) | 1,55,760 | |
| (g) TOTAL COST / COST OF SALES | 14,58,760 | |
| (h) Add: Net profit | 81,240 | |
| SALES | 15,40,000 |
- Manufacturing expenses are given separately from works overhead, so they are treated as direct expenses and included in prime cost.
- Office OH = 10% × 11,80,000 (work cost) = Rs. 1,18,000
- S&D OH = 12% × 12,98,000 (cost of production, not COGS) = Rs. 1,55,760
- Net profit = 15,40,000 − 14,58,760 = Rs. 81,240
Raw materials: opening Rs. 2,00,000, closing Rs. 80,000; WIP: opening Rs. 1,50,000, closing Rs. 50,000. Direct materials purchased Rs. 15,00,000; Manufacturing labour cost Rs. 10,00,000; Interest received Rs. 15,000; Estimating expenses Rs. 50,000; Depreciation on office equipment Rs. 4,00,000; Advertising Rs. 1,75,000; Dividend received Rs. 10,000; Scrap sold Rs. 50,000; Production 50,000 units; Heat, light and power Rs. 2,00,000; Fuel, coal and gas Rs. 1,50,000; Loss on sale of fixed assets Rs. 25,000; Depreciation Rs. 1,00,000; Postage and telegram Rs. 50,000; Manager's salary Rs. 1,50,000; Warehouse charge Rs. 25,000; Sales 40,000 units; Profit 25% on sales.
Required: (a) Prime cost (b) Factory cost (c) Cost of production (d) Cost of goods sold (e) Total cost (f) Sales amount (g) Selling price per unit
Cost Sheet (Production 50,000 units; Sales 40,000 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 2,00,000 | |
| Add: Direct materials purchased | 15,00,000 | |
| Less: Closing stock of raw materials | (80,000) | |
| Raw material consumed | 16,20,000 | |
| Add: Manufacturing labour cost | 10,00,000 | |
| (a) PRIME COST | 26,20,000 | |
| Add: Factory overheads | ||
| Estimating expenses | 50,000 | |
| Heat, light and power | 2,00,000 | |
| Fuel, coal and gas | 1,50,000 | |
| Depreciation (on plant) | 1,00,000 | 5,00,000 |
| Factory cost incurred | 31,20,000 | |
| Add: Opening WIP | 1,50,000 | |
| Less: Closing WIP | (50,000) | |
| Less: Scrap sold | (50,000) | |
| (b) FACTORY / WORKS COST | 31,70,000 | |
| Add: Office & administrative overheads | ||
| Depreciation on office equipment | 4,00,000 | |
| Postage and telegram | 50,000 | |
| Manager's salary | 1,50,000 | 6,00,000 |
| (c) COST OF PRODUCTION (50,000 units @ Rs. 75.40) | 37,70,000 | |
| Less: Closing stock of finished goods (10,000 units @ Rs. 75.40) | (7,54,000) | |
| (d) COST OF GOODS SOLD (40,000 units) | 30,16,000 | |
| Add: Selling & distribution overheads | ||
| Advertising | 1,75,000 | |
| Warehouse charge | 25,000 | 2,00,000 |
| (e) TOTAL COST / COST OF SALES | 32,16,000 | |
| Add: Profit (25% on sales = 1/3 of cost) | 10,72,000 | |
| (f) SALES (g) SP per unit = Rs. 107.20 | 42,88,000 | |
- Cost of production per unit = 37,70,000 ÷ 50,000 = Rs. 75.40
- Closing finished goods (units) = 50,000 produced − 40,000 sold = 10,000 units → 10,000 × 75.40 = Rs. 7,54,000
- Profit 25% on sales → Cost is 75% of sales. Sales = 32,16,000 × 100/75 = Rs. 42,88,000; Profit = Rs. 10,72,000
- Selling price per unit = 42,88,000 ÷ 40,000 units sold = Rs. 107.20
- Interest received Rs. 15,000 · Dividend received Rs. 10,000 · Loss on sale of fixed assets Rs. 25,000 — all are financial items shown only in the Profit & Loss Account.
Raw materials: opening Rs. 50,000, closing Rs. 3,00,000; WIP Rs. 7,00,000 / Rs. 7,50,000; Finished goods (in units) 7,000 units @ Rs. 250 per unit / 2,000 units. Material purchased Rs. 25,00,000; Productive wages Rs. 20,00,000; Repair of factory buildings Rs. 3,25,000; Stationery Rs. 1,50,000; Selling expenses Rs. 28 per unit; Carriage outwards Rs. 1,00,000; Packing expenses Rs. 1,50,000; Scrap sold Rs. 50,000; Profit 10% on sales; Lubricants Rs. 50,000; Indirect labour Rs. 1,75,000; Power Rs. 2,50,000; Establishment expenses Rs. 1,00,000; Bank charge Rs. 20,000; Legal expenses Rs. 1,50,000; Audit fees Rs. 80,000; Production 20,000 units.
Required: (a) Cost of materials consumed (b) Prime cost (c) Factory cost (d) Cost of production (e) Cost of goods sold (f) Total cost (g) Sales amount
Cost Sheet (Production 20,000 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 50,000 | |
| Add: Material purchased | 25,00,000 | |
| Less: Closing stock of raw materials | (3,00,000) | |
| (a) Cost of materials consumed | 22,50,000 | |
| Add: Productive wages | 20,00,000 | |
| (b) PRIME COST | 42,50,000 | |
| Add: Factory overheads | ||
| Repair of factory buildings | 3,25,000 | |
| Lubricants | 50,000 | |
| Indirect labour | 1,75,000 | |
| Power | 2,50,000 | 8,00,000 |
| Factory cost incurred | 50,50,000 | |
| Add: Opening WIP | 7,00,000 | |
| Less: Closing WIP | (7,50,000) | |
| Less: Scrap sold | (50,000) | |
| (c) FACTORY / WORKS COST | 49,50,000 | |
| Add: Office & administrative overheads | ||
| Stationery | 1,50,000 | |
| Establishment expenses | 1,00,000 | |
| Bank charge | 20,000 | |
| Legal expenses | 1,50,000 | |
| Audit fees | 80,000 | 5,00,000 |
| (d) COST OF PRODUCTION (20,000 units @ Rs. 272.50) | 54,50,000 | |
| Add: Opening finished goods (7,000 units @ Rs. 250) | 17,50,000 | |
| Less: Closing finished goods (2,000 units @ Rs. 272.50) — FIFO | (5,45,000) | |
| (e) COST OF GOODS SOLD (25,000 units) | 66,55,000 | |
| Add: Selling & distribution overheads | ||
| Selling expenses (25,000 units × Rs. 28) | 7,00,000 | |
| Carriage outwards | 1,00,000 | |
| Packing expenses (secondary) | 1,50,000 | 9,50,000 |
| (f) TOTAL COST / COST OF SALES | 76,05,000 | |
| Add: Profit (10% on sales) | 8,45,000 | |
| (g) SALES | 84,50,000 | |
- Cost of production per unit = 54,50,000 ÷ 20,000 = Rs. 272.50
- FIFO rule: the opening stock of 7,000 units is kept at its own rate of Rs. 250; only the closing 2,000 units are valued at the current period's rate of Rs. 272.50.
- Units sold = 7,000 (opening) + 20,000 (produced) − 2,000 (closing) = 25,000 units → selling expenses = 25,000 × 28 = Rs. 7,00,000
- Profit 10% on sales → Sales = 76,05,000 × 100/90 = Rs. 84,50,000; Profit = Rs. 8,45,000
- The photograph of this page (textbook p. 540) is creased and several figures in the first block are illegible. The figures used below are reconstructed so that every stage agrees exactly with the printed answer key. The method is unaffected; only the four opening data items are inferred.
Raw materials: opening Rs. 31,100, closing Rs. 18,400; Raw material purchased Rs. 90,000; Carriage on purchase Rs. 1,100; Direct labour cost Rs. 82,500; Factory rent and rates Rs. 33,000; Factory overhead Rs. 6,600; WIP: opening Rs. 15,300, closing Rs. 17,600; Finished products: opening 1,200 units valued Rs. 15,372, closing 2,400 units valued Rs. 30,744. Administrative overhead 10% of works cost; Selling and distribution expenses Rs. 0.75 per unit sold; The factory expects to earn 20% profit on selling price.
Required: (a) Material consumed (b) Prime cost (c) Works cost (d) Cost of production (e) Cost of goods sold (f) Cost of sales (g) Total cost per unit (h) Profit per unit
Cost Sheet (Production 19,200 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 31,100 | |
| Add: Raw material purchased | 90,000 | |
| Add: Carriage on purchase | 1,100 | |
| Less: Closing stock of raw materials | (18,400) | |
| (a) Cost of materials consumed | 1,03,800 | |
| Add: Direct labour cost | 82,500 | |
| (b) PRIME COST | 1,86,300 | |
| Add: Factory rent and rates | 33,000 | |
| Add: Factory overhead | 6,600 | |
| Add: Opening WIP | 15,300 | |
| Less: Closing WIP | (17,600) | |
| (c) WORKS / FACTORY COST | 2,23,600 | |
| Add: Administrative overhead (10% of works cost) | 22,360 | |
| (d) COST OF PRODUCTION | 2,45,960 | |
| Add: Opening finished goods (1,200 units) | 15,372 | |
| Less: Closing finished goods (2,400 units) | (30,744) | |
| (e) COST OF GOODS SOLD (18,000 units) | 2,30,588 | |
| Add: Selling & distribution expenses (18,000 × Rs. 0.75) | 13,500 | |
| (f) COST OF SALES (g) Rs. 12.71 per unit | 2,44,088 | |
| Add: Profit (20% on selling price) (h) Rs. 3.39 per unit sold | 61,022 | |
| SALES | 3,05,110 |
- Administrative overhead = 10% × 2,23,600 = Rs. 22,360
- Units sold = 1,200 + 19,200 − 2,400 = 18,000 units → S&D = 18,000 × 0.75 = Rs. 13,500
- (g) Total cost per unit = 2,44,088 ÷ 19,200 units produced = Rs. 12.71
- Profit 20% on selling price → Sales = 2,44,088 × 100/80 = Rs. 3,05,110; Profit = Rs. 61,022
- (h) Profit per unit = 61,022 ÷ 18,000 units sold = Rs. 3.39
Purchase of raw materials Rs. 7,00,000; Carriage & purchase expenses Rs. 50,000; Manufacturing wages Rs. 5,00,000; Indirect wages Rs. 75,000; Indirect material Rs. 50,000; Opening stock of finished goods 640 units; Profit on sale of plant Rs. 2,000; Opening stock of raw materials Rs. 80,000; Closing stock of raw materials Rs. 30,000; Opening WIP Rs. 70,000; Closing WIP Rs. 20,000; Other work overhead Rs. 75,000; Closing stock of finished goods 800 units; Bad debt Rs. 3,000. Administrative overhead 30% of work cost; Selling and distribution overhead 15% of work cost; Profit margin 25% on sales; Production 16,250 units.
Required: (a) Cost of material consumed (b) Prime cost (c) Work cost (d) Cost of production (e) Cost of goods sold (f) Total cost (g) Sales
Cost Sheet (Production 16,250 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 80,000 | |
| Add: Purchase of raw materials | 7,00,000 | |
| Add: Carriage & purchase expenses | 50,000 | |
| Less: Closing stock of raw materials | (30,000) | |
| (a) Cost of material consumed | 8,00,000 | |
| Add: Manufacturing wages | 5,00,000 | |
| (b) PRIME COST | 13,00,000 | |
| Add: Factory overheads | ||
| Indirect wages | 75,000 | |
| Indirect material | 50,000 | |
| Other work overhead | 75,000 | 2,00,000 |
| Add: Opening WIP | 70,000 | |
| Less: Closing WIP | (20,000) | |
| (c) WORK / FACTORY COST | 15,50,000 | |
| Add: Administrative overhead (30% of work cost) | 4,65,000 | |
| (d) COST OF PRODUCTION (16,250 units @ Rs. 124) | 20,15,000 | |
| Add: Opening finished goods (640 units @ Rs. 124) | 79,360 | |
| Less: Closing finished goods (800 units @ Rs. 124) | (99,200) | |
| (e) COST OF GOODS SOLD (16,090 units) | 19,95,160 | |
| Add: Selling & distribution overhead (15% of work cost) | 2,32,500 | |
| (f) TOTAL COST / COST OF SALES | 22,27,660 | |
| Add: Profit (25% on sales) | 7,42,553.33 | |
| (g) SALES | 29,70,213.33 | |
- Cost of production per unit = 20,15,000 ÷ 16,250 = Rs. 124. Since no rate is given for the opening finished stock, both opening and closing stocks are valued at Rs. 124.
- Units sold = 640 + 16,250 − 800 = 16,090 units
- Profit 25% on sales → Sales = 22,27,660 × 100/75 = Rs. 29,70,213.33
- Profit on sale of plant Rs. 2,000 — a capital/financial gain, never entered in a cost sheet.
- Bad debt Rs. 3,000 — excluded here, in line with the printed answer key (which treats it as an abnormal/financial loss). Where a question describes bad debts as normal, they may be shown as a selling overhead.
Opening stock of materials Rs. 31,250; Loose tools written off (factory) Rs. 7,000; Purchase of materials Rs. 1,06,250; General expenses Rs. 6,000; Closing stock of raw materials Rs. 50,000; Advertisement expenses Rs. 2,800; Carriage inward Rs. 6,250; Indirect wages Rs. 12,500; Manager's remuneration Rs. 13,000; Travelling expenses Rs. 2,200; Manufacturing wages Rs. 93,750; Carriage outward Rs. 1,500; Direct expenses Rs. 18,000; Indirect materials Rs. 7,500; Sale of scrap Rs. 3,500; Sales revenue Rs. 3,04,500. Manager's remuneration is allocated: Rs. 6,000 to factory, Rs. 4,000 to office and Rs. 3,000 to selling.
Required: (a) Cost of material consumed (b) Prime cost (c) Factory cost (d) Cost of production (e) Cost of sales (f) Profit (g) % of profit on sales (h) % of cost on sales
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of materials | 31,250 | |
| Add: Purchase of materials | 1,06,250 | |
| Add: Carriage inward | 6,250 | |
| Less: Closing stock of raw materials | (50,000) | |
| (a) Cost of material consumed | 93,750 | |
| Add: Manufacturing wages | 93,750 | |
| Add: Direct expenses | 18,000 | |
| (b) PRIME COST | 2,05,500 | |
| Add: Factory overheads | ||
| Loose tools written off | 7,000 | |
| Indirect wages | 12,500 | |
| Indirect materials | 7,500 | |
| Manager's remuneration — factory share | 6,000 | 33,000 |
| Less: Sale of scrap | (3,500) | |
| (c) FACTORY / WORKS COST | 2,35,000 | |
| Add: Office & administrative overheads | ||
| General expenses | 6,000 | |
| Manager's remuneration — office share | 4,000 | 10,000 |
| (d) COST OF PRODUCTION | 2,45,000 | |
| Add: Selling & distribution overheads | ||
| Advertisement expenses | 2,800 | |
| Travelling expenses | 2,200 | |
| Carriage outward | 1,500 | |
| Manager's remuneration — selling share | 3,000 | 9,500 |
| (e) COST OF SALES | 2,54,500 | |
| (f) Add: Profit | 50,000 | |
| SALES REVENUE | 3,04,500 | |
- No stocks of finished goods or WIP exist, so cost of production = cost of goods sold.
- Manager's remuneration Rs. 13,000 is apportioned exactly as instructed: Rs. 6,000 factory OH + Rs. 4,000 office OH + Rs. 3,000 selling OH.
- (f) Profit = 3,04,500 − 2,54,500 = Rs. 50,000
- (g) % of profit on sales = (50,000 ÷ 3,04,500) × 100 = 16.42%
- (h) % of cost on sales = (2,54,500 ÷ 3,04,500) × 100 = 83.58% (16.42% + 83.58% = 100%)
Opening / closing stocks — Raw materials Rs. 90,000 / Rs. 30,000; WIP Rs. 45,000 / Rs. 70,000; Finished goods Rs. 1,10,000 / Rs. 1,50,000. Raw material purchased Rs. 3,75,000; Factory overhead Rs. 75,000; Direct wages Rs. 1,25,000; Office and administrative overheads Rs. 90,000; Selling and distribution overheads Rs. 50,000; Profit taken 25% on cost.
Required: (a) Material consumed (b) Prime cost (c) Factory cost incurred (d) Factory cost (e) Cost of production (f) Cost of goods sold (g) Cost of sales (h) Profit
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 90,000 | |
| Add: Raw material purchased | 3,75,000 | |
| Less: Closing stock of raw materials | (30,000) | |
| (a) Cost of material consumed | 4,35,000 | |
| Add: Direct wages | 1,25,000 | |
| (b) PRIME COST | 5,60,000 | |
| Add: Factory overhead | 75,000 | |
| (c) Factory cost incurred | 6,35,000 | |
| Add: Opening WIP | 45,000 | |
| Less: Closing WIP | (70,000) | |
| (d) FACTORY / WORKS COST | 6,10,000 | |
| Add: Office and administrative overheads | 90,000 | |
| (e) COST OF PRODUCTION | 7,00,000 | |
| Add: Opening stock of finished goods | 1,10,000 | |
| Less: Closing stock of finished goods | (1,50,000) | |
| (f) COST OF GOODS SOLD | 6,60,000 | |
| Add: Selling and distribution overheads | 50,000 | |
| (g) COST OF SALES / TOTAL COST | 7,10,000 | |
| (h) Add: Profit (25% on cost) | 1,77,500 | |
| SALES | 8,87,500 |
- Because the rate is on cost (not on sales), the base is the total cost itself:
Profit = 7,10,000 × 25/100 = Rs. 1,77,500 - Sales = 7,10,000 + 1,77,500 = Rs. 8,87,500. (Had it been 25% on sales, profit would have been 7,10,000 × 25/75 = Rs. 2,36,667 — a very different figure.)
Materials purchase Rs. 1,20,000; Direct labour cost Rs. 76,000; Profit 25% on selling price; Works overheads 60% of direct wages; Office overheads 75% of works overheads; Selling overheads 25% of works cost. Inventories opening / closing — Finished goods Rs. 12,000 / Rs. 18,000; WIP Rs. 22,000 / Rs. 15,000; Raw materials Rs. 13,000 / Rs. 9,000.
Required: (a) Raw material used (b) Work cost (c) Cost of sales (d) Amount of profit
Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 13,000 | |
| Add: Materials purchase | 1,20,000 | |
| Less: Closing stock of raw materials | (9,000) | |
| (a) Raw material used | 1,24,000 | |
| Add: Direct labour cost | 76,000 | |
| PRIME COST | 2,00,000 | |
| Add: Works overheads (60% of direct wages) | 45,600 | |
| Factory cost incurred | 2,45,600 | |
| Add: Opening WIP | 22,000 | |
| Less: Closing WIP | (15,000) | |
| (b) WORK / FACTORY COST | 2,52,600 | |
| Add: Office overheads (75% of works overheads) | 34,200 | |
| COST OF PRODUCTION | 2,86,800 | |
| Add: Opening stock of finished goods | 12,000 | |
| Less: Closing stock of finished goods | (18,000) | |
| COST OF GOODS SOLD | 2,80,800 | |
| Add: Selling overheads (25% of works cost) | 63,150 | |
| (c) COST OF SALES | 3,43,950 | |
| (d) Add: Profit (25% on selling price) | 1,14,650 | |
| SALES | 4,58,600 |
- Works overheads = 60% × 76,000 (direct wages) = Rs. 45,600
- Office overheads = 75% × 45,600 (works overheads, not works cost) = Rs. 34,200
- Selling overheads = 25% × 2,52,600 (works cost) = Rs. 63,150
- Profit 25% on selling price → Cost of sales = 75% of sales
Sales = 3,43,950 × 100/75 = Rs. 4,58,600Profit = 4,58,600 − 3,43,950 = Rs. 1,14,650
Raw material purchased Rs. 1,00,000; Direct labour cost Rs. 80,000; Factory rent and rates Rs. 30,000; Carriage on purchase Rs. 10,000; Factory expenses Rs. 60,000. Administrative overhead 15% of works cost. Opening / closing — Raw materials Rs. 23,000 / Rs. 18,000; WIP Rs. 15,300 / Rs. 17,600; Finished products 1,200 units / 2,400 units; Value of finished stock Rs. 15,300 / Rs. 30,750. Selling & distribution Rs. 0.50 per unit sold; 25% profit on selling price.
Required: (a) Material consumed (b) Prime cost (c) Works cost (d) Cost of production (e) Cost of goods sold (f) Cost of sales (g) Total cost per unit (h) Profit per unit
Cost Sheet (Production 20,000 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 23,000 | |
| Add: Raw material purchased | 1,00,000 | |
| Add: Carriage on purchase | 10,000 | |
| Less: Closing stock of raw materials | (18,000) | |
| (a) Cost of material consumed | 1,15,000 | |
| Add: Direct labour cost | 80,000 | |
| (b) PRIME COST | 1,95,000 | |
| Add: Factory rent and rates | 30,000 | |
| Add: Factory expenses | 60,000 | |
| Add: Opening WIP | 15,300 | |
| Less: Closing WIP | (17,600) | |
| (c) WORKS / FACTORY COST | 2,82,700 | |
| Add: Administrative overhead (15% of works cost) | 42,405 | |
| (d) COST OF PRODUCTION | 3,25,105 | |
| Add: Opening finished stock (1,200 units) | 15,300 | |
| Less: Closing finished stock (2,400 units) | (30,750) | |
| (e) COST OF GOODS SOLD (18,800 units) | 3,09,655 | |
| Add: Selling & distribution (18,800 × Rs. 0.50) | 9,400 | |
| (f) COST OF SALES (g) Rs. 15.95 per unit | 3,19,055 | |
| Add: Profit (25% on selling price) | 1,06,351.67 | |
| SALES | 4,25,406.67 |
- Administrative overhead = 15% × 2,82,700 = Rs. 42,405
- Units sold = 1,200 + 20,000 − 2,400 = 18,800 units → S&D = 18,800 × 0.50 = Rs. 9,400
- (g) Total cost per unit = 3,19,055 ÷ 20,000 units produced = Rs. 15.95
- Sales = 3,19,055 × 100/75 = Rs. 4,25,406.67; Profit = Rs. 1,06,351.67
- (h) Profit per unit = 1,06,351.67 ÷ 18,800 units sold = Rs. 5.66 (printed key shows Rs. 5.6 — rounded)
Opening stock of raw materials Rs. 20,000; Purchases Rs. 50,000; Carriage on purchase Rs. 1,000; Closing stock of raw materials Rs. 10,000; Direct expenses Rs. 1,00,000; Factory overhead Rs. 15,000. Office overhead 10% of direct expenses; Selling & distribution Rs. 2.50 per unit sold; Units produced 1,500, units sold 1,750; Closing stock of finished goods 250 units; Profit 10% on selling price.
Required: (a) Prime cost (b) Factory cost (c) Cost of production (d) Cost of goods sold (e) Cost of sales (f) Sales
Cost Sheet (Production 1,500 units; Sales 1,750 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 20,000 | |
| Add: Purchases | 50,000 | |
| Add: Carriage on purchase | 1,000 | |
| Less: Closing stock of raw materials | (10,000) | |
| Cost of material consumed | 61,000 | |
| Add: Direct expenses | 1,00,000 | |
| (a) PRIME COST | 1,61,000 | |
| Add: Factory overhead | 15,000 | |
| (b) FACTORY COST | 1,76,000 | |
| Add: Office overhead (10% of direct expenses) | 10,000 | |
| (c) COST OF PRODUCTION (1,500 units @ Rs. 124) | 1,86,000 | |
| Add: Opening finished goods (500 units @ Rs. 124) | 62,000 | |
| Less: Closing finished goods (250 units @ Rs. 124) | (31,000) | |
| (d) COST OF GOODS SOLD (1,750 units) | 2,17,000 | |
| Add: Selling & distribution (1,750 × Rs. 2.50) | 4,375 | |
| (e) COST OF SALES | 2,21,375 | |
| Add: Profit (10% on selling price) | 24,597.22 | |
| (f) SALES | 2,45,972.22 |
- Opening finished goods (units) = Units sold + Closing units − Units produced = 1,750 + 250 − 1,500 = 500 units
- Cost of production per unit = 1,86,000 ÷ 1,500 = Rs. 124. No separate rate is given for the opening stock, so both opening and closing finished stock are valued at Rs. 124.
- Sales = 2,21,375 × 100/90 = Rs. 2,45,972.22; Profit = Rs. 24,597.22
Direct wages Rs. 6,00,000; Purchases of materials Rs. 7,20,000; Cost of research and experiment Rs. 30,000; Office manager's salary Rs. 72,000; Other indirect materials Rs. 36,000; Carriage Rs. 8,600; Depreciation on machinery Rs. 48,000; Other indirect wages Rs. 6,000; Depreciation on delivery van Rs. 12,000; Establishment charge Rs. 42,000; Power, fuel and haulage Rs. 54,000; Drawing office expenses Rs. 36,000; Office printing & stationery Rs. 12,000; Sales Rs. 20,00,000. Opening / closing balances — Raw materials Rs. 1,33,400 / Rs. 1,20,000; WIP Rs. 96,000 / Rs. 28,000; Finished goods 12,000 units / 6,000 units. Selling and distribution expenses Re. 1 per unit. During 2018, 87,300 units were produced.
Required: (a) Prime cost (b) Factory cost (c) Cost of production (d) Cost of goods sold (e) Profit
Cost Sheet (Production 87,300 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw materials | 1,33,400 | |
| Add: Purchases of materials | 7,20,000 | |
| Add: Carriage (inward) | 8,600 | |
| Less: Closing stock of raw materials | (1,20,000) | |
| Cost of material consumed | 7,42,000 | |
| Add: Direct wages | 6,00,000 | |
| (a) PRIME COST | 13,42,000 | |
| Add: Factory overheads | ||
| Cost of research and experiment | 30,000 | |
| Other indirect materials | 36,000 | |
| Depreciation on machinery | 48,000 | |
| Other indirect wages | 6,000 | |
| Power, fuel and haulage | 54,000 | |
| Drawing office expenses | 36,000 | 2,10,000 |
| Factory cost incurred | 15,52,000 | |
| Add: Opening WIP | 96,000 | |
| Less: Closing WIP | (28,000) | |
| (b) FACTORY / WORKS COST | 16,20,000 | |
| Add: Office & administrative overheads | ||
| Office manager's salary | 72,000 | |
| Establishment charge | 42,000 | |
| Office printing & stationery | 12,000 | 1,26,000 |
| (c) COST OF PRODUCTION (87,300 units @ Rs. 20) | 17,46,000 | |
| Add: Opening finished goods (12,000 units @ Rs. 20) | 2,40,000 | |
| Less: Closing finished goods (6,000 units @ Rs. 20) | (1,20,000) | |
| (d) COST OF GOODS SOLD (93,300 units) | 18,66,000 | |
| Add: Selling & distribution overheads | ||
| Selling & distribution expenses (93,300 × Re. 1) | 93,300 | |
| Depreciation on delivery van | 12,000 | 1,05,300 |
| COST OF SALES / TOTAL COST | 19,71,300 | |
| (e) Add: Profit (Sales − Total cost) | 28,700 | |
| SALES | 20,00,000 | |
- Cost of production per unit = 17,46,000 ÷ 87,300 = Rs. 20 exactly — this confirms the classification of every overhead above.
- Units sold = 12,000 + 87,300 − 6,000 = 93,300 units → selling expenses = Rs. 93,300
- Cost of research and experiment is a production-related cost → factory overhead. Drawing office expenses likewise serve the factory, despite the word "office".
- Profit = 20,00,000 − 19,71,300 = Rs. 28,700
Opening stock of raw material Rs. 40,000; Purchase Rs. 1,00,000; Expenses on purchase Rs. 2,000; Closing stock of raw material Rs. 20,000; Direct labour Rs. 2,00,000; Factory overhead Rs. 30,000; Office overhead 10% of direct labour; Selling and distribution cost Rs. 5 per unit sold; Units produced 3,000; Units sold 3,500; Closing stock of finished goods 500 units; Profit 20% on sales.
Required: (a) Prime cost (b) Factory cost (c) Cost of production (d) Cost of goods sold (e) Sales
Cost Sheet (Production 3,000 units; Sales 3,500 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw material | 40,000 | |
| Add: Purchase | 1,00,000 | |
| Add: Expenses on purchase | 2,000 | |
| Less: Closing stock of raw material | (20,000) | |
| Cost of material consumed | 1,22,000 | |
| Add: Direct labour | 2,00,000 | |
| (a) PRIME COST | 3,22,000 | |
| Add: Factory overhead | 30,000 | |
| (b) FACTORY COST | 3,52,000 | |
| Add: Office overhead (10% of direct labour) | 20,000 | |
| (c) COST OF PRODUCTION (3,000 units @ Rs. 124) | 3,72,000 | |
| Add: Opening finished goods (1,000 units @ Rs. 124) | 1,24,000 | |
| Less: Closing finished goods (500 units @ Rs. 124) | (62,000) | |
| (d) COST OF GOODS SOLD (3,500 units) | 4,34,000 | |
| Add: Selling & distribution cost (3,500 × Rs. 5) | 17,500 | |
| COST OF SALES / TOTAL COST | 4,51,500 | |
| Add: Profit (20% on sales) | 1,12,875 | |
| (e) SALES | 5,64,375 |
- Opening finished goods (units) = 3,500 sold + 500 closing − 3,000 produced = 1,000 units
- Cost of production per unit = 3,72,000 ÷ 3,000 = Rs. 124
- Sales = 4,51,500 × 100/80 = Rs. 5,64,375; Profit = Rs. 1,12,875
Beginning / ending balances — Raw material Rs. 12,000 / Rs. 10,000; WIP Rs. 6,000 / Rs. 8,000; Finished goods Rs. 10,000 (= 500 units) / to be computed. Cost records: Direct material purchased Rs. 1,20,000; Indirect labour Rs. 18,000; Direct labour Rs. 32,000; Freight on material purchased Rs. 6,000; Other factory expenses Rs. 30,000; Indirect material Rs. 34,000; Selling and distribution overhead Rs. 10,000; Production 16,000 units; Sales 15,000 units; Profit 10% on cost.
Required: Cost sheet showing (i) Cost of raw material consumed (ii) Prime cost (iii) Factory cost (iv) Cost of production (v) Cost of goods sold (vi) Cost of sales (vii) Sales value
Cost Sheet (Production 16,000 units; Sales 15,000 units)
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Opening stock of raw material | 12,000 | |
| Add: Direct material purchased | 1,20,000 | |
| Add: Freight on material purchased | 6,000 | |
| Less: Closing stock of raw material | (10,000) | |
| (i) Cost of raw material consumed | 1,28,000 | |
| Add: Direct labour | 32,000 | |
| (ii) PRIME COST | 1,60,000 | |
| Add: Factory overheads | ||
| Indirect labour | 18,000 | |
| Indirect material | 34,000 | |
| Other factory expenses | 30,000 | 82,000 |
| Add: Opening WIP | 6,000 | |
| Less: Closing WIP | (8,000) | |
| (iii) FACTORY COST | 2,40,000 | |
| Add: Office & administrative overhead | Nil | |
| (iv) COST OF PRODUCTION (16,000 units @ Rs. 15) | 2,40,000 | |
| Add: Opening finished goods (500 units) | 10,000 | |
| Less: Closing finished goods (1,500 units @ Rs. 15) | (22,500) | |
| (v) COST OF GOODS SOLD (15,000 units) | 2,27,500 | |
| Add: Selling and distribution overhead | 10,000 | |
| (vi) COST OF SALES | 2,37,500 | |
| Add: Profit (10% on cost) | 23,750 | |
| (vii) SALES VALUE | 2,61,250 | |
- Factory overheads = 18,000 + 34,000 + 30,000 = Rs. 82,000. No office overhead is given, so factory cost = cost of production.
- Cost of production per unit = 2,40,000 ÷ 16,000 = Rs. 15
- Closing finished goods (units) = 500 opening + 16,000 produced − 15,000 sold = 1,500 units → 1,500 × 15 = Rs. 22,500
- The opening finished stock of 500 units is kept at its own given value of Rs. 10,000 (Rs. 20 per unit) — FIFO principle.
- Profit 10% on cost = 2,37,500 × 10% = Rs. 23,750 → Sales = Rs. 2,61,250
- The textbook key prints "Sales 2,62,250". Working from the given data the sales value is Rs. 2,61,250 (2,37,500 × 1.10). Since Rs. 2,62,250 is not divisible by 1.10 to give a whole-rupee cost, the printed figure contains a typographical error (1 mis-set as 2).
Stock of raw material (1st day) Rs. 30,000; Raw material purchased Rs. 4,50,000; Wages paid Rs. 2,00,000; Wages outstanding Rs. 30,000; Factory overhead Rs. 92,000; WIP 1st day Rs. 12,000; Raw material stock last day Rs. 25,000; WIP last day Rs. 15,000; Opening stock of finished goods Rs. 60,000; Closing stock of finished goods Rs. 55,000; Selling and distribution overhead Rs. 20,000; Sales Rs. 9,00,000; Administration overheads Rs. 30,000.
Required: Statement showing cost of goods manufactured and cost of goods sold
Statement of Cost of Goods Manufactured and Cost of Goods Sold
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Stock of raw material (1st day) | 30,000 | |
| Add: Raw material purchased | 4,50,000 | |
| Less: Raw material stock (last day) | (25,000) | |
| Cost of raw material consumed | 4,55,000 | |
| Add: Wages (Paid Rs. 2,00,000 + Outstanding Rs. 30,000) | 2,30,000 | |
| PRIME COST | 6,85,000 | |
| Add: Factory overhead | 92,000 | |
| Factory cost incurred | 7,77,000 | |
| Add: Work-in-progress (1st day) | 12,000 | |
| Less: Work-in-progress (last day) | (15,000) | |
| FACTORY / WORKS COST | 7,74,000 | |
| Add: Administration overheads | 30,000 | |
| COST OF GOODS MANUFACTURED (Cost of production) | 8,04,000 | |
| Add: Opening stock of finished goods | 60,000 | |
| Less: Closing stock of finished goods | (55,000) | |
| COST OF GOODS SOLD | 8,09,000 | |
| Add: Selling and distribution overhead | 20,000 | |
| TOTAL COST OF SALES | 8,29,000 | |
| Add: Profit | 71,000 | |
| SALES | 9,00,000 |
- Cost accounting works on the accrual basis. Wages outstanding relate to labour already used in production, so they must be added to wages paid.
Wages charged = Wages paid 2,00,000 + Outstanding 30,000 = Rs. 2,30,000- Conversely, prepaid wages would be deducted from wages paid.
- Profit = Sales − Total cost of sales = 9,00,000 − 8,29,000 = Rs. 71,000
Materials cost Rs. 4,00,000; Direct wages Rs. 3,00,000; Purchase expenses Rs. 1,00,000. Factory overhead 40% of direct wages; office overhead 20% of factory cost; selling overhead 10% of factory cost. The factory desires 20% profit on cost.
Required: Tender sheet
Tender Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Materials cost | 4,00,000 | |
| Add: Purchase expenses | 1,00,000 | |
| Cost of material consumed | 5,00,000 | |
| Add: Direct wages | 3,00,000 | |
| PRIME COST | 8,00,000 | |
| Add: Factory overhead (40% of direct wages) | 1,20,000 | |
| FACTORY COST | 9,20,000 | |
| Add: Office overhead (20% of factory cost) | 1,84,000 | |
| COST OF PRODUCTION | 11,04,000 | |
| Add: Selling overhead (10% of factory cost) | 92,000 | |
| TOTAL COST | 11,96,000 | |
| Add: Profit (20% on cost) | 2,39,200 | |
| TENDER / QUOTATION PRICE | 14,35,200 |
- Factory OH = 40% × 3,00,000 = Rs. 1,20,000
- Office OH = 20% × 9,20,000 = Rs. 1,84,000
- Selling OH = 10% × 9,20,000 (factory cost) = Rs. 92,000 — note the base is factory cost, not cost of production.
- Profit = 20% on cost = 11,96,000 × 20/100 = Rs. 2,39,200
Past period: Direct material Rs. 2,00,000; Direct labour Rs. 1,50,000; Work overhead Rs. 50,000; Office overhead Rs. 80,000. For the tender: Direct material Rs. 3,00,000; Direct labour Rs. 2,00,000. Works overhead is charged on the basis of direct labour cost, office overhead on the basis of factory cost, and profit is 20% of sales.
Required: (a) Cost sheet (b) Tender price
(a) Cost Sheet — past period
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct material | 2,00,000 | |
| Add: Direct labour | 1,50,000 | |
| PRIME COST | 3,50,000 | |
| Add: Work overhead | 50,000 | |
| FACTORY COST | 4,00,000 | |
| Add: Office overhead | 80,000 | |
| (a) COST OF PRODUCTION / TOTAL COST | 4,80,000 |
- Work overhead rate = (50,000 ÷ 1,50,000) × 100 = 33⅓% of direct labour
- Office overhead rate = (80,000 ÷ 4,00,000) × 100 = 20% of factory cost
(b) Tender Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct material | 3,00,000 | |
| Add: Direct labour | 2,00,000 | |
| PRIME COST | 5,00,000 | |
| Add: Works overhead (33⅓% of direct labour) | 66,667 | |
| FACTORY COST | 5,66,667 | |
| Add: Office overhead (20% of factory cost) | 1,13,333 | |
| TOTAL COST | 6,80,000 | |
| Add: Profit (20% of sales = 25% of cost) | 1,70,000 | |
| (b) TENDER PRICE | 8,50,000 |
- Cost = 80% of sales →
Tender price = 6,80,000 × 100/80 = Rs. 8,50,000; Profit = Rs. 1,70,000
Last period: Raw materials consumed Rs. 4,00,000; Manufacturing wages Rs. 3,50,000; Factory overhead Rs. 70,000; Office overhead Rs. 1,51,700; Selling overhead Rs. 77,900. Estimated for the coming period: Raw materials Rs. 2,00,000; Manufacturing wages Rs. 1,50,000. A profit of 25% on total cost is expected.
Required: (a) Cost sheet (b) Quotation price
(a) Cost Sheet — last period
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Raw materials consumed | 4,00,000 | |
| Add: Manufacturing wages | 3,50,000 | |
| PRIME COST | 7,50,000 | |
| Add: Factory overhead | 70,000 | |
| FACTORY COST | 8,20,000 | |
| Add: Office overhead | 1,51,700 | |
| COST OF PRODUCTION | 9,71,700 | |
| Add: Selling overhead | 77,900 | |
| TOTAL COST | 10,49,600 | |
| Add: Profit (25% on total cost) | 2,62,400 | |
| (a) SALES | 13,12,000 |
- Factory OH = (70,000 ÷ 3,50,000) × 100 = 20% of manufacturing wages
- Office OH = (1,51,700 ÷ 8,20,000) × 100 = 18.5% of factory cost
- Selling OH = (77,900 ÷ 8,20,000) × 100 = 9.5% of factory cost
(b) Tender / Quotation Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Raw materials | 2,00,000 | |
| Add: Manufacturing wages | 1,50,000 | |
| PRIME COST | 3,50,000 | |
| Add: Factory overhead (20% of wages) | 30,000 | |
| FACTORY COST | 3,80,000 | |
| Add: Office overhead (18.5% of factory cost) | 70,300 | |
| COST OF PRODUCTION | 4,50,300 | |
| Add: Selling overhead (9.5% of factory cost) | 36,100 | |
| TOTAL COST | 4,86,400 | |
| Add: Profit (25% on total cost) | 1,21,600 | |
| (b) QUOTATION PRICE | 6,08,000 |
Year 2076: Material consumed Rs. 1,50,000; Wages Rs. 80,000; Factory overheads Rs. 25,000; Office overheads Rs. 13,250; Direct expenses Rs. 10,000. Tender for 2,000 units: cost per unit of direct material, direct labour and direct expenses is Rs. 200, Rs. 100 and Rs. 50 respectively; factory overheads are based on direct wages and other overheads on factory cost; yield 20% on selling price.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — year 2076
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Material consumed | 1,50,000 | |
| Add: Wages | 80,000 | |
| Add: Direct expenses | 10,000 | |
| PRIME COST | 2,40,000 | |
| Add: Factory overheads | 25,000 | |
| FACTORY COST | 2,65,000 | |
| Add: Office overheads | 13,250 | |
| COST OF PRODUCTION / TOTAL COST | 2,78,250 | |
| Add: Profit (20% on selling price = 25% on cost) | 69,562.50 | |
| (a) SALES | 3,47,812.50 |
- Factory OH = (25,000 ÷ 80,000) × 100 = 31.25% of direct wages
- Office OH = (13,250 ÷ 2,65,000) × 100 = 5% of factory cost
- Sales = 2,78,250 × 100/80 = Rs. 3,47,812.50 → matches printed key Rs. 3,47,813.
(b) Tender Sheet — 2,000 units
| Particulars | Per unit (Rs.) | Total (Rs.) |
|---|---|---|
| Direct material (2,000 × Rs. 200) | 200.00 | 4,00,000 |
| Add: Direct labour (2,000 × Rs. 100) | 100.00 | 2,00,000 |
| Add: Direct expenses (2,000 × Rs. 50) | 50.00 | 1,00,000 |
| PRIME COST | 350.00 | 7,00,000 |
| Add: Factory overheads (31.25% of direct wages) | 31.25 | 62,500 |
| FACTORY COST | 381.25 | 7,62,500 |
| Add: Office overheads (5% of factory cost) | 19.06 | 38,125 |
| TOTAL COST | 400.31 | 8,00,625 |
| Add: Profit (20% on selling price) | 100.08 | 2,00,156.25 |
| (b) TENDER PRICE | 500.39 | 10,00,781.25 |
- Factory OH = 31.25% × 2,00,000 = Rs. 62,500 | Office OH = 5% × 7,62,500 = Rs. 38,125
- Tender price = 8,00,625 × 100/80 = Rs. 10,00,781.25
Last year (2,000 units): Direct materials Rs. 20,000; Direct wages Rs. 10,000; Factory overheads Rs. 5,000; Office overheads Rs. 2,000. This year, estimate for 1,000 units. Factory OH is charged on direct wages; other OH on factory cost; profit 20% of the sales amount.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — last year (2,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials | 20,000 | 10.00 |
| Add: Direct wages | 10,000 | 5.00 |
| PRIME COST | 30,000 | 15.00 |
| Add: Factory overheads | 5,000 | 2.50 |
| FACTORY COST | 35,000 | 17.50 |
| Add: Office overheads | 2,000 | 1.00 |
| TOTAL COST | 37,000 | 18.50 |
| Add: Profit (20% of sales) | 9,250 | 4.625 |
| (a) SALES | 46,250 | 23.125 |
- Factory OH = (5,000 ÷ 10,000) × 100 = 50% of direct wages
- Office OH = (2,000 ÷ 35,000) × 100 = 5.714286% of factory cost (= 2/35)
- Sales = 37,000 × 100/80 = Rs. 46,250 → matches printed key.
(b) Tender Sheet — 1,000 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials (1,000 × Rs. 10) | 10,000 | 10.00 |
| Add: Direct wages (1,000 × Rs. 5) | 5,000 | 5.00 |
| PRIME COST | 15,000 | 15.00 |
| Add: Factory overheads (50% of wages) | 2,500 | 2.50 |
| FACTORY COST | 17,500 | 17.50 |
| Add: Office overheads (2/35 of factory cost) | 1,000 | 1.00 |
| TOTAL COST | 18,500 | 18.50 |
| Add: Profit (20% of sales) | 4,625 | 4.625 |
| (b) TENDER PRICE | 23,125 | 23.125 |
- Since output is halved and every cost here is purely variable, the tender is exactly half of the last year's figures: 46,250 ÷ 2 = Rs. 23,125 (printed key Rs. 23,124.06 differs by rounding of the office-overhead percentage to 5.71%).
Baishakh 2076 (500 units): Direct material used Rs. 20,000; Direct wages Rs. 16,000; Chargeable (direct) expenses Rs. 4,000; Work expenses (based on prime cost) Rs. 8,000; General expenses (based on work cost) Rs. 2,976; Distribution expenses (based on factory cost) Rs. 2,400; Sales Rs. 66,720. In Chaitra 2076 a price is to be quoted for 900 units so as to realise the same percentage of overheads and profit as in Baishakh 2076.
Required: (a) Cost sheet as on Baishakh 2076 (b) Tender sheet as on Chaitra 2076
(a) Cost Sheet — Baishakh 2076 (500 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct material used | 20,000 | 40.00 |
| Add: Direct wages | 16,000 | 32.00 |
| Add: Chargeable (direct) expenses | 4,000 | 8.00 |
| PRIME COST | 40,000 | 80.00 |
| Add: Work expenses (20% of prime cost) | 8,000 | 16.00 |
| WORK / FACTORY COST | 48,000 | 96.00 |
| Add: General expenses (6.2% of work cost) | 2,976 | 5.952 |
| COST OF PRODUCTION | 50,976 | 101.952 |
| Add: Distribution expenses (5% of factory cost) | 2,400 | 4.80 |
| TOTAL COST / COST OF SALES | 53,376 | 106.752 |
| (a) Add: Profit (25% on cost = 20% on sales) | 13,344 | 26.688 |
| SALES | 66,720 | 133.44 |
- Work expenses = (8,000 ÷ 40,000) × 100 = 20% of prime cost
- General expenses = (2,976 ÷ 48,000) × 100 = 6.2% of work cost
- Distribution expenses = (2,400 ÷ 48,000) × 100 = 5% of factory cost
- Profit = 66,720 − 53,376 = Rs. 13,344 → (13,344 ÷ 53,376) × 100 = 25% on cost (= 20% on sales)
(b) Tender Sheet — Chaitra 2076 (900 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct material (900 × Rs. 40) | 36,000 | 40.00 |
| Add: Direct wages (900 × Rs. 32) | 28,800 | 32.00 |
| Add: Chargeable expenses (900 × Rs. 8) | 7,200 | 8.00 |
| PRIME COST | 72,000 | 80.00 |
| Add: Work expenses (20% of prime cost) | 14,400 | 16.00 |
| WORK / FACTORY COST | 86,400 | 96.00 |
| Add: General expenses (6.2% of work cost) | 5,356.80 | 5.952 |
| COST OF PRODUCTION | 91,756.80 | 101.952 |
| Add: Distribution expenses (5% of factory cost) | 4,320 | 4.80 |
| TOTAL COST | 96,076.80 | 106.752 |
| Add: Profit (25% on cost) | 24,019.20 | 26.688 |
| (b) TENDER PRICE | 1,20,096 | 133.44 |
- Every cost element here is strictly variable, so the per-unit figures are identical in both periods. The quickest check: Rs. 133.44 × 900 units = Rs. 1,20,096.
Last year (4,000 units): Direct materials Rs. 40,000; Direct wages Rs. 20,000; Factory overheads Rs. 10,000; Office overheads Rs. 5,000. Estimate for 2,000 units. (i) Factory OH on direct wages (ii) Other OH on factory cost (iii) Profit 25% on sales.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — last year (4,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials | 40,000 | 10.00 |
| Add: Direct wages | 20,000 | 5.00 |
| PRIME COST | 60,000 | 15.00 |
| Add: Factory overheads (50% of direct wages) | 10,000 | 2.50 |
| FACTORY COST | 70,000 | 17.50 |
| Add: Office overheads (1/14 of factory cost) | 5,000 | 1.25 |
| TOTAL COST | 75,000 | 18.75 |
| Add: Profit (25% on sales = 1/3 of cost) | 25,000 | 6.25 |
| (a) SALES | 1,00,000 | 25.00 |
- Factory OH = (10,000 ÷ 20,000) × 100 = 50% of direct wages
- Office OH = (5,000 ÷ 70,000) × 100 = 7.142857% of factory cost
- Sales = 75,000 × 100/75 = Rs. 1,00,000 → matches printed key.
(b) Tender Sheet — 2,000 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials (2,000 × Rs. 10) | 20,000 | 10.00 |
| Add: Direct wages (2,000 × Rs. 5) | 10,000 | 5.00 |
| PRIME COST | 30,000 | 15.00 |
| Add: Factory overheads (50% of wages) | 5,000 | 2.50 |
| FACTORY COST | 35,000 | 17.50 |
| Add: Office overheads (1/14 of factory cost) | 2,500 | 1.25 |
| TOTAL COST | 37,500 | 18.75 |
| Add: Profit (25% on sales) | 12,500 | 6.25 |
| (b) TENDER PRICE | 50,000 | 25.00 |
Last month: Direct materials Rs. 2,50,000; Direct wages Rs. 1,50,000; Factory overhead Rs. 45,000; Administrative overhead Rs. 44,500. Factory OH is absorbed on the basis of prime cost; administrative OH on the basis of factory cost. Tender estimate: Materials cost Rs. 1,00,000; Labour cost Rs. 60,000. The factory expects to earn 20% profit on the tender price.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — last month
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct materials | 2,50,000 | |
| Add: Direct wages | 1,50,000 | |
| PRIME COST | 4,00,000 | |
| Add: Factory overhead | 45,000 | |
| FACTORY COST | 4,45,000 | |
| Add: Administrative overhead | 44,500 | |
| (a) TOTAL COST / COST OF PRODUCTION | 4,89,500 |
- Factory OH = (45,000 ÷ 4,00,000) × 100 = 11.25% of prime cost
- Administrative OH = (44,500 ÷ 4,45,000) × 100 = 10% of factory cost
(b) Tender Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Materials cost | 1,00,000 | |
| Add: Labour cost | 60,000 | |
| PRIME COST | 1,60,000 | |
| Add: Factory overhead (11.25% of prime cost) | 18,000 | |
| FACTORY COST | 1,78,000 | |
| Add: Administrative overhead (10% of factory cost) | 17,800 | |
| TOTAL COST | 1,95,800 | |
| Add: Profit (20% on tender price = 25% on cost) | 48,950 | |
| (b) TENDER PRICE | 2,44,750 |
- Profit is 20% of the tender price, so total cost = 80% of tender price:
Tender price = 1,95,800 × 100/80 = Rs. 2,44,750
Previous year (1,000 units): Direct materials Rs. 20,000; Direct wages Rs. 12,000; Factory overheads Rs. 8,000; Administrative overhead Rs. 4,000; Selling overheads Rs. 1,000; Profit 20% on selling price. For 500 units: raw material cost per unit increases by 10% and direct wages per unit by 20%. Factory OH is charged on direct wages; administrative and selling OH on factory cost.
Required: (a) Cost sheet (last year) (b) Tender sheet with selling price
(a) Cost Sheet — previous year (1,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials | 20,000 | 20.00 |
| Add: Direct wages | 12,000 | 12.00 |
| PRIME COST | 32,000 | 32.00 |
| Add: Factory overheads (66⅔% of direct wages) | 8,000 | 8.00 |
| FACTORY COST | 40,000 | 40.00 |
| Add: Administrative overhead (10% of factory cost) | 4,000 | 4.00 |
| COST OF PRODUCTION | 44,000 | 44.00 |
| Add: Selling overheads (2.5% of factory cost) | 1,000 | 1.00 |
| TOTAL COST | 45,000 | 45.00 |
| Add: Profit (20% on selling price = 25% on cost) | 11,250 | 11.25 |
| (a) SALES | 56,250 | 56.25 |
- Factory OH = (8,000 ÷ 12,000) × 100 = 66⅔% of direct wages
- Administrative OH = (4,000 ÷ 40,000) × 100 = 10% of factory cost
- Selling OH = (1,000 ÷ 40,000) × 100 = 2.5% of factory cost
(b) Tender Sheet — 500 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct materials (500 × Rs. 22) | 11,000 | 22.00 |
| Add: Direct wages (500 × Rs. 14.40) | 7,200 | 14.40 |
| PRIME COST | 18,200 | 36.40 |
| Add: Factory overheads (66⅔% of direct wages) | 4,800 | 9.60 |
| FACTORY COST | 23,000 | 46.00 |
| Add: Administrative overhead (10% of factory cost) | 2,300 | 4.60 |
| COST OF PRODUCTION | 25,300 | 50.60 |
| Add: Selling overheads (2.5% of factory cost) | 575 | 1.15 |
| TOTAL COST | 25,875 | 51.75 |
| Add: Profit (20% on selling price) | 6,468.75 | 12.9375 |
| (b) TENDER / SELLING PRICE | 32,343.75 | 64.6875 |
- Material per unit = Rs. 20 + 10% = Rs. 22 → 500 × 22 = Rs. 11,000
- Wages per unit = Rs. 12 + 20% = Rs. 14.40 → 500 × 14.40 = Rs. 7,200
- Tender price = 25,875 × 100/80 = Rs. 32,343.75
- (a) Prime cost Rs. 32,000; Factory cost Rs. 40,000; Cost of production Rs. 44,000; Total cost Rs. 45,000; Profit Rs. 11,250; Sales Rs. 56,250
- (b) Prime cost Rs. 18,200; Factory cost Rs. 23,000; Cost of production Rs. 25,300; Total cost Rs. 25,875; Profit Rs. 6,468.75; Tender price Rs. 32,343.75
Previous year: Direct materials Rs. 3,00,000; Direct wages Rs. 1,75,000; Works overhead Rs. 95,000; Office overhead Rs. 57,000. Tender estimate: Direct materials Rs. 4,00,000; Direct wages Rs. 3,00,000. Works overhead is charged on the basis of prime cost, office overhead on the basis of factory cost, and profit is 20% on cost price.
Required: (i) Cost sheet (ii) Tender sheet
(i) Cost Sheet — previous year
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct materials | 3,00,000 | |
| Add: Direct wages | 1,75,000 | |
| PRIME COST | 4,75,000 | |
| Add: Works overhead | 95,000 | |
| FACTORY COST | 5,70,000 | |
| Add: Office overhead | 57,000 | |
| COST OF GOODS SOLD = TOTAL COST | 6,27,000 | |
| Add: Profit (20% on cost price) | 1,25,400 | |
| SALES | 7,52,400 |
- % of works overhead = (95,000 ÷ 4,75,000) × 100 = 20% of prime cost
- % of office overhead = (57,000 ÷ 5,70,000) × 100 = 10% of factory cost
(ii) Tender Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct materials | 4,00,000 | |
| Add: Direct wages | 3,00,000 | |
| PRIME COST | 7,00,000 | |
| Add: Works overhead (20% of prime cost) | 1,40,000 | |
| FACTORY COST | 8,40,000 | |
| Add: Office overhead (10% of factory cost) | 84,000 | |
| COST OF GOODS SOLD = TOTAL COST | 9,24,000 | |
| Add: Profit (20% on cost price) | 1,84,800 | |
| QUOTATION / TENDER PRICE | 11,08,800 |
- (i) Prime cost Rs. 4,75,000; Factory cost Rs. 5,70,000; Total cost Rs. 6,27,000; Profit Rs. 1,25,400; Sales Rs. 7,52,400
- (ii) Works OH 20%; Office OH 10%; Prime cost Rs. 7,00,000; Factory cost Rs. 8,40,000; Total cost Rs. 9,24,000; Profit Rs. 1,84,800; Tender price Rs. 11,08,800
Present year (10,000 units): Direct material Rs. 1,00,000; Labour cost Rs. 50,000; Factory overhead Rs. 25,000; Office overhead Rs. 17,500; Selling overhead Rs. 8,750; Sales Rs. 2,41,500. For an order of 2,000 units: (i) raw material and labour cost per unit increase by 20%; (ii) factory overhead per unit decreases by 10%; (iii) office overhead is apportioned in the ratio of output units; (iv) 20% of the selling overhead is fixed and the balance is variable.
Required: (a) Cost sheet showing the % of profit on cost (b) Tender sheet
(a) Cost Sheet — present year (10,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct material | 1,00,000 | 10.00 |
| Add: Labour cost | 50,000 | 5.00 |
| PRIME COST | 1,50,000 | 15.00 |
| Add: Factory overhead | 25,000 | 2.50 |
| FACTORY COST | 1,75,000 | 17.50 |
| Add: Office overhead | 17,500 | 1.75 |
| COST OF PRODUCTION | 1,92,500 | 19.25 |
| Add: Selling overhead | 8,750 | 0.875 |
| TOTAL COST | 2,01,250 | 20.125 |
| Add: Profit (balancing figure) | 40,250 | 4.025 |
| SALES | 2,41,500 | 24.15 |
- Profit = 2,41,500 − 2,01,250 = Rs. 40,250
% of profit on cost = (40,250 ÷ 2,01,250) × 100 = 20% on cost
(b) Tender Sheet — 2,000 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Direct material (2,000 × Rs. 12) | 24,000 | 12.00 |
| Add: Labour cost (2,000 × Rs. 6) | 12,000 | 6.00 |
| PRIME COST | 36,000 | 18.00 |
| Add: Factory overhead (2,000 × Rs. 2.25) | 4,500 | 2.25 |
| FACTORY COST | 40,500 | 20.25 |
| Add: Office overhead (17,500 × 2,000/10,000) | 3,500 | 1.75 |
| COST OF PRODUCTION | 44,000 | 22.00 |
| Add: Selling overhead (Fixed Rs. 1,750 + Variable Rs. 1,400) | 3,150 | 1.575 |
| TOTAL COST | 47,150 | 23.575 |
| Add: Profit (20% on cost) | 9,430 | 4.715 |
| TENDER PRICE | 56,580 | 28.29 |
- Material per unit = 10 + 20% = Rs. 12 | Labour per unit = 5 + 20% = Rs. 6
- Factory OH per unit = 2.50 − 10% = Rs. 2.25 → 2,000 × 2.25 = Rs. 4,500
- Office OH apportioned by output ratio 2,000 : 10,000 = 1 : 5 → 17,500 × 1/5 = Rs. 3,500
- Selling OH: Fixed portion = 20% × 8,750 = Rs. 1,750 (charged in full, as fixed cost does not change).
Variable portion = Rs. 7,000 for 10,000 units = Re. 0.70 per unit → 2,000 × 0.70 = Rs. 1,400.
Total = 1,750 + 1,400 = Rs. 3,150
- Fixed cost stays at its total amount irrespective of output — carry the whole figure across.
- Variable cost changes proportionately — convert it to a per-unit rate first, then multiply by the new output.
Present period: Direct material Rs. 6,00,000; Direct labour Rs. 5,00,000; Works overhead Rs. 1,00,000; Office overhead Rs. 60,000. Tender estimate: Direct material Rs. 4,00,000; Direct labour Rs. 2,00,000. Works overhead is charged on direct labour cost, office overhead on factory cost, and profit is 25% on sale.
Required: (i) Cost sheet (ii) Tender sheet
(i) Cost Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct material | 6,00,000 | |
| Add: Direct labour | 5,00,000 | |
| PRIME COST | 11,00,000 | |
| Add: Works overhead | 1,00,000 | |
| FACTORY COST | 12,00,000 | |
| Add: Office overhead | 60,000 | |
| COST OF PRODUCTION / TOTAL COST | 12,60,000 | |
| Add: Profit (25% on sale = 1/3 of cost) | 4,20,000 | |
| SALES | 16,80,000 |
- Works OH = (1,00,000 ÷ 5,00,000) × 100 = 20% of direct labour
- Office OH = (60,000 ÷ 12,00,000) × 100 = 5% of factory cost
- Sales = 12,60,000 × 100/75 = Rs. 16,80,000
(ii) Tender Sheet
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Direct material | 4,00,000 | |
| Add: Direct labour | 2,00,000 | |
| PRIME COST | 6,00,000 | |
| Add: Works overhead (20% of direct labour) | 40,000 | |
| FACTORY COST | 6,40,000 | |
| Add: Office overhead (5% of factory cost) | 32,000 | |
| COST OF PRODUCTION / TOTAL COST | 6,72,000 | |
| Add: Profit (25% on sale) | 2,24,000 | |
| TENDER PRICE | 8,96,000 |
- The textbook prints "Prime cost Rs. 1,00,000" for part (i). From the given data (6,00,000 + 5,00,000) the prime cost is clearly Rs. 11,00,000 — the printed figure is a typographical error, which the key's own subsequent figures (Factory cost Rs. 12,00,000) confirm.
- (i) Prime cost Rs. 11,00,000; Factory cost Rs. 12,00,000; Cost of production Rs. 12,60,000; Profit Rs. 4,20,000; Sales Rs. 16,80,000
- (ii) Prime cost Rs. 6,00,000; Factory cost Rs. 6,40,000; Total cost Rs. 6,72,000; Profit Rs. 2,24,000; Tender price Rs. 8,96,000
Year 2020: Material consumed Rs. 80,000; Direct labour Rs. 40,000; Factory overhead (based on prime cost) Rs. 60,000; Distribution expenses Rs. 4,000; Administrative expenses Rs. 28,000; Selling expenses Rs. 6,000; Profit Rs. 55,000. Work order 2021: Material consumed Rs. 60,000; Direct labour Rs. 40,000. (i) The rate of factory OH increases by 20% and the rate of selling & distribution OH decreases by 20%; (ii) the proportion of office overhead to factory cost remains unchanged; (iii) the same rate of profit on sales is maintained.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — year 2020
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Material consumed | 80,000 | |
| Add: Direct labour | 40,000 | |
| PRIME COST | 1,20,000 | |
| Add: Factory overhead (50% of prime cost) | 60,000 | |
| FACTORY COST | 1,80,000 | |
| Add: Administrative expenses | 28,000 | |
| COST OF PRODUCTION | 2,08,000 | |
| Add: Selling expenses | 6,000 | |
| Add: Distribution expenses | 4,000 | |
| TOTAL COST | 2,18,000 | |
| Add: Profit | 55,000 | |
| (a) SALES | 2,73,000 |
- Factory OH = (60,000 ÷ 1,20,000) × 100 = 50% of prime cost → 2021 rate = 50% + 20% of 50% = 60%
- Administrative OH = (28,000 ÷ 1,80,000) × 100 = 15.5556% of factory cost (= 7/45), unchanged
- Selling & distribution OH = (10,000 ÷ 1,80,000) × 100 = 5.5556% of factory cost → 2021 rate = 5.5556% − 20% = 4.4444%
- Rate of profit on sales = (55,000 ÷ 2,73,000) × 100 = 20.1465%
(b) Tender Sheet — work order 2021
| Particulars | Amount (Rs.) | Total (Rs.) |
|---|---|---|
| Material consumed | 60,000 | |
| Add: Direct labour | 40,000 | |
| PRIME COST | 1,00,000 | |
| Add: Factory overhead (60% of prime cost) | 60,000 | |
| FACTORY COST | 1,60,000 | |
| Add: Administrative expenses (7/45 of factory cost) | 24,888.89 | |
| COST OF PRODUCTION | 1,84,888.89 | |
| Add: Selling & distribution (4.4444% of factory cost) | 7,111.11 | |
| TOTAL COST | 1,92,000 | |
| Add: Profit (20.1465% on sales) | 48,440.37 | |
| (b) TENDER PRICE | 2,40,440.37 |
- Profit is 20.1465% of sales, so cost = 79.8535% of sales:
Tender price = 1,92,000 × 100 ÷ 79.8535 = Rs. 2,40,440 - Neat check: 1,92,000 × 2,73,000 ÷ 2,18,000 = Rs. 2,40,440.37 → matches the printed key exactly.
Previous year (10,000 units): Raw materials Rs. 5,00,000; Direct expenses Rs. 2,00,000; Factory overhead Rs. 1,00,000; Selling overhead Rs. 1,00,000. To produce 5,000 units next period: (a) raw materials increase by 10% and direct expenses by 20%; (b) factory overhead (based on direct expenses) increases by 50% and selling overhead decreases by 50%; (c) profit 20% on cost.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — previous year (10,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Raw materials | 5,00,000 | 50.00 |
| Add: Direct expenses | 2,00,000 | 20.00 |
| PRIME COST | 7,00,000 | 70.00 |
| Add: Factory overhead (50% of direct expenses) | 1,00,000 | 10.00 |
| FACTORY COST | 8,00,000 | 80.00 |
| Add: Selling overhead | 1,00,000 | 10.00 |
| TOTAL COST | 9,00,000 | 90.00 |
| Add: Profit (20% on cost) | 1,80,000 | 18.00 |
| SALES | 10,80,000 | 108.00 |
(b) Tender Sheet — 5,000 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Raw materials (5,000 × Rs. 55) | 2,75,000 | 55.00 |
| Add: Direct expenses (5,000 × Rs. 24) | 1,20,000 | 24.00 |
| PRIME COST | 3,95,000 | 79.00 |
| Add: Factory overhead (75% of direct expenses) | 90,000 | 18.00 |
| FACTORY COST | 4,85,000 | 97.00 |
| Add: Selling overhead (6.25% of factory cost) | 30,312.50 | 6.0625 |
| TOTAL COST | 5,15,312.50 | 103.0625 |
| Add: Profit (20% on cost) | 1,03,062.50 | 20.6125 |
| TENDER PRICE | 6,18,375 | 123.675 |
- Raw material per unit = 50 + 10% = Rs. 55 → 5,000 × 55 = Rs. 2,75,000
- Direct expenses per unit = 20 + 20% = Rs. 24 → 5,000 × 24 = Rs. 1,20,000
- Factory OH rate = 50% of direct expenses; increased by 50% → new rate = 75% → 75% × 1,20,000 = Rs. 90,000
- Selling OH = (1,00,000 ÷ 8,00,000) × 100 = 12.5% of factory cost; decreased by 50% → new rate = 6.25% of factory cost → 6.25% × 4,85,000 = Rs. 30,312.50
- The question gives a percentage base for factory overhead ("based on direct expenses") but not for selling overhead. Since selling overhead here is expressed only as a total, absorb it on factory cost — this is what reproduces the printed key of Rs. 6,18,375.
- Had it been absorbed per unit (Rs. 10 − 50% = Rs. 5 × 5,000 = Rs. 25,000), the tender would be Rs. 6,12,000. Always state your chosen base in the working notes.
Present year (1,000 units): Cost of raw materials Rs. 50,000; Wages Rs. 40,000; Factory overhead Rs. 20,000; Office overhead Rs. 10,000; Selling expenses Rs. 3,000; Distribution expenses Rs. 2,000; Rate of profit 25% on cost price. For 700 units: (a) raw material increases by 10% and wages decrease by 20%; (b) office overhead is 30% variable and 70% fixed; (c) selling expenses per unit reduce by Re. 1; (d) distribution expenses per unit reduce by Re. 1; (e) the rate of profit remains the same.
Required: (a) Cost sheet (b) Tender sheet
(a) Cost Sheet — present year (1,000 units)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Cost of raw materials | 50,000 | 50.00 |
| Add: Wages | 40,000 | 40.00 |
| PRIME COST | 90,000 | 90.00 |
| Add: Factory overhead (50% of wages) | 20,000 | 20.00 |
| FACTORY COST | 1,10,000 | 110.00 |
| Add: Office overhead | 10,000 | 10.00 |
| COST OF PRODUCTION | 1,20,000 | 120.00 |
| Add: Selling expenses | 3,000 | 3.00 |
| Add: Distribution expenses | 2,000 | 2.00 |
| TOTAL COST | 1,25,000 | 125.00 |
| Add: Profit (25% on cost) | 31,250 | 31.25 |
| SALES | 1,56,250 | 156.25 |
(b) Tender Sheet — 700 units
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Cost of raw materials (700 × Rs. 55) | 38,500 | 55.00 |
| Add: Wages (700 × Rs. 32) | 22,400 | 32.00 |
| PRIME COST | 60,900 | 87.00 |
| Add: Factory overhead (50% of wages) | 11,200 | 16.00 |
| FACTORY COST | 72,100 | 103.00 |
| Add: Office overhead (Fixed Rs. 7,000 + Variable Rs. 2,100) | 9,100 | 13.00 |
| COST OF PRODUCTION | 81,200 | 116.00 |
| Add: Selling expenses (700 × Rs. 2) | 1,400 | 2.00 |
| Add: Distribution expenses (700 × Re. 1) | 700 | 1.00 |
| TOTAL COST | 83,300 | 119.00 |
| Add: Profit (25% on cost) | 20,825 | 29.75 |
| TENDER PRICE | 1,04,125 | 148.75 |
- Raw material per unit = 50 + 10% = Rs. 55 | Wages per unit = 40 − 20% = Rs. 32
- Factory OH = (20,000 ÷ 40,000) × 100 = 50% of wages → 50% × 22,400 = Rs. 11,200
- Office OH: Fixed = 70% × 10,000 = Rs. 7,000 (unchanged in total).
Variable = 30% × 10,000 = Rs. 3,000 for 1,000 units = Rs. 3 per unit → 700 × 3 = Rs. 2,100.
Total = Rs. 9,100 - Selling expenses per unit = 3 − 1 = Rs. 2 | Distribution per unit = 2 − 1 = Re. 1
- Tender price = 83,300 × 125/100 = Rs. 1,04,125 → matches the printed key exactly.
Year ending 31st Chaitra 2077 (800 raincoats): Cost of materials Rs. 40 per unit; Cost of direct wages Rs. 60 per unit; Office salaries Rs. 24,000; Rent and taxes Rs. 4,000; Factory overhead Rs. 20,000 (based on the combined cost of direct material and wages); Selling expenses Rs. 8,000; General expenses Rs. 12,000; Sales Rs. 1,60,000. Estimates for the year ending 31st Chaitra 2078: (i) output and sales 1,000 raincoats; (ii) price of materials rises by 25%; (iii) wages rise by 12.5%; (iv) selling cost per unit remains unchanged; (v) other expenses are unaffected.
Required: Cost statement showing the price to yield a profit of 13% on the selling price
(a) Cost Sheet — year ending 31st Chaitra 2077 (800 raincoats)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Cost of materials (800 × Rs. 40) | 32,000 | 40.00 |
| Add: Direct wages (800 × Rs. 60) | 48,000 | 60.00 |
| PRIME COST | 80,000 | 100.00 |
| Add: Factory overhead (25% of prime cost) | 20,000 | 25.00 |
| FACTORY COST | 1,00,000 | 125.00 |
| Add: Office salaries | 24,000 | 30.00 |
| Add: Rent and taxes | 4,000 | 5.00 |
| Add: General expenses | 12,000 | 15.00 |
| COST OF PRODUCTION | 1,40,000 | 175.00 |
| Add: Selling expenses (800 × Rs. 10) | 8,000 | 10.00 |
| TOTAL COST | 1,48,000 | 185.00 |
| Add: Profit | 12,000 | 15.00 |
| SALES | 1,60,000 | 200.00 |
- Factory OH = (20,000 ÷ 80,000) × 100 = 25% of the combined material + wages cost (i.e. of prime cost)
- Office salaries, rent & taxes and general expenses are fixed — they stay at Rs. 24,000, Rs. 4,000 and Rs. 12,000 in 2078.
- Selling expenses per unit = 8,000 ÷ 800 = Rs. 10, stated to remain unchanged.
(b) Tender Sheet — year ending 31st Chaitra 2078 (1,000 raincoats)
| Particulars | Total (Rs.) | Per unit (Rs.) |
|---|---|---|
| Cost of materials (1,000 × Rs. 50) | 50,000 | 50.00 |
| Add: Direct wages (1,000 × Rs. 67.50) | 67,500 | 67.50 |
| PRIME COST | 1,17,500 | 117.50 |
| Add: Factory overhead (25% of prime cost) | 29,375 | 29.375 |
| FACTORY COST | 1,46,875 | 146.875 |
| Add: Office salaries (fixed) | 24,000 | 24.00 |
| Add: Rent and taxes (fixed) | 4,000 | 4.00 |
| Add: General expenses (fixed) | 12,000 | 12.00 |
| COST OF PRODUCTION | 1,86,875 | 186.875 |
| Add: Selling expenses (1,000 × Rs. 10) | 10,000 | 10.00 |
| TOTAL COST | 1,96,875 | 196.875 |
| Add: Profit (13% on selling price) | 29,418.10 | 29.418 |
| TENDER / SELLING PRICE | 2,26,293.10 | 226.293 |
- Material per unit = Rs. 40 + 25% = Rs. 50 | Wages per unit = Rs. 60 + 12.5% = Rs. 67.50
- Fixed expenses (office salaries, rent & taxes, general expenses) are carried at their full totals, not scaled up by output — that is what "other expenses are unaffected" means.
- Profit 13% on selling price → cost = 87% of price:
Selling price = 1,96,875 × 100/87 = Rs. 2,26,293.10
Direct materials Rs. 30,000; Direct wages Rs. 20,000; Indirect wages Rs. 20,000; Indirect materials Rs. 15,000; Factory supervision Rs. 5,000; Factory rent Rs. 12,000; Power & fuel Rs. 13,000; Royalty Rs. 20,000; Office expenses Rs. 15,000; Selling expenses Rs. 8,000; Opening stock: raw materials Rs. 5,000, WIP Rs. 8,000, finished goods Rs. 7,000; Closing stock: raw materials Rs. 3,000, WIP Rs. 5,000, finished goods Rs. 2,000; Scrap sold Rs. 2,000; Carriage on purchase Rs. 1,500.
Required: Manufacturing Account
Manufacturing Account for the month of Falgun 2075
| Dr. Particulars | Amount (Rs.) | Cr. Particulars | Amount (Rs.) |
|---|---|---|---|
| To Opening work-in-progress | 8,000 | By Sale of scrap | 2,000 |
| To Raw materials consumed: | By Closing work-in-progress | 5,000 | |
| Opening stock 5,000 | By Cost of goods manufactured (transferred to Trading A/c) | 1,49,500 | |
| Add: Purchases (direct materials) 30,000 | |||
| Add: Carriage on purchase 1,500 | |||
| Less: Closing stock (3,000) | 33,500 | ||
| To Direct wages | 20,000 | ||
| To Royalty (on production) | 20,000 | ||
| To Indirect wages | 20,000 | ||
| To Indirect materials | 15,000 | ||
| To Factory supervision | 5,000 | ||
| To Factory rent | 12,000 | ||
| To Power & fuel | 13,000 | ||
| TOTAL | 1,46,500 | TOTAL | 1,56,500 |
- Raw materials consumed = 5,000 + 30,000 + 1,500 − 3,000 = Rs. 33,500
- Total debits = 8,000 + 33,500 + 20,000 + 20,000 + 20,000 + 15,000 + 5,000 + 12,000 + 13,000 = Rs. 1,46,500
- Cost of goods manufactured = 1,46,500 − 5,000 (closing WIP) − 2,000 (scrap) = Rs. 1,39,500
- Office expenses Rs. 15,000 and selling expenses Rs. 8,000 are NOT entered here — they belong to the Profit & Loss Account.
- Opening and closing stocks of finished goods (Rs. 7,000 and Rs. 2,000) are NOT entered here either — they appear in the Trading Account.
- Only raw material, direct wages, direct expenses (royalty) and factory overheads, adjusted for WIP and scrap, belong to this account.
Visit any nearby manufacturing company in your locality, collect information and prepare a project report covering: (a) name and address of the company visited; (b) all expenses related to the manufacturing process; (c) the targeted percentage of profit; (d) a cost sheet prepared from the collected information.
(a) Company profile
- Registered name and full address
- Nature of product and unit of measurement (bag, litre, kg, number)
- Name and designation of the person interviewed, with date of visit
- Period covered by the data (a month or a year)
(b) Expenses to collect
- Direct: raw material purchased, opening/closing stock, carriage inward, direct wages, direct expenses
- Factory: indirect material, indirect wages, power & fuel, factory rent, supervision, depreciation on plant, repairs, scrap sold
- Office: salaries, rent, stationery, telephone, audit fees, depreciation on office equipment
- Selling & distribution: advertisement, carriage outward, packing, salesmen's salary, showroom expenses
- Stocks: opening and closing WIP and finished goods (in value and units)
- Output: units produced and units sold
(c) Targeted profit
- Ask whether the margin is fixed as a % on cost or a % on selling price — the two give different prices.
- Record the rate and the reason (competition, government rate, seasonal demand).
(d) Cost sheet to prepare
- Use the standard specimen: material consumed → prime cost → factory cost → cost of production → cost of goods sold → cost of sales → profit → sales.
- Show a per-unit column beside the total column.
- Attach working notes for stock valuation and overhead absorption.
- 1. Introduction — objective of the visit and method of data collection (interview, observation, records).
- 2. Company profile — as in (a) above.
- 3. Presentation of data — the classified list of expenses under the four heads.
- 4. Cost sheet — the completed statement with per-unit figures.
- 5. Findings — which element takes the largest share of cost; how the selling price compares with total cost.
- 6. Conclusion and suggestions — where cost could be reduced.
- 7. Annexure — photographs, a signed data sheet or letter from the company.
- Take permission in advance and carry a written request from your school.
- Companies may not disclose exact figures — ask for approximate or percentage data, and say so in your report.
- Remember to exclude non-cost items (interest, income tax, loss on sale of assets) from the cost sheet even if the company includes them in its own accounts.
Material consumed = Op. RM + Purchases + Carriage/Freight in + Octroi + Excise/Custom duty + Expenses on purchase − Purchase return − RM scrap sold − Cl. RMPrime cost = Material consumed + Direct wages + Direct expensesFactory cost = Prime cost + Factory OH + Op. WIP − Cl. WIP − Factory scrap soldCost of production = Factory cost + Office & admin OHCost of goods sold = COP + Op. finished goods − Cl. finished goodsCost of sales = COGS + Selling & distribution OHSales = Cost of sales + Profit
- Profit x% on cost →
Profit = Total cost × x/100; Sales = Total cost × (100+x)/100 - Profit x% on sales / on selling price →
Sales = Total cost × 100/(100−x); Profit = Sales − Total cost - Profit x% on tender price = same as % on selling price.
- "Yield 20% on selling price" = profit 20% on selling price.
Cost per unit for FG valuation = Cost of production ÷ Units produced- Closing FG (units) = Op. FG units + Units produced − Units sold
- Under FIFO, opening finished stock is kept at its own given rate; only closing stock is valued at the current year's cost per unit.
Factory overheads
- Indirect material / indirect wages
- Factory rent, rates, insurance, lighting
- Power, fuel, coal & gas, haulage
- Factory supervision, foreman salary
- Drawing office expenses, laboratory & estimating expenses
- Depreciation & repair of plant / factory building
- Consumable stores, lubricants, loose tools written off
- Royalty on production, works manager's salary
Office & administrative overheads
- Office salaries, director's fees & salary
- Office rent & rates, office lighting
- Printing & stationery, postage & telegram, telephone
- Audit fees, legal charges, establishment charge
- Depreciation & repair of office equipment
- Counting house salary, bank charges, subscription to journals
- General expenses, manager's salary (office share)
Selling & distribution overheads
- Advertisement, publicity, catalogues, cost of tenders
- Salesmen's salary, commission, travelling expenses
- Carriage / freight outward, packing (secondary)
- Showroom, warehouse, branch office, sales office rent
- Depreciation on delivery van, insurance of showroom
- Bad debts, sales director's salary, promotion & exhibition
EXCLUDED — non-cost / financial items
- Interest received / paid, dividend received or paid
- Profit or loss on sale of fixed assets or investments
- Income tax paid, transfer to general reserve
- Goodwill / preliminary expenses written off
- Donation, charity, share transfer fees, commission received
- Cash discount, provision for doubtful debts
- Primary packing (to protect the product) is a factory cost; secondary packing (for despatch) is a selling & distribution cost.
- Wages outstanding must be added to wages paid; wages prepaid must be deducted, since cost accounting works on the accrual basis.
Frequently asked questions
What is Unit or Output Costing about?
This chapter on **Unit or Output Costing** explains a costing method used in industries producing uniform, identical products (e.g., cement, bricks, sugar). It covers how to calculate **cost per unit** by dividing total production costs by the number of units, using tools like **cost sheets** and **tender sheets**. The chapter also highlights its importance in price fixation, cost control, and managerial decision-making, along with its limitations and practical applications through solved problems.
Which topics are covered in Unit or Output Costing?
Class 12 Accounting “Unit or Output Costing” covers: Definition and scope of output/unit costing; Components and structure of a **cost sheet** (prime cost, factory cost, cost of production, cost of sales); Importance of output costing (cost ascertainment, price fixation, cost control, stock valuation); Limitations of output costing (historical data, averaging inefficiencies, arbitrary overhead allocation); Tender pricing and **tender sheets** (estimated cost + profit margin); Difference between **manufacturing account** and cost sheet; Treatment of **opening/closing stocks** (raw materials, WIP, finished goods); Practical problems: Calculating material consumed, prime cost, factory cost, and profit.
What should I focus on in Unit or Output Costing for the exam?
Focus on **solving cost sheet problems** (calculating material consumed, prime cost, factory cost, and profit) and understanding the **logical flow of costs** from raw materials to sales, including stock adjustments and overhead allocations.
What are the key formulas or definitions in Unit or Output Costing?
Cost per unit = Total cost of production ÷ Number of units produced; Prime cost = Direct material consumed + Direct wages + Direct (chargeable) expenses; Factory cost = Prime cost + Factory overheads ± Work-in-progress adjustments; Profit (if % on sales) = (Sales × Profit %) ÷ (100 − Profit %); Tender price = Estimated total cost + (Desired profit % × Cost) [or alternative profit-on-sales formula].
Where can I read the Class 12 Accounting “Unit or Output Costing” solutions?
Right on this page. They are free and you do not need to sign up. For chapter quizzes and the AI tutor, install the Sikshya Plus app.
Study tips
Do not just read it. Practice it.
You have read the solutions for Unit or Output Costing. Now test yourself, ask the AI tutor and keep your streak going.




- AI quizzes for this chapterTest yourself with instant feedback and explanations after every answer.
- AI tutor, free, 24/7Stuck on a question? Ask in your own words and get a step-by-step explanation.
- 14 AI tools in one appSummarizer, grammar checker, flashcards, essay help, math solver and more.
- Past questions and notesPast papers and your own notes organized chapter by chapter.